{"id":3892,"date":"2024-06-24T09:31:34","date_gmt":"2024-06-24T07:31:34","guid":{"rendered":"https:\/\/teamdeck.io\/?p=3892"},"modified":"2025-01-23T22:35:33","modified_gmt":"2025-01-23T20:35:33","slug":"how-to-measure-resource-utilization","status":"publish","type":"post","link":"https:\/\/teamdeck.io\/tr\/proje-yonetimi\/kaynak-kullanimi-nasil-olculur\/","title":{"rendered":"Kaynak Kullan\u0131m\u0131 Nas\u0131l Hesaplan\u0131r? Proje Y\u00f6neticileri i\u00e7in Bir K\u0131lavuz"},"content":{"rendered":"<p><strong>\u015eirketler genellikle a\u015fa\u011f\u0131dakiler i\u00e7in \u00e7ok \u00e7aba harcarlar <\/strong><a rel=\"noopener noreferrer\" href=\"https:\/\/teamdeck.io\/tr\/proje-yonetimi\/proje-yoneti\u0307ci\u0307leri\u0307-i\u0307ci\u0307n-kaynak-tahsi\u0307si\u0307\/\"><strong>kaynak tahsisi<\/strong><\/a><strong>. G\u00f6revlerinin \u015firket i\u00e7in de\u011ferli (genellikle faturaland\u0131r\u0131labilir anlam\u0131na gelir) oldu\u011fundan emin olurken herkesi me\u015fgul etmek istersiniz. Ekibiniz b\u00fcy\u00fcd\u00fck\u00e7e, \u00f6zellikle de insanlar\u0131 ayn\u0131 anda ger\u00e7ekle\u015fen birden fazla projeye ataman\u0131z gerekti\u011finde bu ger\u00e7ekten zorla\u015f\u0131r.<\/strong><\/p>\n\n\n\n<p>Makale i\u00e7eri\u011fi:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>Kaynak kullan\u0131m oran\u0131n\u0131n nas\u0131l \u00f6l\u00e7\u00fclece\u011fine dair birka\u00e7 form\u00fcl<\/p><\/li>\n\n\n\n<li><p>Kaynak kullan\u0131m\u0131nda kullan\u0131labilirlik ne anlama geliyor?<\/p><\/li>\n\n\n\n<li><p>Kurumun etkili rol\u00fc <a href=\"https:\/\/teamdeck.io\/tr\/\" rel=\"noopener noreferrer\">kaynak y\u00f6neti\u0307m yazilimi<\/a> kaynaklar\u0131n kullan\u0131m\u0131nda<\/p><\/li>\n\n\n\n<li><p>\u00dcretken kullan\u0131m ile faturaland\u0131r\u0131labilir kullan\u0131m aras\u0131ndaki farklar<\/p><\/li>\n\n\n\n<li><p>Kaynak kullan\u0131m\u0131 nas\u0131l uygulan\u0131r<\/p><\/li>\n<\/ul>\n\n\n\n<p><iframe loading=\"lazy\" title=\"NASIL: Ekip Kullan\u0131m\u0131n\u0131 \u00d6l\u00e7mek? Ekip Kullan\u0131m Raporu | Teamdeck Deste\u011fi\" width=\"1170\" height=\"658\" src=\"https:\/\/www.youtube.com\/embed\/LE2mK_jPZQc?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1164\" height=\"776\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/24135020\/MeasuringUtilization.jpg\" alt=\"\" class=\"wp-image-13642\" style=\"aspect-ratio:1;width:840px;height:auto\"\/><\/figure>\n\n\n\n<p>Tahsis \u00e7abalar\u0131n\u0131z\u0131n ba\u015far\u0131l\u0131 olup olmad\u0131\u011f\u0131n\u0131 kontrol etmenin en kolay yollar\u0131ndan biri, ekibinizin kaynak kullan\u0131m\u0131n\u0131 ve kaynak kapasitesini izlemektir. Size \u00e7e\u015fitli kaynak kullan\u0131m metriklerini ve form\u00fcllerini tan\u0131tmadan \u00f6nce, kaynak kullan\u0131m\u0131n\u0131 anla\u015f\u0131l\u0131r bir \u015fekilde tan\u0131mlamak istiyoruz. Bu nedenle bu makalede - di\u011ferlerinde oldu\u011fu gibi - proje y\u00f6neticileri taraf\u0131ndan kullan\u0131lan tan\u0131mlar\u0131n, anlamlar\u0131n ve terimlerin kar\u015f\u0131la\u015ft\u0131rmas\u0131n\u0131 sunuyoruz.<\/p>\n\n\n\n<p>\u00c7al\u0131\u015fan veya kaynak kullan\u0131m\u0131na ili\u015fkin bilgiler \"a\u015f\u0131r\u0131 kullan\u0131m\" ve \"eksik kullan\u0131m\" terimleriyle ba\u011flant\u0131l\u0131d\u0131r. Her ikisinin de fark\u0131nda olmal\u0131s\u0131n\u0131z. Neden? Bir proje s\u0131ras\u0131nda \u00e7ok fazla i\u015f veya g\u00f6rev (\u00e7oklu g\u00f6rev), projenin tamamen veya d\u00fc\u015f\u00fcn\u00fclen i\u015flevlerle bitirilmesini sa\u011flamaz. Ba\u015flamadan \u00f6nce Gartner'\u0131n ara\u015ft\u0131rmadan \u00e7\u0131kard\u0131\u011f\u0131 sonuca bir g\u00f6z at\u0131n <em>BT Proje Ekibinizin A\u015f\u0131r\u0131 Y\u00fcklenmesini Nas\u0131l \u00d6nleyebilirsiniz?<\/em>\u0130nsanlara a\u015f\u0131r\u0131 y\u00fcklenmek genellikle geri teper, performans\u0131 d\u00fc\u015f\u00fcr\u00fcr ve hatalar\u0131 art\u0131r\u0131r. Gartner ara\u015ft\u0131rmas\u0131, daha d\u00fc\u015f\u00fck kullan\u0131m oran\u0131na sahip ekiplerin i\u015f de\u011feri sunma s\u00fcresini 30% veya daha fazla azaltabilece\u011fini g\u00f6stermektedir. Bunu bilerek, kaynak kullan\u0131m oranlar\u0131n\u0131 kapatmak ve dikkatli tutmak mant\u0131kl\u0131d\u0131r.<\/p>\n\n\n\n<img decoding=\"async\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/24093112\/Zrzut-ekranu-2022-04-7-o-09.41.07-1-2.png\" alt=\"Kaynak performans\u0131 ve proje ba\u015far\u0131s\u0131 ekibin kullan\u0131m oranlar\u0131na ba\u011fl\u0131d\u0131r\"\/>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-justify\" id=\"h-the-role-of-resource-utilization-in-project-management\"><strong>Proje y\u00f6netiminde kaynak kullan\u0131m\u0131n\u0131n rol\u00fc<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-where-is-resource-utilization-in-the-project-management-process\">Kaynak kullan\u0131m\u0131 proje y\u00f6netim s\u00fcrecinin neresinde?<\/h3>\n\n\n\n<p>Proje Y\u00f6netimi Enstit\u00fcs\u00fc'n\u00fcn (PMI) tan\u0131m\u0131ndan hareketle, proje y\u00f6netimi, \"insanlar i\u00e7in de\u011fer ta\u015f\u0131yan\" bir \u015fey \u00fcretmek i\u00e7in belirli bilgi, yetkinlik, beceri, cihaz, ara\u00e7, yaz\u0131l\u0131m, s\u00fcre\u00e7 ve tekniklerin kullan\u0131lmas\u0131 olarak anla\u015f\u0131lmaktad\u0131r. Proje y\u00f6netiminin sahip olduklar\u0131m\u0131z\u0131 kullanarak bir \u015feyler yapmakla ilgili oldu\u011fu kolayca yorumlanabilir. Zihinsel ve fiziksel olarak.<\/p>\n\n\n\n<p>Alayc\u0131 olmak istersek, \"insanlara verilen de\u011fer\" ifadesinin mu\u011flakl\u0131\u011f\u0131n\u0131 kullanabilir ve \u00f6nerilen PMI proje kavram\u0131n\u0131n, siyasi veya dini bir hareket de dahil olmak \u00fczere sosyal bir hareketin yarat\u0131lmas\u0131 anlam\u0131na da gelebilece\u011fini s\u00f6yleyebiliriz.<\/p>\n\n\n\n<p>Ancak yukar\u0131da bahsedilen PMI tan\u0131m\u0131na k\u0131yasla, Proje Y\u00f6netimi Derne\u011fi'nin \u00f6nerisi daha titiz kabul edilebilir. Sonuncusu, zaman ve b\u00fct\u00e7e gibi tarafs\u0131z ve \u00f6l\u00e7\u00fclebilir kriterleri vurgulamaktad\u0131r.<\/p>\n\n\n\n<p>\u0130\u015f d\u00fcnyas\u0131nda her ikisi de - pazarl\u0131\u011fa a\u00e7\u0131k olsa da - belirli bir proje \u00e7er\u00e7evesi dayat\u0131r. \u0130ster bir m\u00fc\u015fteri \u00f6devinden isterse bir \u015firket y\u00f6neticisinin pazarlama departman\u0131na sundu\u011fu bir \u00f6devden bahsediyor olal\u0131m, \u00f6dev beklenen ya da ger\u00e7ek anlamda ticari olarak uygulanabilir bir zaman dilimi i\u00e7inde tamamlanmal\u0131 ve bir yat\u0131r\u0131m getirisi sa\u011flamal\u0131d\u0131r. APM'ye g\u00f6re: Proje y\u00f6netimi, kararla\u015ft\u0131r\u0131lan parametreler dahilinde proje kabul kriterlerine g\u00f6re belirli proje hedeflerine ula\u015fmak i\u00e7in s\u00fcre\u00e7lerin, y\u00f6ntemlerin, becerilerin, bilginin ve deneyimin uygulanmas\u0131d\u0131r. Proje y\u00f6netimi, s\u0131n\u0131rl\u0131 bir zaman \u00f6l\u00e7e\u011fi ve b\u00fct\u00e7e ile s\u0131n\u0131rland\u0131r\u0131lm\u0131\u015f nihai \u00e7\u0131kt\u0131lara sahiptir. Dolay\u0131s\u0131yla, sadece y\u00f6netimin aksine, proje y\u00f6netiminde projelerden bahsedersek, her biri bitirilmesi gereken her proje i\u00e7in zaman ve b\u00fct\u00e7e gibi talepler i\u00e7erir. Baz\u0131 proje kaynaklar\u0131 \u00f6rnekleri (birka\u00e7 gereksinimle birlikte) a\u015fa\u011f\u0131da g\u00f6sterilmi\u015ftir:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>Patlama g\u00fcc\u00fc \u00c7ar Bombas\u0131'ndan daha az olmayan bir atom bombas\u0131n\u0131 24 ay i\u00e7inde ve $50 milyonluk bir b\u00fct\u00e7eyle \u00fcretmek<\/p><\/li>\n\n\n\n<li><p>Vistula nehri \u00fczerinde 31 Mart 2025 tarihine kadar baraj in\u015fa edilmesi ve 120 milyon ABD Dolar\u0131 tutar\u0131ndaki b\u00fct\u00e7enin a\u015f\u0131lmamas\u0131<\/p><\/li>\n\n\n\n<li><p>Bir ayakkab\u0131 \u00fcreticisi i\u00e7in 12.000 USD ile 8 hafta i\u00e7inde bir masa\u00fcst\u00fc uygulamas\u0131 geli\u015ftirmek (d\u00f6n\u00fc\u015f\u00fcm yolu analizi ve en iyisini se\u00e7mek dahil)<\/p><\/li>\n<\/ul>\n\n\n\n<p>$100 000 b\u00fct\u00e7e dahilinde 12 ay i\u00e7inde bir marka konumland\u0131rmas\u0131n\u0131n (yeni BTL materyal da\u011f\u0131t\u0131m\u0131 dahil) yenilenmesi<\/p>\n\n\n\n<p>Yukar\u0131daki \u00f6rneklere bakarak, her bir projede ne kadar \u00e7ok say\u0131da ad\u0131m, idari g\u00f6rev ve prosed\u00fcr\u00fcn yer ald\u0131\u011f\u0131n\u0131 hayal edebiliriz. \u0130lgili becerilere sahip ka\u00e7 ki\u015fi bunlar\u0131n her birinin par\u00e7as\u0131 olur?<\/p>\n\n\n\n<p>Dolay\u0131s\u0131yla, yukar\u0131da da belirtildi\u011fi gibi, proje y\u00f6netimi s\u00fcrecin uygulanmas\u0131d\u0131r. Ya da do\u011frudan s\u00f6yleyebiliriz: proje bir s\u00fcre\u00e7tir. Ve bu s\u00fcre\u00e7 proje y\u00f6netimi ya\u015fam d\u00f6ng\u00fcs\u00fc olarak adland\u0131r\u0131l\u0131r. \u0130nternette bu s\u00fcrecin 3, 4, 5, hatta 6 ve 7 a\u015famaya ayr\u0131ld\u0131\u011f\u0131n\u0131 g\u00f6rebilirsiniz. Ancak en pop\u00fcler olan\u0131 bahsedilen PMI'a aittir ve 5'i varsayar.<\/p>\n\n\n\n<img decoding=\"async\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2022\/05\/27140933\/5-Project-Management-Phases.png\" alt=\"Kaynak kullan\u0131m\u0131, ekip ve \u00e7al\u0131\u015fan performans y\u00f6netiminin bir par\u00e7as\u0131d\u0131r\"\/>\n\n\n\n<p>G\u00f6rd\u00fc\u011f\u00fcn\u00fcz gibi, her a\u015fama bir g\u00f6rev grubudur ve her a\u015faman\u0131n arkas\u0131nda bir\u00e7ok farkl\u0131 konu ve zorluk vard\u0131r. Ayr\u0131ca - \u00f6zellikle proje y\u00f6neticisi olarak rollerinin en ba\u015f\u0131nda olanlar i\u00e7in - bu a\u015famalar\u0131n her zaman kronolojik olarak ele al\u0131nmamas\u0131 gerekti\u011fini de eklemek gerekir. Baz\u0131 unsurlar daha erken ba\u015flat\u0131labilirken, di\u011ferleri proje boyunca devam eden bir s\u00fcre\u00e7tir (\u00f6rne\u011fin performans y\u00f6netimi veya - bu makalenin konusuyla ilgili olarak daha kesin olmak gerekirse - kaynak planlama arac\u0131 kullan\u0131m\u0131). Ve bunlar\u0131n her biri - bir \u015fekilde - s\u00fcre\u00e7 boyunca optimize edilir. Kaynak seviyelendirme, kaynak tahsisini dengelemek ve proje ya\u015fam d\u00f6ng\u00fcs\u00fc boyunca a\u015f\u0131r\u0131 kullan\u0131m veya yetersiz kullan\u0131mdan ka\u00e7\u0131nmak i\u00e7in kullan\u0131lan \u00f6nemli bir tekniktir.<\/p>\n\n\n\n<p>Ana konuya geri d\u00f6necek olursak, PY'nin ya\u015fam d\u00f6ng\u00fcs\u00fc s\u00fcrecinin neresinde kaynak kullan\u0131m\u0131 \u00f6nemlidir?<\/p>\n\n\n\n<p>S\u00fcrecin 5 a\u015famas\u0131ndan kaynak kullan\u0131m\u0131 \u00fc\u00e7\u00fcnc\u00fc a\u015famada yer almaktad\u0131r. \u0130zleme ve kontrol a\u015famas\u0131n\u0131n bir par\u00e7as\u0131 olarak, daha do\u011frusu performans y\u00f6netiminin bir par\u00e7as\u0131 olarak.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>Ba\u015flatma ve kavrama<\/p><\/li>\n\n\n\n<li><p>Planlama<\/p><\/li>\n\n\n\n<li><p>Lansman ve uygulama<\/p><\/li>\n\n\n\n<li><p>\u0130zleme ve kontrol - <strong>performans kontrol\u00fcn\u00fc, yani kaynak kullan\u0131m\u0131n\u0131 i\u00e7erir<\/strong><\/p><\/li>\n\n\n\n<li><p>Proje kapan\u0131\u015f\u0131<\/p><\/li>\n<\/ul>\n\n\n\n<p>Liderler i\u00e7in kaynak kullan\u0131m\u0131, performans y\u00f6netimindeki en de\u011ferli ve faydal\u0131 metrik ve KPI'd\u0131r.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1207\" height=\"803\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/24135020\/MeasuringUtilization1.jpeg\" alt=\"\" class=\"wp-image-13644\"\/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-the-most-valuable-metrics-in-performance-management-the-resource-utilization-and-resource-allocation\">Performans y\u00f6netimindeki en de\u011ferli \u00f6l\u00e7\u00fctler - kaynak kullan\u0131m\u0131 ve kaynak tahsisi<\/h3>\n\n\n\n<p>Bildi\u011fimiz gibi, kaynak planlama ve kaynak \u00e7izelgeleme, bir proje plan\u0131n\u0131n ba\u015far\u0131l\u0131 olmas\u0131n\u0131 sa\u011flamak i\u00e7in \u00e7ok \u00f6nemlidir. Kaynaklar\u0131n verimli bir \u015fekilde kullan\u0131lmas\u0131, bu bulmacalar\u0131n bir ba\u015fka par\u00e7as\u0131d\u0131r veya - s\u00f6ylemek istedi\u011fimiz gibi - kaynak y\u00f6netimi. Kaynak tahsisi - basit\u00e7e s\u00f6ylemek gerekirse - bir g\u00f6reve yetenekli bir kayna\u011f\u0131n atanmas\u0131 anlam\u0131na gelirken, kaynak kullan\u0131m\u0131, bu kayna\u011f\u0131n atanan g\u00f6rev s\u0131ras\u0131nda harcad\u0131\u011f\u0131 etkinli\u011fi ve zaman\u0131 \u00f6l\u00e7er (faturaland\u0131r\u0131labilir veya stratejik \u00e7al\u0131\u015fma, faturaland\u0131r\u0131lamayan saatler\/dakikalar, y\u00f6netici saatleri\/dakikalar\u0131, vb.)<\/p>\n\n\n\n<img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"909\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15003849\/Zrzut-ekranu-2022-04-7-o-09.46.06-1-1280x909.png\" alt=\"\" class=\"wp-image-13525\" srcset=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15003849\/Zrzut-ekranu-2022-04-7-o-09.46.06-1-1280x909.png 1280w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15003849\/Zrzut-ekranu-2022-04-7-o-09.46.06-1-300x213.png 300w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15003849\/Zrzut-ekranu-2022-04-7-o-09.46.06-1-768x545.png 768w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15003849\/Zrzut-ekranu-2022-04-7-o-09.46.06-1-18x12.png 18w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15003849\/Zrzut-ekranu-2022-04-7-o-09.46.06-1.png 1392w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/>\n\n\n\n<p>Kaynak kullan\u0131m\u0131, proje y\u00f6neticilerinin ve kaynak y\u00f6neticilerinin \u00e7al\u0131\u015fanlar\u0131n\u0131n bir proje s\u0131ras\u0131nda zamanlar\u0131n\u0131 nas\u0131l harcad\u0131klar\u0131n\u0131 \u00f6\u011frenmelerine yard\u0131mc\u0131 olan bir g\u00f6stergeye kar\u015f\u0131l\u0131k gelir. Bu bilgi sayesinde, \u00fcretkenli\u011fi ve karl\u0131l\u0131\u011f\u0131 art\u0131ran \u00e7ok daha verimli kaynak kullan\u0131m\u0131 yarg\u0131lar\u0131 ve kararlar\u0131 al\u0131rlar. Kaynak kullan\u0131m\u0131, her bir \u00e7al\u0131\u015fan\u0131n \u00fcretkenli\u011fini ve\/veya t\u00fcm ekibin kullan\u0131m oran\u0131 form\u00fcl\u00fcn\u00fc \u00f6l\u00e7er. \u00c7al\u0131\u015fanlar\u0131n\u0131z\u0131n a\u015f\u0131r\u0131 m\u0131 yoksa az m\u0131 kullan\u0131ld\u0131\u011f\u0131n\u0131 izler ve i\u015f y\u00fck\u00fc y\u00f6netimi politikas\u0131n\u0131 belirler.<\/p>\n\n\n\n<p>Daha do\u011fru bir ifadeyle, proje y\u00f6neticileri ve i\u015f perspektiflerinden kaynak kullan\u0131m oran\u0131n\u0131 hesaplamak, bir \u00e7al\u0131\u015fan\u0131n faturaland\u0131r\u0131labilir g\u00f6revler veya projeler i\u00e7in kullan\u0131lan mevcut zaman\u0131n\u0131n y\u00fczdesini tan\u0131mlamak i\u00e7in kullan\u0131lan bir terimdir. Kaynak kullan\u0131m oranlar\u0131, ekibinizin zaman\u0131n\u0131n ne kadar\u0131n\u0131n faturaland\u0131r\u0131labilir g\u00f6revlere harcand\u0131\u011f\u0131n\u0131 ve her ekip \u00fcyesinin ne kadar \u00fcretken oldu\u011funu g\u00f6sterir. Kaynak tahmini, proje y\u00f6neticilerinin mevcut kullan\u0131m \u00f6l\u00e7\u00fcmlerine dayanarak gelecekteki kaynak ihtiya\u00e7lar\u0131n\u0131 tahmin etmelerine yard\u0131mc\u0131 olur.<\/p>\n\n\n\n<p>Ba\u015fka bir deyi\u015fle, kaynak kullan\u0131m\u0131, t\u00fcm ekibinizin veya belirli \u00e7al\u0131\u015fanlar\u0131n tamamen dolu olup olmad\u0131\u011f\u0131n\u0131 g\u00f6steren bir metriktir. Projeyi planlama ve \u015firketteki mevcut kaynaklardan en iyi \u015fekilde yararlanma s\u00fcrecini ifade eder.<\/p>\n\n\n\n<p>\u00d6rne\u011fin, bir ki\u015finin zaten a\u015f\u0131r\u0131 kullan\u0131ld\u0131\u011f\u0131n\u0131 ve kafas\u0131nda \u00e7ok fazla \u015fey oldu\u011funu bildi\u011finizde, projenize uyacak benzer bir beceri setine sahip ba\u015fka birini arayabilirsiniz. Bu metrik ayn\u0131 zamanda yeterince kullan\u0131lmayan ki\u015filerin belirlenmesine de yard\u0131mc\u0131 olur, b\u00f6ylece onlara yeni projeler atayabilirsiniz.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1201\" height=\"793\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/24135020\/MeasuringUtilization3.jpeg\" alt=\"\" class=\"wp-image-13645\"\/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-justify\" id=\"h-how-to-calculate-resource-utilization-nbsp\"><strong>Kaynak kullan\u0131m\u0131 nas\u0131l hesaplan\u0131r?&nbsp;<\/strong><\/h2>\n\n\n\n<p>Bunu anlaman\u0131n tek yolu, se\u00e7enekleri g\u00f6zden ge\u00e7irmek ve ihtiya\u00e7lar\u0131n\u0131za en uygun olan\u0131 se\u00e7mektir. Kaynak optimizasyon teknikleri, kaynak kullan\u0131m hesaplamalar\u0131n\u0131z\u0131n verimlili\u011fini ve do\u011frulu\u011funu art\u0131rman\u0131za yard\u0131mc\u0131 olabilir.<\/p>\n\n\n\n<p>Tipik kaynak kullan\u0131m form\u00fcl\u00fc \u015f\u00f6yledir:<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center\" id=\"h-resource-utilization-rate-busy-time-available-time\"><strong><em>Kaynak kullan\u0131m oran\u0131 = Me\u015fgul zaman \/ Kullan\u0131labilir zaman<\/em><\/strong><\/h3>\n\n\n\n<p>Y\u00fczde olarak ifade edilen bu de\u011fer, ekibinizin zaman\u0131n\u0131n ne kadar\u0131n\u0131 \u00e7al\u0131\u015farak ge\u00e7irdi\u011fini g\u00f6sterir.<\/p>\n\n\n\n<p>Kula\u011fa basit gelse de, kaynak kullan\u0131m\u0131n\u0131 \u00f6l\u00e7meye \u00e7al\u0131\u015f\u0131rken ortaya \u00e7\u0131kan birka\u00e7 soru vard\u0131r. Hesaplaman\u0131z\u0131 ger\u00e7ek \u00e7al\u0131\u015fma s\u00fcresine mi dayand\u0131rmal\u0131s\u0131n\u0131z (<a rel=\"noopener noreferrer\" href=\"https:\/\/teamdeck.io\/tr\/proje-yonetimi\/zaman-cizelgesi-yonetimi\/\">zaman \u00e7izelgeleri<\/a>) veya daha ziyade planlanm\u0131\u015f \u00e7al\u0131\u015fma s\u00fcresi? Peki ya tatiller ve <a rel=\"noopener noreferrer\" href=\"https:\/\/teamdeck.io\/tr\/liderlik\/ucretli\u0307-i\u0307zi\u0307n-poli\u0307ti\u0307kasi-taki\u0307bi\u0307\/\">\u00fccretli izin<\/a>? Ekibinizin kaynak kullan\u0131m plan\u0131n\u0131 ne s\u0131kl\u0131kla takip etmelisiniz? \u0130yi tan\u0131mlanm\u0131\u015f bir kaynak tahsis stratejisi, kaynak kullan\u0131m oran\u0131 hesaplamalar\u0131n\u0131z\u0131n do\u011frulu\u011funu \u00f6nemli \u00f6l\u00e7\u00fcde etkileyebilir.<\/p>\n\n\n\n<img decoding=\"async\" src=\"https:\/\/teamdeck.io\/wp-content\/uploads\/2024\/06\/Zrzut-ekranu-2022-04-6-o-09.40.24-2-2.png\" alt=\"Verimlilik verilerini art\u0131rmak i\u00e7in aktif projelerin kaynak kullan\u0131m oran\u0131n\u0131 olu\u015fturun\"\/>\n\n\n\n<p>Cevap: duruma g\u00f6re de\u011fi\u015fir. O kadar \u00e7ok de\u011fi\u015fken var ki evrensel olarak iyi bir \u00e7\u00f6z\u00fcm \u00f6nermek neredeyse imkans\u0131z. Bunu anlaman\u0131n tek yolu, se\u00e7enekleri g\u00f6zden ge\u00e7irmek ve ihtiya\u00e7lar\u0131n\u0131za en uygun olan\u0131 se\u00e7mektir.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-justify\" id=\"h-compare-bookings-with-your-team-s-availability\"><strong>Rezervasyonlar\u0131 ekibinizin m\u00fcsaitlik durumu ile kar\u015f\u0131la\u015ft\u0131r\u0131n<\/strong><\/h2>\n\n\n\n<p>Kaynak kapasitesi kullan\u0131m\u0131n\u0131 \u00f6l\u00e7menin bir yolu, kullan\u0131labilirliklerini planlanan \u00e7al\u0131\u015fma saatleriyle kar\u015f\u0131la\u015ft\u0131rmakt\u0131r.<\/p>\n\n\n\n<p>Etkili kaynak planlamas\u0131, rezervasyonlar\u0131n ekip mevcudiyetiyle uyumlu olmas\u0131n\u0131 sa\u011flamak i\u00e7in \u00e7ok \u00f6nemlidir.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center\" id=\"h-resource-utilization-planned-working-hours-bookings-available-hours\"><strong><em>Kaynak kullan\u0131m\u0131 = Planlanan \u00e7al\u0131\u015fma saatleri (rezervasyonlar) \/ Mevcut saatler<\/em><\/strong><\/h3>\n\n\n\n<img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"667\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15004029\/Zrzut-ekranu-2022-04-6-o-09.40.24-2-1280x667.png\" alt=\"\" class=\"wp-image-13528\" srcset=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15004029\/Zrzut-ekranu-2022-04-6-o-09.40.24-2-1280x667.png 1280w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15004029\/Zrzut-ekranu-2022-04-6-o-09.40.24-2-300x156.png 300w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15004029\/Zrzut-ekranu-2022-04-6-o-09.40.24-2-768x400.png 768w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15004029\/Zrzut-ekranu-2022-04-6-o-09.40.24-2-1536x800.png 1536w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15004029\/Zrzut-ekranu-2022-04-6-o-09.40.24-2-2048x1067.png 2048w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15004029\/Zrzut-ekranu-2022-04-6-o-09.40.24-2-18x9.png 18w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/>\n\n\n\n<p>Bu y\u00f6ntemin temel avantaj\u0131, puan \u00e7ok d\u00fc\u015f\u00fckse, planlar\u0131n\u0131z\u0131 yine de optimize edebilmenizdir. Program\u0131n\u0131za gidin ve projelerinizin do\u011fru planlan\u0131p planlanmad\u0131\u011f\u0131n\u0131 g\u00f6r\u00fcn. Kapsaml\u0131 bir kaynak tahsis plan\u0131, t\u00fcm kaynaklar\u0131n etkin bir \u015fekilde kullan\u0131lmas\u0131n\u0131 ve bo\u015fluklar\u0131n en aza indirilmesini sa\u011flamaya yard\u0131mc\u0131 olabilir. Belki de baz\u0131 ki\u015filerin rezervasyonlar\u0131nda bo\u015fluklar vard\u0131r ya da \u00f6rne\u011fin bir projede 1 ki\u015fi tam zamanl\u0131 \u00e7al\u0131\u015fabilecekken iki geli\u015ftiriciniz haftada 4 saat \u00e7al\u0131\u015f\u0131yordur?<\/p>\n\n\n\n<p>Ekibinizin program\u0131ndaki bo\u015fluklar\u0131 nas\u0131l doldurabilece\u011finizi belirleyin. Belki de bir Ar-Ge projesi ba\u015flatmal\u0131 ya da inovasyon izni vermelisiniz? Bu sadece \u00fcretkenlik kayb\u0131n\u0131 \u00f6nlemenize yard\u0131mc\u0131 olmakla kalmaz, ayn\u0131 zamanda insanlar\u0131n kat\u0131l\u0131m\u0131n\u0131 sa\u011flamak i\u00e7in de iyi bir yoldur. <a rel=\"noopener noreferrer\" href=\"https:\/\/hackernoon.com\/having-too-little-to-do-makes-people-unhappy-8afa21ea098e\">Yetersiz istihdam \u00e7al\u0131\u015fanlar\u0131n\u0131z i\u00e7in sand\u0131\u011f\u0131n\u0131zdan daha sinir bozucudur<\/a>.<\/p>\n\n\n\n<p>\u00c7ok fazla i\u015fi olan insanlara dikkat edin. G\u00f6revlerinin zaman\u0131nda teslim edilememe riski vard\u0131r (ayr\u0131ca, yorgun olmalar\u0131n\u0131 istemezsiniz). Fazla i\u015f yapmalar\u0131, yeni ekip \u00fcyeleri i\u015fe alman\u0131z gerekti\u011fini g\u00f6sterebilir.<\/p>\n\n\n\n<p>Son olarak, tahmini kaynak kullan\u0131m\u0131n\u0131 hesaplamak, sat\u0131\u015f ekibinizin \u00fcretim hatt\u0131n\u0131zda ne kadar yer kald\u0131\u011f\u0131n\u0131 g\u00f6rmesi i\u00e7in kolay bir yoldur. Bu \u015fekilde i\u015f f\u0131rsatlar\u0131n\u0131 ka\u00e7\u0131rma (veya zaman\u0131nda teslim edemeyece\u011finiz projeleri \u00fcstlenme) olas\u0131l\u0131\u011f\u0131n\u0131z azal\u0131r.<\/p>\n\n\n\n<p>Sonu\u00e7 olarak, rezervasyonlara dayal\u0131 kaynak kullan\u0131m puan\u0131n\u0131z\u0131 analiz etmek, kaynak kullan\u0131m\u0131n\u0131 ve tahsisini optimize etmenize ve iyile\u015ftirmenize ve sat\u0131\u015f veya i\u015fe al\u0131m ihtiya\u00e7lar\u0131n\u0131 tahmin etmenize yard\u0131mc\u0131 olur.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"2024\" height=\"1338\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/24142226\/ProjectOnboarding8.jpg\" alt=\"\" class=\"wp-image-13619\"\/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-justify\" id=\"h-compare-timesheets-with-your-team-s-availability\"><strong>Zaman \u00e7izelgelerini ekibinizin m\u00fcsaitlik durumu ile kar\u015f\u0131la\u015ft\u0131r\u0131n<\/strong><\/h2>\n\n\n\n<p>Kaynaklar\u0131 \u00f6l\u00e7menin ve optimum kullan\u0131m oranlar\u0131na ula\u015fman\u0131n bir ba\u015fka yolu da ekibinizin kay\u0131tl\u0131 saatlerini (zaman \u00e7izelgeleri) mevcut saatleriyle kar\u015f\u0131la\u015ft\u0131rmakt\u0131r. Bir\u00e7ok ki\u015fi bunun kaynak kullan\u0131m\u0131n\u0131n nas\u0131l hesaplanaca\u011f\u0131n\u0131 kesin olarak g\u00f6stermenin tek yolu oldu\u011funa inan\u0131r, \u00e7\u00fcnk\u00fc sadece tahminlere g\u00f6re de\u011fil, ger\u00e7ek \u00e7al\u0131\u015fma saatlerine g\u00f6re \u00e7al\u0131\u015f\u0131rs\u0131n\u0131z. Kaynak takibi, zaman i\u00e7inde kaynak kullan\u0131m\u0131n\u0131 do\u011fru bir \u015fekilde izlemek ve kaydetmek i\u00e7in gereklidir.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center\" id=\"h-resource-utilization-recorded-working-hours-available-hours\"><strong><em>Kaynak kullan\u0131m\u0131 = Kaydedilen \u00e7al\u0131\u015fma saatleri \/ Kullan\u0131labilir saatler<\/em><\/strong><\/h3>\n\n\n\n<p>Bir\u00e7ok ki\u015fi kaynak kullan\u0131m\u0131n\u0131n nas\u0131l hesaplanaca\u011f\u0131n\u0131 kesin olarak g\u00f6stermenin tek yolunun bu oldu\u011funa inanmaktad\u0131r, \u00e7\u00fcnk\u00fc sadece tahminler de\u011fil, ger\u00e7ek \u00e7al\u0131\u015fma saatleri \u00fczerinde \u00e7al\u0131\u015f\u0131yorsunuz.<\/p>\n\n\n\n<p>Bu ge\u00e7mi\u015fe d\u00f6n\u00fck bir puan oldu\u011fundan, puan\u0131n\u0131z hayal k\u0131r\u0131kl\u0131\u011f\u0131 yaratsa bile genellikle hasar\u0131 geri alamazs\u0131n\u0131z. Ancak gelecekte daha iyi kararlar alman\u0131za yard\u0131mc\u0131 olur.<\/p>\n\n\n\n<img loading=\"lazy\" decoding=\"async\" width=\"2542\" height=\"1324\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/23223407\/MeasuringUtilization4.png\" alt=\"\" class=\"wp-image-13646\" srcset=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/23223407\/MeasuringUtilization4.png 2542w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/23223407\/MeasuringUtilization4-300x156.png 300w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/23223407\/MeasuringUtilization4-1280x667.png 1280w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/23223407\/MeasuringUtilization4-768x400.png 768w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/23223407\/MeasuringUtilization4-1536x800.png 1536w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/23223407\/MeasuringUtilization4-2048x1067.png 2048w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/23223407\/MeasuringUtilization4-18x9.png 18w\" sizes=\"auto, (max-width: 2542px) 100vw, 2542px\" \/>\n\n\n\n<p>Ekip kaynak kullan\u0131m\u0131na ili\u015fkin ge\u00e7mi\u015f veriler farkl\u0131l\u0131k g\u00f6sterir ve fazladan ki\u015fi i\u015fe alman\u0131z (veya mevcut ekip \u00fcyeleriniz i\u00e7in fazladan g\u00f6revler bulman\u0131z) gerekip gerekmedi\u011fine dair iyi bir g\u00f6sterge olabilir. \u00c7al\u0131\u015fanlar\u0131n\u0131z\u0131n ne kadar \u00fcretken olma e\u011filiminde oldu\u011funu da kontrol edebilirsiniz.<\/p>\n\n\n\n<p>Benim tavsiyem, kaynak kullan\u0131m\u0131n\u0131 hesaplamak i\u00e7in her iki y\u00f6ntemi de kullanmak olacakt\u0131r. Ger\u00e7ek (kaydedilen) kullan\u0131m ile tahmini (rezervasyonlara dayal\u0131) kullan\u0131m\u0131 kar\u015f\u0131la\u015ft\u0131r\u0131n ve farklar\u0131 analiz edin. Bunlar i\u015f y\u00fck\u00fc tahmini veya proje y\u00f6netimi sorunlar\u0131na i\u015faret edebilir. Tahmini kullan\u0131m puan\u0131n\u0131n \u00fczerinde veya alt\u0131nda tekrarlanan ki\u015fi veya proje olup olmad\u0131\u011f\u0131n\u0131 kontrol edin. Bu t\u00fcr bir analiz, iyile\u015ftirme alanlar\u0131n\u0131 tespit etmenize ve harekete ge\u00e7menize olanak tan\u0131r. Kaynak kullan\u0131m analizi, proje y\u00f6neticilerinin kal\u0131plar\u0131 anlamas\u0131na ve gelecekteki projeler i\u00e7in veriye dayal\u0131 kararlar almas\u0131na yard\u0131mc\u0131 olur.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-justify\" id=\"h-how-to-define-availability-and-why-it-s-important-for-the-results-of-resource-utilization-nbsp\"><strong>\"Kullan\u0131labilirlik\" nas\u0131l tan\u0131mlan\u0131r ve kaynak kullan\u0131m\u0131n\u0131n sonu\u00e7lar\u0131 i\u00e7in neden \u00f6nemlidir?&nbsp;<\/strong><\/h2>\n\n\n\n<p>Art\u0131k kaynak kullan\u0131m\u0131n\u0131 hesaplamak i\u00e7in farkl\u0131 form\u00fcller bildi\u011finize g\u00f6re, i\u015fleri biraz daha karma\u015f\u0131k hale getirmenin zaman\u0131 geldi. \u015eimdiye kadar \"kullan\u0131labilir saat\" terimini kulland\u0131k. Ama bu ne anlama geliyor? Kullan\u0131labilirli\u011fi \u00e7al\u0131\u015fan\u0131n\u0131z\u0131n i\u015fte oldu\u011fu s\u00fcre olarak m\u0131 d\u00fc\u015f\u00fcnmelisiniz? Yoksa tatilleri ve resmi tatilleri de dahil etmeli misiniz?<\/p>\n\n\n\n<p>\u0130lk ba\u015fta, izin s\u00fcresini genel kullan\u0131labilirli\u011fe dahil etmenin mant\u0131\u011fa ayk\u0131r\u0131 oldu\u011funu d\u00fc\u015f\u00fcnebilirsiniz, sonu\u00e7ta insanlar a\u00e7\u0131k\u00e7a <em>mevcut<\/em> o zaman. Bununla birlikte, sabit \u00fccretle \u00e7al\u0131\u015f\u0131yorsan\u0131z, \u00e7al\u0131\u015fanlar\u0131n\u0131za bu s\u00fcre i\u00e7in tazminat \u00f6demeniz gerekebilece\u011fini g\u00f6z \u00f6n\u00fcnde bulundurun.<\/p>\n\n\n\n<p>Bir i\u015fveren olarak, ekip \u00fcyelerinizin ger\u00e7ekte ne kadar zaman harcad\u0131\u011f\u0131n\u0131 g\u00f6rmek isteyebilirsiniz. Hesaplaman\u0131za izin s\u00fcresini de dahil etmeye karar verirseniz, ekibinizin ideal kaynak kullan\u0131m oran\u0131n\u0131n en yo\u011fun tatil aylar\u0131nda (Aral\u0131k ve A\u011fustos) \u00f6nemli \u00f6l\u00e7\u00fcde daha d\u00fc\u015f\u00fck olabilece\u011fini unutmay\u0131n. Kaynak kullan\u0131labilirli\u011fi planlamas\u0131, en yo\u011fun tatil d\u00f6nemlerinde bile ihtiya\u00e7 duyuldu\u011funda do\u011fru kaynaklara sahip olman\u0131z\u0131 sa\u011flamaya yard\u0131mc\u0131 olur.<\/p>\n\n\n\n<p>Baz\u0131 \u015firketler sabit saat say\u0131s\u0131 olarak 2080'i kullanmaktad\u0131r (52 hafta * 40 saat). Di\u011ferleri ise belirli bir y\u0131ldaki mevcut \u00e7al\u0131\u015fma saatlerinin ger\u00e7ek say\u0131s\u0131n\u0131 hesaplar. Daha geli\u015fmi\u015f filtreleme yapmak istiyorsan\u0131z (\u00f6rne\u011fin, tatil saatlerini dahil etmek, resmi tatilleri hari\u00e7 tutmak, dikkate almak <a rel=\"noopener noreferrer\" href=\"https:\/\/teamdeck.io\/tr\/proje-yonetimi\/yari-zamanli-calisanlarin-yonetimi\/\">yar\u0131 zamanl\u0131 \u00e7al\u0131\u015fanlar<\/a>), kaynak y\u00f6netimi yaz\u0131l\u0131m\u0131 kullanmay\u0131 d\u00fc\u015f\u00fcnmelisiniz.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-justify\" id=\"h-productive-utilization-and-billable-resource-utilization\"><strong>\u00dcretken kullan\u0131m ve faturaland\u0131r\u0131labilir kaynak kullan\u0131m\u0131<\/strong><\/h2>\n\n\n\n<p>\"M\u00fcsait saatler\" tan\u0131m\u0131n\u0131z haz\u0131r oldu\u011funda, \"\u00e7al\u0131\u015fma saatleri\" olarak adland\u0131rd\u0131\u011f\u0131n\u0131z \u015feyin ne oldu\u011funu d\u00fc\u015f\u00fcnmelisiniz. \u00c7al\u0131\u015fanlar\u0131n\u0131z\u0131n i\u015fle ilgili faaliyetler i\u00e7in harcad\u0131klar\u0131 t\u00fcm saatlerden mi bahsediyorsunuz, \u00f6rne\u011fin dahili bir proje olu\u015fturmak gibi? Ya da belki de m\u00fc\u015fterilerinizden \u00fccret alabilece\u011finiz \u015feyler \u00fczerinde \u00e7al\u0131\u015farak ge\u00e7irdikleri saatlerden.<\/p>\n\n\n\n<p>T\u00fcm yo\u011fun saatleri dikkate alan \"\u00fcretken kullan\u0131m\" ve \"faturaland\u0131r\u0131labilir kullan\u0131m\" olarak adland\u0131r\u0131lan hesaplamalar\u0131 yapabilirsiniz. \u0130kincisi \u00f6zellikle ajanslar, dan\u0131\u015fmanl\u0131klar veya yaz\u0131l\u0131m evleri i\u00e7in de\u011ferlidir: m\u00fc\u015fterileri i\u00e7in projeler \u00fczerinde \u00e7al\u0131\u015fan \u015firketler. Faturaland\u0131r\u0131labilir kullan\u0131m ile \u00e7al\u0131\u015fanlar\u0131n\u0131z\u0131n ger\u00e7ekten para kazand\u0131ran i\u015flere ne kadar zaman ay\u0131rd\u0131\u011f\u0131n\u0131 \u00f6l\u00e7ebilirsiniz. Kaynak faturaland\u0131rmas\u0131, m\u00fc\u015fteri projeleri i\u00e7in faturaland\u0131r\u0131labilir saatleri izlemek ve y\u00f6netmek i\u00e7in \u00e7ok \u00f6nemlidir.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-justify\" id=\"h-measure-resource-utilization-in-real-time\"><strong>Kaynak kullan\u0131m\u0131n\u0131 ger\u00e7ek zamanl\u0131 olarak \u00f6l\u00e7\u00fcn<\/strong><\/h2>\n\n\n\n<p>Kaynak kullan\u0131labilirli\u011fini ve kullan\u0131m\u0131n\u0131 \u00f6l\u00e7mek i\u00e7in kullanaca\u011f\u0131n\u0131z form\u00fcl\u00fc belirlemi\u015f olabilirsiniz, ancak s\u00fcrekli de\u011fi\u015fen verileri hesaba katman\u0131z gerekir. \u0130nsanlar\u0131n gelecekteki m\u00fcsaitlik durumu, her izin istediklerinde veya hastaland\u0131klar\u0131nda de\u011fi\u015fir ve bu da rezervasyonlar\u0131n\u0131z\u0131 etkiler.<\/p>\n\n\n\n<p>Verilerinizin d\u00fczenli olarak g\u00fcncellenmesi ve ekip kullan\u0131m puan\u0131n\u0131z\u0131n da ger\u00e7ek zamanl\u0131 olarak ayarlanmas\u0131 gerekti\u011fini d\u00fc\u015f\u00fcnmek i\u00e7in her t\u00fcrl\u00fc neden vard\u0131r. Bunu takip etmenin en kolay yolu kaynak y\u00f6netimi yaz\u0131l\u0131m\u0131 kullanmakt\u0131r. Ger\u00e7ek zamanl\u0131 kaynak y\u00f6netimi, mevcut verilere dayal\u0131 olarak kaynak tahsisinde dinamik ayarlamalar yap\u0131lmas\u0131na olanak tan\u0131r. Teamdeck'i, i\u015finize odaklanabilmeniz i\u00e7in \u00e7abalar\u0131n\u0131z\u0131 otomatikle\u015ftirebilecek bir kaynak y\u00f6netimi arac\u0131 olarak geli\u015ftirdik. <a rel=\"noopener noreferrer\" href=\"https:\/\/teamdeck.io\/tr\/proje-yonetimi\/proje-yoneticisi-vs-kaynak-yoneticisi\/\">proje y\u00f6netimi g\u00f6revleri.<\/a><\/p>\n\n\n\n<img decoding=\"async\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/15175323\/team_utilization.png\" alt=\"Kaynak y\u00f6neticileri i\u00e7in ger\u00e7ek zamanl\u0131 kullan\u0131m raporlar\u0131\"\/>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-justify\" id=\"h-how-does-the-resource-management-software-help-with-resource-utilization\"><strong>Kaynak y\u00f6netimi yaz\u0131l\u0131m\u0131 kaynak kullan\u0131m\u0131na nas\u0131l yard\u0131mc\u0131 olur?<\/strong><\/h2>\n\n\n\n<p>Teamdeck hesaplamalar\u0131n\u0131z i\u00e7in \u00fc\u00e7 t\u00fcr veri noktas\u0131 kullan\u0131r:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>uygunluk (izin veya resmi tatillerin yan\u0131 s\u0131ra),<\/p><\/li>\n\n\n\n<li><p>rezervasyonlar (planlanan \u00e7al\u0131\u015fma saatleri),<\/p><\/li>\n\n\n\n<li><p>zaman \u00e7izelgeleri (kaydedilen \u00e7al\u0131\u015fma saatleri).<\/p><\/li>\n<\/ul>\n\n\n\n<img decoding=\"async\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/15175244\/measure_resource_utilization.png\" alt=\"Teamdeck ile kaynak kullan\u0131m\u0131n\u0131 takip edin\"\/>\n\n\n\n<p>Bu \u015fekilde tahmini ve ger\u00e7ek ekip kullan\u0131m\u0131n\u0131 hesaplayabilir ve daha sonra bunlar\u0131 kar\u015f\u0131la\u015ft\u0131rabilirsiniz. Bu yaz\u0131l\u0131m, verilerinizi g\u00f6rselle\u015ftirmenize ve bireysel ekip \u00fcyelerinizle (veya m\u00fc\u015fterinizle) payla\u015fman\u0131za olanak tan\u0131yan bir raporlama paketi ile birlikte gelir. Kaynak y\u00f6netimi ara\u00e7lar\u0131, kaynak kullan\u0131m\u0131n\u0131 izlemek, analiz etmek ve optimize etmek i\u00e7in kapsaml\u0131 \u00f6zellikler sa\u011flar.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-center\" id=\"h-looking-for-software-that-helps-with-resource-utilization\"><strong>Kaynak kullan\u0131m\u0131na yard\u0131mc\u0131 olacak bir yaz\u0131l\u0131m m\u0131 ar\u0131yorsunuz?<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center\" id=\"h-effective-resource-utilization-thanks-to-teamdeck-io\">Teamdeck.io sayesinde etkin kaynak kullan\u0131m\u0131<\/h3>","protected":false},"excerpt":{"rendered":"\u015eirketler genellikle kaynak tahsisi i\u00e7in \u00e7ok \u00e7aba sarf eder. G\u00f6revlerinin \u015firket i\u00e7in de\u011ferli (ki bu genellikle faturaland\u0131r\u0131labilir anlam\u0131na gelir) oldu\u011fundan emin olurken herkesi me\u015fgul etmek istersiniz. Ekibiniz b\u00fcy\u00fcd\u00fck\u00e7e i\u015f ger\u00e7ekten zorla\u015f\u0131r...","protected":false},"author":6,"featured_media":8529,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22,39],"tags":[47],"class_list":["post-3892","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management","category-teamdeck","tag-resource-utilization"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v23.8 (Yoast SEO v24.3) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Resource Utilization - How Project Managers Measure It?<\/title>\n<meta name=\"description\" content=\"How do you know if you\u2019ve allocated resources at your organization successfully? Here are some ideas to help you measure resource utilization.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teamdeck.io\/tr\/proje-yonetimi\/kaynak-kullanimi-nasil-olculur\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to Measure Resource Utilization? - Teamdeck.io\" \/>\n<meta property=\"og:description\" content=\"How do you know if you\u2019ve allocated resources at your organization successfully? Here are some ideas to help you measure resource utilization.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teamdeck.io\/tr\/proje-yonetimi\/kaynak-kullanimi-nasil-olculur\/\" \/>\n<meta property=\"og:site_name\" content=\"Teamdeck\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/helloteamdeck\" \/>\n<meta property=\"article:published_time\" content=\"2024-06-24T07:31:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-01-23T20:35:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/15175122\/how-to-measure-resource-utilization.png\" \/>\n<meta name=\"author\" content=\"Ania Kitowska\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"How to Measure Resource Utilization? - Teamdeck.io\" \/>\n<meta name=\"twitter:description\" content=\"How do you know if you\u2019ve allocated resources at your organization successfully? Here are some ideas to help you measure resource utilization.\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/15175122\/how-to-measure-resource-utilization.png\" \/>\n<meta name=\"twitter:creator\" content=\"@helloteamdeck\" \/>\n<meta name=\"twitter:site\" content=\"@helloteamdeck\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ania Kitowska\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/\",\"url\":\"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/\",\"name\":\"Resource Utilization - How Project Managers Measure It?\",\"isPartOf\":{\"@id\":\"https:\/\/teamdeck.io\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/17161903\/How-to-Measure-Resource-Utilization-1.jpeg\",\"datePublished\":\"2024-06-24T07:31:34+00:00\",\"dateModified\":\"2025-01-23T20:35:33+00:00\",\"author\":{\"@id\":\"https:\/\/teamdeck.io\/#\/schema\/person\/38139dc474576295e51cfae1580d697e\"},\"description\":\"How do you know if you\u2019ve allocated resources at your organization successfully? Here are some ideas to help you measure resource utilization.\",\"breadcrumb\":{\"@id\":\"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#breadcrumb\"},\"inLanguage\":\"tr-TR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr-TR\",\"@id\":\"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#primaryimage\",\"url\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/17161903\/How-to-Measure-Resource-Utilization-1.jpeg\",\"contentUrl\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/17161903\/How-to-Measure-Resource-Utilization-1.jpeg\",\"width\":1469,\"height\":981,\"caption\":\"Helping project managers to calculate resource utilization\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/teamdeck.io\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to Calculate Resource Utilization: A Guide for Project Managers\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/teamdeck.io\/#website\",\"url\":\"https:\/\/teamdeck.io\/\",\"name\":\"Teamdeck\",\"description\":\"resource scheduling + time tracking + leave management\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/teamdeck.io\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr-TR\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/teamdeck.io\/#\/schema\/person\/38139dc474576295e51cfae1580d697e\",\"name\":\"Ania Kitowska\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr-TR\",\"@id\":\"https:\/\/teamdeck.io\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113607\/aniaprofil%C3%B3wka-150x150.jpg\",\"contentUrl\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113607\/aniaprofil%C3%B3wka-150x150.jpg\",\"caption\":\"Ania Kitowska\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Resource Utilization - How Project Managers Measure It?","description":"How do you know if you\u2019ve allocated resources at your organization successfully? Here are some ideas to help you measure resource utilization.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teamdeck.io\/tr\/proje-yonetimi\/kaynak-kullanimi-nasil-olculur\/","og_locale":"tr_TR","og_type":"article","og_title":"How to Measure Resource Utilization? - Teamdeck.io","og_description":"How do you know if you\u2019ve allocated resources at your organization successfully? Here are some ideas to help you measure resource utilization.","og_url":"https:\/\/teamdeck.io\/tr\/proje-yonetimi\/kaynak-kullanimi-nasil-olculur\/","og_site_name":"Teamdeck","article_publisher":"https:\/\/www.facebook.com\/helloteamdeck","article_published_time":"2024-06-24T07:31:34+00:00","article_modified_time":"2025-01-23T20:35:33+00:00","og_image":[{"url":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/15175122\/how-to-measure-resource-utilization.png","type":"","width":"","height":""}],"author":"Ania Kitowska","twitter_card":"summary_large_image","twitter_title":"How to Measure Resource Utilization? - Teamdeck.io","twitter_description":"How do you know if you\u2019ve allocated resources at your organization successfully? Here are some ideas to help you measure resource utilization.","twitter_image":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/15175122\/how-to-measure-resource-utilization.png","twitter_creator":"@helloteamdeck","twitter_site":"@helloteamdeck","twitter_misc":{"Written by":"Ania Kitowska","Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/","url":"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/","name":"Resource Utilization - How Project Managers Measure It?","isPartOf":{"@id":"https:\/\/teamdeck.io\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#primaryimage"},"image":{"@id":"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#primaryimage"},"thumbnailUrl":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/17161903\/How-to-Measure-Resource-Utilization-1.jpeg","datePublished":"2024-06-24T07:31:34+00:00","dateModified":"2025-01-23T20:35:33+00:00","author":{"@id":"https:\/\/teamdeck.io\/#\/schema\/person\/38139dc474576295e51cfae1580d697e"},"description":"How do you know if you\u2019ve allocated resources at your organization successfully? Here are some ideas to help you measure resource utilization.","breadcrumb":{"@id":"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#breadcrumb"},"inLanguage":"tr-TR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/"]}]},{"@type":"ImageObject","inLanguage":"tr-TR","@id":"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#primaryimage","url":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/17161903\/How-to-Measure-Resource-Utilization-1.jpeg","contentUrl":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/17161903\/How-to-Measure-Resource-Utilization-1.jpeg","width":1469,"height":981,"caption":"Helping project managers to calculate resource utilization"},{"@type":"BreadcrumbList","@id":"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/teamdeck.io\/"},{"@type":"ListItem","position":2,"name":"How to Calculate Resource Utilization: A Guide for Project Managers"}]},{"@type":"WebSite","@id":"https:\/\/teamdeck.io\/#website","url":"https:\/\/teamdeck.io\/","name":"Teamdeck","description":"resource scheduling + time tracking + leave management","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teamdeck.io\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr-TR"},{"@type":"Person","@id":"https:\/\/teamdeck.io\/#\/schema\/person\/38139dc474576295e51cfae1580d697e","name":"Ania Kitowska","image":{"@type":"ImageObject","inLanguage":"tr-TR","@id":"https:\/\/teamdeck.io\/#\/schema\/person\/image\/","url":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113607\/aniaprofil%C3%B3wka-150x150.jpg","contentUrl":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113607\/aniaprofil%C3%B3wka-150x150.jpg","caption":"Ania Kitowska"}}]}},"_links":{"self":[{"href":"https:\/\/teamdeck.io\/tr\/wp-json\/wp\/v2\/posts\/3892","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teamdeck.io\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teamdeck.io\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teamdeck.io\/tr\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/teamdeck.io\/tr\/wp-json\/wp\/v2\/comments?post=3892"}],"version-history":[{"count":69,"href":"https:\/\/teamdeck.io\/tr\/wp-json\/wp\/v2\/posts\/3892\/revisions"}],"predecessor-version":[{"id":13647,"href":"https:\/\/teamdeck.io\/tr\/wp-json\/wp\/v2\/posts\/3892\/revisions\/13647"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teamdeck.io\/tr\/wp-json\/wp\/v2\/media\/8529"}],"wp:attachment":[{"href":"https:\/\/teamdeck.io\/tr\/wp-json\/wp\/v2\/media?parent=3892"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teamdeck.io\/tr\/wp-json\/wp\/v2\/categories?post=3892"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teamdeck.io\/tr\/wp-json\/wp\/v2\/tags?post=3892"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}