{"id":4601,"date":"2019-01-28T16:05:48","date_gmt":"2019-01-28T14:05:48","guid":{"rendered":"https:\/\/teamdeck.io\/?p=4601"},"modified":"2023-10-15T19:00:08","modified_gmt":"2023-10-15T17:00:08","slug":"project-resource-management-guide","status":"publish","type":"post","link":"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/projektu-resursu-parvaldibas-rokasgramata\/","title":{"rendered":"Projektu resursu p\u0101rvald\u012bba 101: rokasgr\u0101mata projektu vad\u012bt\u0101jiem"},"content":{"rendered":"<div class=\"yoast-breadcrumbs\"><span><span><a href=\"https:\/\/teamdeck.io\/lv\/\">S\u0101kums<\/a><\/span> \" <span class=\"breadcrumb_last\" aria-current=\"page\">Projektu resursu p\u0101rvald\u012bba 101: rokasgr\u0101mata projektu vad\u012bt\u0101jiem<\/span><\/span><\/div>\n\n<p style=\"text-align: justify;\"><strong>Ja j\u016bs jaut\u0101jat sev, kas ir resursu p\u0101rvald\u012bba, j\u016bs atrodaties \u013coti lab\u0101 viet\u0101. Vadot projektu, j\u016bs p\u0101rvald\u0101t ne tikai uzdevumus, kas nepiecie\u0161ami projekta \u012bsteno\u0161anai. Tas, k\u0101 j\u016bs pl\u0101nojat, organiz\u0113jat un vad\u0101t savu komandu, b\u016btiski ietekm\u0113 j\u016bsu projekta pan\u0101kumus. Nav br\u012bnums, ka resursu p\u0101rvald\u012bbas paraugprakses iev\u0113ro\u0161ana var rad\u012bt re\u0101las p\u0101rmai\u0146as darba viet\u0101.\u00a0<\/strong><\/p>\n<p><span style=\"color: #000000;\"><strong>Ko j\u016bs sa\u0146emsiet ar \u0161o rakstu:<\/strong><\/span><\/p>\n<ul>\n<li>K\u0101 <a href=\"https:\/\/teamdeck.io\/lv\/\" target=\"_blank\" rel=\"noopener\">resursu p\u0101rvald\u012bbas programmat\u016bra<\/a> paaugstin\u0101ja projekta resursu p\u0101rvald\u012bbas efektivit\u0101ti.<\/li>\n<li>Resursu p\u0101rvald\u012bbas loma projektu vad\u012bb\u0101<\/li>\n<li>Projektu pl\u0101no\u0161anas metodes<\/li>\n<li>Resursu pl\u0101no\u0161anas at\u0161\u0137ir\u012bbas, <a href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/resursu-pieskirsana-projektu-vaditajiem\/\" target=\"_blank\" rel=\"noopener\">resursu pie\u0161\u0137ir\u0161ana<\/a>, un resursu pl\u0101no\u0161ana<\/li>\n<\/ul>\n<h2 data-pm-slice=\"1 1 []\"><strong>K\u0101p\u0113c ir nepiecie\u0161ama projekta resursu p\u0101rvald\u012bba?<\/strong><\/h2>\n<p><span data-color=\"var(--green-10)\">T\u0101 k\u0101 m\u0113s v\u0113lamies izgaismot projekta resursu p\u0101rvald\u012bbas b\u016bt\u012bbu, mums ir j\u0101ievie\u0161 neliels akad\u0113misk\u0101s sarunas gabali\u0146\u0161, kura m\u0113r\u0137is ir izskaidrot ar m\u016bsu galveno t\u0113mu saist\u012btos terminus.<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">Ta\u010du ir ar\u012b v\u0113l viens iemesls, k\u0101d\u0113\u013c \u0161ie str\u012bdi ir radu\u0161ies. Bez skaidras izpratnes par galvenajiem elementiem un faktoriem, kas veido projekta resursu p\u0101rvald\u012bbu, ikviena l\u0113mumi ir pak\u013cauti liel\u0101kam k\u013c\u016bdas riskam. K\u013c\u016bdas, kas saist\u012btas ar projekta ietvaros notieko\u0161ajiem procesiem vai pat programmat\u016bras izv\u0113li, lai palielin\u0101tu projekta resursu p\u0101rvald\u012bbu.<\/span><\/p>\n<figure style=\"width: 2506px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/18095018\/booking_5_collaboration.jpg\" alt=\"Projekta resursu p\u0101rvald\u012bba\" width=\"2506\" height=\"1328\" \/><figcaption class=\"wp-caption-text\">Projekta resursu p\u0101rvald\u012bbas procesa da\u013ca [Avots: Teamdeck programmat\u016bra]<\/figcaption><\/figure>\n<p><span data-color=\"var(--green-10)\">Ja jums b\u016bs kopaina, j\u016bs neapjuksiet j\u0113dzienu labirint\u0101 un neskaidrajos savienojumos starp zin\u0101\u0161anu jom\u0101m, kas pamat\u0101 atbalsta projektu vad\u012bbu.<\/span><\/p>\n<h3><strong>No projektu, projektu vad\u012bbas l\u012bdz projektu resursu vad\u012bbai<\/strong><\/h3>\n<p>IT projektu vad\u012bba, <a href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/marketinga-projektu-vadibas-programmaturas-riki-padomi-posmi\/\">m\u0101rketinga projektu vad\u012bba<\/a>, projektu vad\u012bba nekustam\u0101 \u012bpa\u0161uma nozar\u0113 vai <a href=\"https:\/\/teamdeck.io\/lv\/instrumentu-kaste\/agenturu-projektu-vadibas-kaudze\/\" target=\"_blank\" rel=\"noopener\">rado\u0161\u0101s a\u0123ent\u016bras projektu vad\u012bba<\/a> - tom\u0113r, vai jebkur\u0101 nozar\u0113, ko j\u016bs ievietojat pirms v\u0101rda \"projektu vad\u012bba\", f\u0101zes, procesi un so\u013ci liel\u0101koties ir vien\u0101di. Ta\u010du, pirms j\u016bs par to uzzin\u0101siet vair\u0101k, ir j\u0101veic neliels ievads.\u00a0<\/p>\n<p><span data-color=\"var(--green-10)\">K\u0101 zin\u0101ms, cilv\u0113ki m\u0101c\u0101s \u0101tr\u0101k, redzot att\u0113lus vai piem\u0113rus - kaut ko var uztvert ar ma\u0146\u0101m, pirmk\u0101rt, ar ac\u012bm. T\u0101p\u0113c - pirms tikt pak\u013cautiem daudzajiem jaut\u0101jumiem, kas saist\u012bti ar katra j\u0113dziena noz\u012bmi turpm\u0101k izkl\u0101st\u012btaj\u0101s defin\u012bcij\u0101s, - s\u0101ksim ar izdomas bag\u0101tiem un viegli piel\u0101gojamiem piem\u0113riem, kas pieder projektu vad\u012bbas saimei.<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">S\u0101kot no maz\u0101k sare\u017e\u0123\u012btiem un maz\u0101k laikietilp\u012bgiem darbiem:<\/span><\/p>\n<ul>\n<li><span data-color=\"var(--green-10)\">4 ned\u0113\u013cu laik\u0101 izveidot labi p\u0101rdodamu t\u012bmek\u013ca vietni ar daudziem interakt\u012bviem elementiem, kas mobilaj\u0101s ier\u012bc\u0113s nepal\u0113nin\u0101s darb\u012bbu;<\/span><\/li>\n<li><span data-color=\"var(--green-10)\">alus uz\u0146\u0113muma pude\u013cu dizaina p\u0101rveido\u0161ana un ra\u017eo\u0161ana pirms vasaras s\u0101kuma - 3 m\u0113ne\u0161u laik\u0101;<\/span><\/li>\n<li><span data-color=\"var(--green-10)\">p\u0101rdo\u0161anas papla\u0161in\u0101\u0161ana jaun\u0101 tirg\u016b, kas ietver biroju nomu, jaunu speci\u0101listu atra\u0161anu, atlasi, pie\u0146em\u0161anu darb\u0101, m\u0101rketinga pl\u0101na sagatavo\u0161anu un t\u0101 \u012bsteno\u0161anu atbilsto\u0161i viet\u0113jam piepras\u012bjumam - 6 m\u0113ne\u0161u laik\u0101;<\/span><\/li>\n<li><span data-color=\"var(--green-10)\">48 m\u0113ne\u0161u laik\u0101 izveidot kaut ko l\u012bdz\u012bgu \u0161im - izveidot pasaul\u0113 liel\u0101ko dambja konstrukciju. \u0160is piem\u0113rs atrodas uz tre\u0161\u0101s liel\u0101k\u0101s upes pasaul\u0113 - \u0136\u012bnas Jandzi upes.\u00a0<\/span><\/li>\n<\/ul>\n<figure style=\"width: 1600px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/cdn.britannica.com\/20\/119620-050-AC901996\/Yichang-Three-Gorges-Dam-Yangtze-River-China.jpg\" alt=\"Projekta veiksm\u012bgai norisei nepiecie\u0161amos projekta resursus nodro\u0161ina pieredz\u0113jis resursu vad\u012bt\u0101js.\" width=\"1600\" height=\"1072\" \/><figcaption class=\"wp-caption-text\">\u0160is 17 gadus ilgais, $59 miljardus v\u0113rtais projekts ir 595 p\u0113das augsts, 131 p\u0113das plats un vair\u0101k nek\u0101 7600 p\u0113du gar\u0161, un taj\u0101 ir 32 galven\u0101s turb\u012bnas, kas ra\u017eo elektroener\u0123iju. Izmaksas? Katra uzdevuma pras\u012bbas? Termi\u0146i? Grafiki? Iesaist\u012bto cilv\u0113ku un prasmju skaits?<\/figcaption><\/figure>\n<p><span data-color=\"var(--green-10)\">Nobeigum\u0101 v\u0113los teikt, ka vienm\u0113r, kad dom\u0101jat \"projekts\", jums ir j\u0101b\u016bt priek\u0161statam par to, cik daudz cilv\u0113ku, prasmju, apak\u0161uz\u0146\u0113m\u0113ju, instrumentu un pas\u0101kumu ietver projekts. Cik daudz resursu, atkar\u012bbu, mazo so\u013cu un miljons uzdevumu un grafiku ir iesaist\u012bti, lai pabeigtu katru projekta ilustr\u0101ciju?<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">Turpinot m\u016bsu t\u0113mu, laiks iedzi\u013cin\u0101ties defin\u012bcij\u0101s. S\u0101ksim ar kaut ko viegl\u0101k pie\u0146emamu. Iedom\u0101simies, ka j\u016bs run\u0101jat ar b\u0113rnu un v\u0113laties vi\u0146am aprakst\u012bt, k\u0101da ir projektu vad\u012bbas noz\u012bme. \u0160\u0101d\u0101 kontekst\u0101 j\u016bs var\u0113tu viegli piekrist defin\u012bcijai no projectmanager.com:<\/span><\/p>\n<blockquote>\n<p>Projektu vad\u012bba ir projektu pl\u0101no\u0161anas, \u012bsteno\u0161anas un pabeig\u0161anas discipl\u012bna.<\/p>\n<\/blockquote>\n<p><span data-color=\"var(--green-10)\">Iepriek\u0161min\u0113taj\u0101 izpratn\u0113 projektu vad\u012bba tiek uzskat\u012bta par procesu un sadal\u012bta tr\u012bs posmos. Protams, katr\u0101 no tiem ir v\u0113l vair\u0101kas elementu grupas, procesi, uzdevumi un - vienm\u0113r nenov\u0113rt\u0113ti, vienm\u0113r neparedzami - ar katru no tiem saist\u012btie izaicin\u0101jumi.<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">Ta\u010du t\u0101 ir \u013coti vienk\u0101r\u0161ota projektu vad\u012bbas dz\u012bves cikla versija, jo t\u0101 \u0161o procesu sauc speci\u0101listi. Vispopul\u0101r\u0101k\u0101 ir versija ar 5 posmiem. PMI izstr\u0101d\u0101t\u0101 f\u0101ze ietver koncepciju un uzs\u0101k\u0161anu, pl\u0101no\u0161anu, izpildi, izpildi\/uzraudz\u012bbu un projekta sl\u0113g\u0161anu.<\/span><\/p>\n<figure id=\"attachment_10516\" aria-describedby=\"caption-attachment-10516\" style=\"width: 1424px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-10516 size-full\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/09170227\/5bd9fbb8792c1491dfc88cc4_5-Project-Management-Phases.png\" alt=\"Projekta resursu p\u0101rvald\u012bba ir vienk\u0101r\u0161i saist\u012bta ar projekta komandas poz\u012bcij\u0101m. \" width=\"1424\" height=\"687\" srcset=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/09170227\/5bd9fbb8792c1491dfc88cc4_5-Project-Management-Phases.png 1424w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/09170227\/5bd9fbb8792c1491dfc88cc4_5-Project-Management-Phases-300x145.png 300w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/09170227\/5bd9fbb8792c1491dfc88cc4_5-Project-Management-Phases-1280x618.png 1280w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/09170227\/5bd9fbb8792c1491dfc88cc4_5-Project-Management-Phases-768x371.png 768w\" sizes=\"auto, (max-width: 1424px) 100vw, 1424px\" \/><figcaption id=\"caption-attachment-10516\" class=\"wp-caption-text\">Projektu vad\u012bbas procesa 5 f\u0101zes (projektu vad\u012bbas dz\u012bves cikls). \u0145emot \u0161o vizualiz\u0101ciju acu priek\u0161\u0101, j\u016bs varat iedom\u0101ties jomas, kur\u0101s projektu resursu p\u0101rvald\u012bbas sist\u0113ma var pal\u012bdz\u0113t.<\/figcaption><\/figure>\n<p><span data-color=\"var(--green-10)\">Ta\u010du \u0161\u012b defin\u012bcija nerisina jaut\u0101jumu par to, kas. Konkr\u0113t\u0101k sakot - cilv\u0113ks, speci\u0101lists un vi\u0146a kompetences, pieredze vai briedums.<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">Saska\u0146\u0101 ar to pa\u0161u PMI, ko m\u0113s \u0161eit bie\u017ei pieminam, vi\u0146i pied\u0101v\u0101ja defin\u012bciju, kas uzsver kaut ko, kas ir katra projekta pamat\u0101. Runa ir par cilv\u0113kiem, s\u0101kot no projektu vad\u012bt\u0101jiem un beidzot ar projekta izpild\u012bt\u0101jiem un projekt\u0101 iesaist\u012bto darbasp\u0113ku. Cilv\u0113ki, kuri pl\u0101no, bet ar\u012b tie, kuri ir izv\u0113l\u0113ti piedal\u012bties k\u0101d\u0101 no projekta posmiem un kuriem tiek uztic\u0113ti uzdevumi.<\/span><\/p>\n<p>P\u0101rfr\u0101z\u0113jot vi\u0146u v\u0101rdus, projektu vad\u012bba noz\u012bm\u0113 izmantot <span style=\"font-size: revert; color: initial; font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Roboto, Oxygen-Sans, Ubuntu, Cantarell, 'Helvetica Neue', sans-serif;\">\u012bpa\u0161as zin\u0101\u0161anas, talantus, prasmes, ier\u012bces, r\u012bkus, metodes, procesus un pa\u0146\u0113mienus, lai sniegtu cilv\u0113kiem \"v\u0113rt\u012bbu\".<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">K\u0101 redzam, \u0161eit vair\u0101k runa ir par kompetenc\u0113m (ar\u012b par \"maigaj\u0101m\" kompetenc\u0113m), par inform\u0101cijas esam\u012bbu un sp\u0113ju \u0161\u012bs zin\u0101\u0161anas \u012bstenot. Vai ar\u012b - izmantojot fr\u0101zi, kas \u0146emta, teiksim, no motiv\u0101cijas bibliot\u0113kas - p\u0101rv\u0113rst dom\u0101\u0161anu darb\u012bb\u0101 un paveikt lietas.<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">\u0160\u012bs noda\u013cas kopsavilkum\u0101 m\u0113s izmantojam Projektu vad\u012bbas instit\u016bta asoci\u0101cijas priek\u0161likumu. Tas nav pats nes\u0101p\u012bg\u0101kais, lai atcer\u0113tos vai pat saprastu projektu vad\u012bbas defin\u012bciju, ta\u010du, izlasot iepriek\u0161 min\u0113to, var viegli iedom\u0101ties, ko autors ir dom\u0101jis. Ta\u010du \u0161eit ir kaut kas t\u0101ds, kam m\u0113s nepiekr\u012btam. Tom\u0113r:<\/span><\/p>\n<blockquote>\n<p>Projektu vad\u012bba ir procesu, meto\u017eu, prasmju, zin\u0101\u0161anu un pieredzes pielieto\u0161ana, lai sasniegtu konkr\u0113tus projekta m\u0113r\u0137us saska\u0146\u0101 ar projekta pie\u0146em\u0161anas krit\u0113rijiem, iev\u0113rojot saska\u0146otos parametrus. Projekta vad\u012bbai ir gal\u012bgie rezult\u0101ti, kas ir ierobe\u017eoti ar noteiktu laika grafiku un bud\u017eetu.<\/p>\n<\/blockquote>\n<p><span data-color=\"var(--green-10)\">Da\u017ei koment\u0101ri. M\u0113s redzam da\u017eas l\u012bdz\u012bbas ar iepriek\u0161 ierosin\u0101tajiem priek\u0161likumiem, t\u0101p\u0113c par to vair\u0101k nav ko teikt. Jaunums ir ierobe\u017eotais laiks un bud\u017eets, k\u0101 ar\u012b pie\u0146em\u0161anas krit\u0113riji. S\u0101kot ar p\u0113d\u0113jo, j\u016bsu klientam parasti ir zin\u0101mas gaidas par to, ko vi\u0146\u0161 v\u0113las redz\u0113t fini\u0161\u0101, k\u0101 tam b\u016btu j\u0101darbojas un k\u0101 tam b\u016btu j\u0101pal\u012bdz risin\u0101t vi\u0146a probl\u0113mas. Vi\u0146\u0161 nevar pie\u0146emt j\u016bsu darba rezult\u0101tu. Un kas tad?<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">Ta\u010du ir gr\u016bti non\u0101kt pretrun\u0101 - pie\u0146em\u0161anas krit\u0113riji var padar\u012bt projektu ilg\u0101ku, nek\u0101 pie\u0146emts. Ta\u010du m\u0113s nevaram piekrist apgalvojumam, ka bud\u017eets un laiks ir tie nosac\u012bjumi, kas projekta vad\u012bbu kvalific\u0113 k\u0101 projekta vad\u012bbu.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-10483\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2022\/05\/09115329\/timesheets_2_multiple.jpg\" alt=\"\" width=\"1620\" height=\"877\" \/><\/p>\n<p>Ierobe\u017eots laika grafiks un bud\u017eets ir tas, kas atdala projekta vad\u012bbu no vienk\u0101r\u0161as vad\u012bbas [Ekr\u0101ns iepriek\u0161 = vair\u0101ku uzdevumu laika uzskaites p\u0101rskats, izmantojot projekta resursu vad\u012bbas sist\u0113mu].<\/p>\n<p><span data-color=\"var(--green-10)\">Ikviens zina, ka p\u0113d\u0113jie divi aspekti, kas j\u0101\u0146em v\u0113r\u0101 jebkuram priek\u0161s\u0113d\u0113t\u0101jam, priek\u0161niekam vai l\u0113mumu pie\u0146\u0113m\u0113jam, kur\u0161 \u012bsteno jebkuru projektu, ir iepriek\u0161 min\u0113tais laiks un bud\u017eets - jo tie nav neierobe\u017eoti. Bet tikai invest\u012bciju atdevei, paredzamajai atdevei paredzamaj\u0101 laik\u0101 ir visliel\u0101k\u0101 ietekme uz biznesa l\u0113mumiem nek\u0101 jebkuram citam faktoram. Un no daudzu uz\u0146\u0113mumu viedok\u013ca raugoties, uz\u0146\u0113m\u0113jdarb\u012bbas pamatda\u013ca ir nauda. Jo, ja jums ir pietiekami daudz naudas, jums nav j\u0101pie\u0146em sasteigti l\u0113mumi un j\u0101gaida, ko dar\u012bs konkurenti, c\u012bnoties par n\u0101kamajiem klientiem.<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">Ja m\u0113s piekr\u012btam p\u0113d\u0113jam apgalvojumam, m\u0113s nevaram piekrist apgalvojumam, ka projektu vad\u012bba ir kaut kas cits nek\u0101 \"p\u0101rvald\u012bba\", nor\u0101dot, ka galvenais faktors, kas at\u0161\u0137ir abus, ir tas, ka projektu vad\u012bbai ir gal\u012bgais rezult\u0101ts un ierobe\u017eots laika periods, at\u0161\u0137ir\u012bb\u0101 no p\u0101rvald\u012bbas, kas ir nep\u0101rtraukts process.<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">M\u0113s neesam p\u0101rliecin\u0101ti, vai tas darbojas tikai \u0161\u0101d\u0101 veid\u0101. Vai biznesa m\u0113r\u0137is ir daudz klientu, \u012bpa\u0161i daudz klientu, kas \u013cauj biznesam darboties? Vai uz\u0146\u0113mumam ir nepiecie\u0161ama past\u0101v\u012bga sazi\u0146a ar potenci\u0101lajiem klientiem? Vai m\u0101rketinga noda\u013ca vajadz\u012bgaj\u0101 laik\u0101 \u012bsteno maz\u0101kus uzdevumus vai liel\u0101kus projektus, lai uzlabotu komunik\u0101ciju, t\u012bmek\u013ca vietnes apmekl\u0113t\u0101ju skaitu un piesaist\u012bto klientu skaitu? Vai par m\u0101rketingu un komunik\u0101ciju atbild\u012bgajiem cilv\u0113kiem nav reizi m\u0113nes\u012b vai da\u017eas reizes gad\u0101 j\u0101inform\u0113 par rezult\u0101tiem?\u00a0<\/span><\/p>\n<h3 data-pm-slice=\"1 1 []\"><strong>Atbilde uz jaut\u0101jumu <em>K\u0101p\u0113c projekta resursu p\u0101rvald\u012bba<\/em><\/strong><\/h3>\n<p>Vai j\u016bs tagad saprotat, cik svar\u012bga ir projektu resursu p\u0101rvald\u012bba?<\/p>\n<figure style=\"width: 1384px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/images.surferseo.art\/2068d9f3-8586-4dc5-828f-47f4d7501878.png\" alt=\"\" width=\"1384\" height=\"1034\" \/><figcaption class=\"wp-caption-text\">Vai j\u016bs saprotat, cik svar\u012bga ir projekta resursu p\u0101rvald\u012bba? [Avots: \"The State of Project Management\" gada p\u0101rskats, Wellington 2020].<\/figcaption><\/figure>\n<h3><strong>K\u0101da ir projekta resursu p\u0101rvald\u012bbas loma?<\/strong><\/h3>\n<p><span data-color=\"var(--green-10)\">J\u016bs jau daudz ko zin\u0101t par projektu vad\u012bbu, t\u0101p\u0113c jums nav j\u0101inform\u0113 vair\u0101k. M\u0113s ar\u012b jau zin\u0101m, kur <\/span><strong><span data-color=\"var(--green-10)\">vienm\u0113r<\/span><\/strong><span data-color=\"var(--green-10)\"> lai starp 5 projektu vad\u012bbas dz\u012bves cikla posmiem atrastu vietu projekta resursu p\u0101rvald\u012bbai.<\/span><\/p>\n<ul>\n<li>Inici\u0101cijas un koncepcijas f\u0101ze<\/li>\n<li>Pl\u0101no\u0161ana - vienm\u0113r \u0161eit<\/li>\n<li>Uzs\u0101k\u0161ana un izpilde - vienm\u0113r \u0161eit<\/li>\n<li>Uzraudz\u012bba un kontrole - vienm\u0113r \u0161eit<\/li>\n<li>Projekta sl\u0113g\u0161ana<\/li>\n<\/ul>\n<p>Tas ir m\u016bsu izmekl\u0113\u0161anas spo\u017e\u0101kajai zvaigznei - projektu resursu p\u0101rvald\u012bbai. M\u0113s jau zin\u0101m, ko noz\u012bm\u0113 projekts. <span data-color=\"var(--green-10)\">T\u0101tad, k\u0101di ir resursi?<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">Pateicoties <\/span><em><span data-color=\"var(--green-10)\">APM zin\u0101\u0161anu kopums<\/span><\/em><span data-color=\"var(--green-10)\">, m\u0113s zin\u0101m, ka resursi tiek saprasti pla\u0161i - ne tikai k\u0101 cilv\u0113ki (un vi\u0146u prasmes), bet ar\u012b k\u0101 nauda, tehnika, materi\u0101li, tehnolo\u0123ijas un viss p\u0101r\u0113jais, kas nepiecie\u0161ams, lai sasniegtu gaid\u012bto rezult\u0101tu. Var ar\u012b teikt, ka resurss ir viss, kas nepiecie\u0161ams uzdevuma vai projekta izpildei.<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">Protams, no daudzu uz\u0146\u0113mumu, jo \u012bpa\u0161i uz pakalpojumiem orient\u0113tu uz\u0146\u0113mumu, viedok\u013ca resursu p\u0101rvald\u012bba ir saist\u012bta ar cilv\u0113kiem. Cilv\u0113ki un vi\u0146u prasmes.<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">Vi\u0146iem projekta resursu p\u0101rvald\u012bba ir:<\/span><\/p>\n<blockquote>\n<p><span data-color=\"var(--green-10)\">(...) projektam nepiecie\u0161amo resursu, piem\u0113ram, indiv\u012bdu un vi\u0146u prasmju, finan\u0161u, tehnolo\u0123iju, materi\u0101lu, iek\u0101rtu un dabas resursu, ieg\u016b\u0161ana, sadale un p\u0101rvald\u012bba. Resursu p\u0101rvald\u012bba nodro\u0161ina, ka iek\u0161\u0113jie un \u0101r\u0113jie resursi tiek izmantoti efekt\u012bvi, savlaic\u012bgi un atbilsto\u0161i bud\u017eetam.<\/span><\/p>\n<\/blockquote>\n<p>T\u0101 nav visvienk\u0101r\u0161\u0101k\u0101 defin\u012bcija, k\u0101da jebkad ir rad\u012bta, jo taj\u0101 ir daudznoz\u012bm\u012bgi termini, t\u0101p\u0113c t\u0101 var\u0113tu b\u016bt diezgan labi piem\u0113rota akad\u0113miskai disert\u0101cijai. Bet ne \u0161aj\u0101 blog\u0101. Projectmanager.com m\u0113s uzzin\u0101sim vienk\u0101r\u0161\u0101 veid\u0101. Nerun\u0101jot par kvalit\u0101ti, pras\u012bb\u0101m un gaid\u0101m, kas n\u0101k no ieinteres\u0113taj\u0101m pus\u0113m, vai pat laiku un bud\u017eetu.<\/p>\n<blockquote>\n<p><span data-color=\"var(--green-10)\">Resursu p\u0101rvald\u012bba ir resursu pl\u0101no\u0161anas, grafiku sast\u0101d\u012b\u0161anas un pie\u0161\u0137ir\u0161anas process, lai pabeigtu projektu.<\/span><\/p>\n<\/blockquote>\n<figure style=\"width: 1916px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/15174243\/Zrzut-ekranu-2022-04-15-o-13.10.10-1.png\" alt=\"\" width=\"1916\" height=\"1142\" \/><figcaption class=\"wp-caption-text\">Komandas izmanto\u0161anas p\u0101rskata p\u0101rskats - piem\u0113rs cilv\u0113ku darba m\u0113r\u012b\u0161anai [avots: Teamdeck - projektu resursu p\u0101rvald\u012bbas programmat\u016bra].<\/figcaption><\/figure>\n<p><span data-color=\"var(--green-10)\"><strong>Labas resursu p\u0101rvald\u012bbas rezult\u0101t\u0101 pareizie resursi ir pieejami pareizaj\u0101 laik\u0101 pareizajam darbam.<\/strong> <\/span><span data-color=\"var(--green-10)\">Resursu p\u0101rvaldnieka uzdevums ir - p\u0101rfr\u0101z\u0113jot APM v\u0101rdus -. <\/span>noteikt nepiecie\u0161amos resursus (darbiniekus ar atbilsto\u0161\u0101m prasm\u0113m un pieredzi). <span data-color=\"var(--green-10)\">lai veiktu darbu, k\u0101 da\u013cu no pl\u0101no\u0161anas, un noteikt, kad resursi b\u016bs nepiecie\u0161ami, izmantojot pl\u0101no\u0161anu.<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">K\u0101 redzam, kopum\u0101 defin\u012bcijas - iz\u0146emot to pasnieg\u0161anas veidu - ir l\u012bdz\u012bgas. Ja m\u0113s m\u0113\u0123in\u0101sim sal\u012bdzin\u0101t projektu resursu p\u0101rvald\u012bbas defin\u012bcijas, m\u0113s uzzin\u0101sim vair\u0101k, redzot, kas t\u0101m vis\u0101m kop\u0101 ir kop\u012bgs. Nu:<\/span><\/p>\n<ul>\n<li><span data-color=\"var(--green-10)\">iepriek\u0161\u0113ja pl\u0101no\u0161ana\/pl\u0101no\u0161ana<\/span><\/li>\n<li><span data-color=\"var(--green-10)\">pie\u0161\u0137ir\u0161ana\/pl\u0101no\u0161ana\/saska\u0146o\u0161ana\/atbilst\u012bba.<\/span><\/li>\n<li><span data-color=\"var(--green-10)\">uzraudz\u012bba\/m\u0113r\u012bjumi<\/span><\/li>\n<li><span data-color=\"var(--green-10)\">optimiz\u0101cija<\/span><\/li>\n<\/ul>\n<p><span style=\"color: #000000;\" data-color=\"var(--green-10)\">Apkopojot l\u012bdz\u0161in\u0113jo diskusiju, var secin\u0101t, ka projekta resursu p\u0101rvald\u012bba neap\u0161aub\u0101mi ir vispras\u012bg\u0101kais un sare\u017e\u0123\u012bt\u0101kais projekta p\u0101rvald\u012bbas procesa elements. T\u0101s loma - visp\u0101r\u012bgi run\u0101jot - ir pl\u0101not, organiz\u0113t, kontrol\u0113t un nov\u0113rt\u0113t cilv\u0113ku darbu.\u00a0<\/span><\/p>\n<p><span style=\"color: #000000;\">Projekta resursu p\u0101rvald\u012bba ir, vienk\u0101r\u0161\u0101k sakot, p\u0113c iesp\u0113jas efekt\u012bv\u0101k izmantot j\u016bsu r\u012bc\u012bb\u0101 eso\u0161os ierobe\u017eotos resursus. Vai ar\u012b - lai to pateiktu t\u0101, k\u0101 tas notiek paties\u012bb\u0101 - izmantot maksim\u0101li pieejamos resursus, kas iepriek\u0161 apzin\u0101ti un p\u0101rbaud\u012bti attiec\u012bb\u0101 uz atbilsto\u0161\u0101m prasm\u0113m, lai pabeigtu projektu paredzamaj\u0101 laik\u0101 un ar paredzamo rezult\u0101tu.<\/span><\/p>\n<h3><strong><span data-color=\"var(--green-10)\">Starp resursu pl\u0101no\u0161anu, resursu pie\u0161\u0137ir\u0161anu un projekta resursu p\u0101rvald\u012bbu.<\/span><\/strong><\/h3>\n<p><span data-color=\"var(--green-10)\">Lai izvair\u012btos no p\u0101r\u0101k gara ievada, jums ir j\u0101apzin\u0101s, ka 3 iepriek\u0161 min\u0113tie termini da\u017eiem projektu vad\u012bt\u0101jiem un akad\u0113misko aprindu p\u0101rst\u0101vjiem ir saprotami k\u0101 atsevi\u0161\u0137i j\u0113dzieni, un katram no tiem ir sava noz\u012bme.<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">Ta\u010du da\u017eiem cilv\u0113kiem resursu pl\u0101no\u0161ana un resursu pie\u0161\u0137ir\u0161ana noz\u012bm\u0113 vienu un to pa\u0161u, un abi ir da\u013ca no kaut k\u0101 liel\u0101ka - resursu p\u0101rvald\u012bbas. Ta\u010du daudzos avotos par m\u016bsu tematu var atrast ar\u012b defin\u012bcijas, kas iesaka piel\u012bdzin\u0101t \"resursu p\u0101rvald\u012bbu\" un \"resursu pl\u0101no\u0161anu\" (apl\u016bkojiet Wikipedia defin\u012bciju). T\u0101tad ir pien\u0101cis laiks sniegt da\u017eus paskaidrojumus.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-medium\" src=\"https:\/\/media.giphy.com\/media\/3o6MbnqpZBwWdWg3gk\/giphy.gif\" alt=\"Pl\u0101not resursu p\u0101rvald\u012bbu, kas ietver resursu jaudu un resursu piepras\u012bjumus.\" width=\"480\" height=\"366\" \/><\/p>\n<p><span data-color=\"var(--green-10)\">M\u0113s esam vienispr\u0101tis ar uz\u0146\u0113mumu Saviom - m\u016bsu konkurentu projektu resursu p\u0101rvald\u012bbas sist\u0113mu tirg\u016b -, ka:\u00a0\u00a0<\/span><\/p>\n<blockquote>\n<p><em><span data-color=\"var(--green-10)\">Resursu pie\u0161\u0137ir\u0161ana, kas paz\u012bstama ar\u012b k\u0101 resursu pl\u0101no\u0161ana, \u013cauj noteikt un pie\u0161\u0137irt resursus da\u017e\u0101d\u0101m darb\u012bb\u0101m konkr\u0113tam laikposmam.<\/span><\/em><\/p>\n<\/blockquote>\n<p><span data-color=\"var(--green-10)\">Acumirkl\u012b var redz\u0113t, ka \u0161o defin\u012bciju var uzskat\u012bt ar\u012b par resursu p\u0101rvald\u012bbas defin\u012bciju. Vai ne? Tom\u0113r \u0161aj\u0101 rakst\u0101 m\u0113s cent\u012bsimies saglab\u0101t k\u0101rt\u012bbu, saska\u0146\u0101 ar kuru projekta resursu p\u0101rvald\u012bba un viss t\u0101s process ietver pl\u0101no\u0161anu un pie\u0161\u0137ir\u0161anu k\u0101 t\u0101s da\u013cas.<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">M\u0113s var\u0113tu turpin\u0101t \u0161o diskusiju par nian\u0161u defin\u0113\u0161anu, ta\u010du tas nav m\u0113r\u0137is. \u0160\u012bs noda\u013cas m\u0113r\u0137is ir sniegt jums pla\u0161\u0101ku priek\u0161statu par terminolo\u0123ijas apsv\u0113rumiem un probl\u0113m\u0101m, kas saist\u012btas ar interes\u0113jo\u0161o terminu.<\/span><\/p>\n<p>\u00a0<\/p>\n<h2 style=\"text-align: justify;\"><strong>KPI, izaicin\u0101jumi un programmat\u016bras noder\u012bga loma projektu resursu p\u0101rvald\u012bb\u0101<\/strong><\/h2>\n<h3><strong>Projekta resursu p\u0101rvald\u012bbas KPI\u00a0<\/strong><\/h3>\n<p style=\"text-align: justify;\">A. Apr\u0113\u0137in\u0101t\u0101s un darbinieka faktiski nostr\u0101d\u0101t\u0101s stundas<\/p>\n<p>Vai projekts norit saska\u0146\u0101 ar pl\u0101nu - tas ir past\u0101v\u012bgs jaut\u0101jums katra projekta vad\u012bt\u0101ja galv\u0101. Progresu var p\u0101rbaud\u012bt, sal\u012bdzinot pie\u0146emto apl\u0113sto v\u0113rt\u012bbu (piem\u0113ram, stundas, kas darbiniekam j\u0101pat\u0113r\u0113 uzdevuma veik\u0161anai) ar faktiskaj\u0101m izsekotaj\u0101m stund\u0101m. Pateicoties \u0161ai metodei, j\u016bs var\u0113siet paman\u012bt agr\u012bnas projekta kav\u0113\u0161an\u0101s paz\u012bmes un veikt da\u017eas izmai\u0146as pa\u0161reiz\u0113j\u0101 projekta laik\u0101 vai n\u0101kotn\u0113.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-10663 size-full\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23081930\/Zrzut-ekranu-2022-05-12-o-14.57.12-1.png\" alt=\"Resursu p\u0101rvald\u012bbas r\u0101d\u012bt\u0101ji\" width=\"1328\" height=\"934\" srcset=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23081930\/Zrzut-ekranu-2022-05-12-o-14.57.12-1.png 1328w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23081930\/Zrzut-ekranu-2022-05-12-o-14.57.12-1-300x211.png 300w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23081930\/Zrzut-ekranu-2022-05-12-o-14.57.12-1-1280x900.png 1280w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23081930\/Zrzut-ekranu-2022-05-12-o-14.57.12-1-768x540.png 768w\" sizes=\"auto, (max-width: 1328px) 100vw, 1328px\" \/><\/p>\n<p style=\"text-align: justify;\">\u00a0<\/p>\n<p style=\"text-align: justify;\">\u00a0<\/p>\n<p style=\"text-align: justify;\">B. Apr\u0113\u0137in\u0101t\u0101s un faktisk\u0101s izmaksas uz vienu komandas locekli (resursu izmaksu starp\u012bba)<\/p>\n<p style=\"text-align: justify;\">Izmaksas, ko rada komandas darbs, ir v\u0113l viens faktors, kas liek projektu vad\u012bt\u0101jiem intens\u012bvi dom\u0101t. Labas projektu resursu p\u0101rvald\u012bbas sist\u0113mas \u013cauj noteikt stundas vai pat dienas likmes katram komandas loceklim un sast\u0101d\u012bt komandas sast\u0101vu. <a href=\"https:\/\/teamdeck.io\/lv\/instrumentu-kaste\/projekta-izmaksu-izsekosana\/\">projekta izmaksu izseko\u0161ana<\/a> zi\u0146ojumus, pamatojoties uz tiem un j\u016bsu komandas darba laika uzskaites lap\u0101m.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-10664\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23082105\/Zrzut-ekranu-2022-05-12-o-14.58.22-1.png\" alt=\"\" width=\"1642\" height=\"884\" srcset=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23082105\/Zrzut-ekranu-2022-05-12-o-14.58.22-1.png 1642w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23082105\/Zrzut-ekranu-2022-05-12-o-14.58.22-1-300x162.png 300w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23082105\/Zrzut-ekranu-2022-05-12-o-14.58.22-1-1280x689.png 1280w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23082105\/Zrzut-ekranu-2022-05-12-o-14.58.22-1-768x413.png 768w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23082105\/Zrzut-ekranu-2022-05-12-o-14.58.22-1-1536x827.png 1536w\" sizes=\"auto, (max-width: 1642px) 100vw, 1642px\" \/><\/p>\n<p style=\"text-align: justify;\">\u00a0<\/p>\n<p style=\"text-align: justify;\">C. Nor\u0113\u0137in\u0101mi un nenor\u0113\u0137in\u0101mi stundu skaits<\/p>\n<p style=\"text-align: justify;\">Sadal\u012bjums starp neapmaks\u0101jam\u0101m un apmaks\u0101jam\u0101m stund\u0101m projektos pal\u012bdz izsekot uz\u0146\u0113muma rentabilit\u0101tei. P\u0101rbaudiet, cik stundas j\u016bsu komandas locek\u013ci pavada t\u0101d\u0101s darb\u012bb\u0101s k\u0101 san\u0101ksmes, administrat\u012bvie uzdevumi u. c.<\/p>\n<p style=\"text-align: justify;\">D. Resursu izmanto\u0161ana \/ Darbinieku izmanto\u0161ana<\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Resursu izmanto\u0161ana ir viens no svar\u012bg\u0101kajiem uz\u0146\u0113mumu darb\u012bbas KPI. Galu gal\u0101, j\u016bs ta\u010du nev\u0113laties, lai j\u016bsu komanda b\u016btu p\u0101rpild\u012bta vai p\u0101rslogota. Un - cit\u0101di - nevienam nevajadz\u0113tu palikt bez uzdevumiem. Ir <\/span><span style=\"font-weight: 400;\">2 veidi, k\u0101 apr\u0113\u0137in\u0101t <a href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/ka-izmerit-resursu-izmantosanu\/\">resursu izmanto\u0161ana<\/a><\/span><span style=\"font-weight: 400;\">, un jums t\u0101s j\u0101izmanto divos da\u017e\u0101dos projekta dz\u012bves cikla posmos.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-10665\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23082225\/Zrzut-ekranu-2022-05-12-o-15.00.28-1.png\" alt=\"\" width=\"1676\" height=\"1074\" srcset=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23082225\/Zrzut-ekranu-2022-05-12-o-15.00.28-1.png 1676w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23082225\/Zrzut-ekranu-2022-05-12-o-15.00.28-1-300x192.png 300w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23082225\/Zrzut-ekranu-2022-05-12-o-15.00.28-1-1280x820.png 1280w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23082225\/Zrzut-ekranu-2022-05-12-o-15.00.28-1-768x492.png 768w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23082225\/Zrzut-ekranu-2022-05-12-o-15.00.28-1-1536x984.png 1536w\" sizes=\"auto, (max-width: 1676px) 100vw, 1676px\" \/><\/p>\n<p>\u00a0<\/p>\n<h3 data-pm-slice=\"1 3 []\"><strong>Probl\u0113mas, kas rodas projekta resursu p\u0101rvald\u012bbas procesos<\/strong><\/h3>\n<p>A. Resursu kompetences un resursu kopuma vienk\u0101r\u0161as pieejam\u012bbas tr\u016bkums<\/p>\n<p>Jo liel\u0101ks projektu skaits, jo liel\u0101ks iesaist\u012bto darbinieku skaits. Jo liel\u0101ks darbinieku skaits, jo gr\u016bt\u0101k ir \u0101tri atrast piem\u0113rotus darbiniekus, kurus var\u0113tu piesaist\u012bt projektam. Pietiekamas projektu resursu pl\u0101no\u0161anas sist\u0113mas uzdevums ir pal\u012bdz\u0113t atrast resursus ar paredzamaj\u0101m prasm\u0113m, briedumu, pieredzi, kompetenc\u0113m, atra\u0161an\u0101s vietu, izmaksu profilu, laika zonu utt.\u00a0<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-11147\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/15141847\/Zrzut-ekranu-2022-04-12-o-13.00.02-1.png\" alt=\"\" width=\"2396\" height=\"1166\" srcset=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/15141847\/Zrzut-ekranu-2022-04-12-o-13.00.02-1.png 2396w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/15141847\/Zrzut-ekranu-2022-04-12-o-13.00.02-1-300x146.png 300w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/15141847\/Zrzut-ekranu-2022-04-12-o-13.00.02-1-1280x623.png 1280w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/15141847\/Zrzut-ekranu-2022-04-12-o-13.00.02-1-768x374.png 768w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/15141847\/Zrzut-ekranu-2022-04-12-o-13.00.02-1-1536x747.png 1536w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/15141847\/Zrzut-ekranu-2022-04-12-o-13.00.02-1-2048x997.png 2048w\" sizes=\"auto, (max-width: 2396px) 100vw, 2396px\" \/><\/p>\n<p>\u00a0<\/p>\n<p>B. Tr\u016bksto\u0161o resursu darb\u012bbas p\u0101rskats<\/p>\n<p>Produktivit\u0101tes m\u0113r\u012b\u0161ana joproj\u0101m ir galvenais izaicin\u0101jums uz\u0146\u0113mumos - gan jaunajos, gan ar sen\u0101m trad\u012bcij\u0101m. Darba laika anal\u012bze - gan produkt\u012bv\u0101, gan neprodukt\u012bv\u0101, darbinieku laika uzskaite, kas pavad\u012bts konkr\u0113tu uzdevumu veik\u0161anai, ir veids, kas pal\u012bdz optimiz\u0113t darbu un prognoz\u0113t laiku un bud\u017eetu.\u00a0<\/p>\n<p>\u00a0<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-11148\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/17152225\/timesheets_9_analyze.jpg\" alt=\"\" width=\"1914\" height=\"1490\" \/><\/p>\n<p>\u00a0<\/p>\n<p>C. Pl\u0101no\u0161anas konflikti<\/p>\n<p><a href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/projektu-grafiku-konflikts\/\" target=\"_blank\" rel=\"noopener\">Pl\u0101no\u0161anas konflikti<\/a> nav nekas rets pat \u013coti labi organiz\u0113t\u0101 uz\u0146\u0113mum\u0101. \u012apa\u0161i programmat\u016bras namos, rekl\u0101mas a\u0123ent\u016br\u0101s un citos uz pakalpojumiem orient\u0113tos uz\u0146\u0113mumos, kur str\u0101d\u0101 pat tikai da\u017ei projektu vad\u012bt\u0101ji, tiek mekl\u0113ti atbilsto\u0161i resursi. Projektu resursu p\u0101rvald\u012bbas sist\u0113ma br\u012bdina par rezerv\u0101ciju p\u0101rkl\u0101\u0161anos un - no darbinieka viedok\u013ca raugoties - par p\u0101r\u0101k lielu rezerv\u0113\u0161anu.<\/p>\n<p><strong style=\"font-size: revert; color: initial; font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Roboto, Oxygen-Sans, Ubuntu, Cantarell, 'Helvetica Neue', sans-serif;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-11149\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/17152225\/booking_4_resolve_conflicts.jpg\" alt=\"\" width=\"1130\" height=\"590\" \/><\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p>D. Neatbilsto\u0161a resursu jaudas pl\u0101no\u0161ana<br \/>Pl\u0101nojot resursu jaudu, var izvair\u012bties no aizkav\u0113\u0161an\u0101s p\u0113d\u0113j\u0101 br\u012bd\u012b. Jauda nosaka resursus, kas pieejami konkr\u0113ta uzdevuma veik\u0161anai.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-11150 size-full\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/17152225\/booking_2_workload_capacity-1.jpg\" alt=\"Projekta vad\u012bbas r\u012bks ir nepiecie\u0161ams, lai efekt\u012bvi p\u0101rvald\u012btu projekta uzdevumus un projekta darbu.\" width=\"1220\" height=\"565\" \/>Ja esat \u012bstenojis projektu laik\u0101 un bud\u017eeta ietvaros, j\u016bs esat uz pareiz\u0101 ce\u013ca. Daudzas organiz\u0101cijas s\u0101kotn\u0113j\u0101 projekta f\u0101z\u0113 nenoteic resursu kapacit\u0101ti, t\u0101p\u0113c ir gr\u016bti pl\u0101not resursu sadal\u012bjumu.<\/p>\n<p>Resursu jaudu var analiz\u0113t, izmantojot resursu izseko\u0161anu. Pateicoties da\u017eiem univers\u0101liem resursu p\u0101rvald\u012bbas r\u012bkiem ar projektu vad\u012bbas r\u012bkiem, kas var atvieglot \u0161o uzdevumu.<\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Atkar\u012bb\u0101 no j\u016bsu komandas lieluma, uz\u0146\u0113muma profila un projektu vad\u012bbas metodolo\u0123ijas, varat izv\u0113l\u0113ties no da\u017e\u0101diem resursu p\u0101rvald\u012bbas r\u012bkiem. Paties\u012bb\u0101 s\u0101kum\u0101 j\u016bs varat izmantot pat vienk\u0101r\u0161u izkl\u0101jlapu (lai gan es jums ieteiktu r\u012bkoties cit\u0101di, jo izkl\u0101jlapas var k\u013c\u016bt neefekt\u012bvas, kad j\u016bsu uz\u0146\u0113mums papla\u0161in\u0101s).<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Apkopojot \u0161o noda\u013cu, ide\u0101l\u0101 variant\u0101, pareiza <\/span><a href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/labakie-resursu-parvaldibas-riki\/\"><span style=\"font-weight: 400;\">resursu p\u0101rvald\u012bbas r\u012bks<\/span><\/a><span style=\"font-weight: 400;\"> j\u0101ietver grafiks (piem\u0113ram, vienk\u0101r\u0161a grafika form\u0101), kur\u0101 j\u0101iek\u013cauj <a href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/resursu-kalendars\/\">resursu kalend\u0101rs <\/a>skats), j\u016bsu resursu pieejam\u012bbu, to pa\u0161reiz\u0113j\u0101s rezerv\u0101cijas un darba laika uzskaites.<\/span><\/p>\n<p style=\"text-align: justify;\">Noder\u012bgas ir ar\u012b piel\u0101gotas kategorijas vai tagi, jo tie \u013cauj viegl\u0101k p\u0101rvietoties uz resursiem, kas jums pa\u0161laik ir nepiecie\u0161ami, filtr\u0113t skat\u012bjumu p\u0113c konkr\u0113t\u0101m lom\u0101m vai projektiem u. c.<\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Visbeidzot, iesp\u0113jams, v\u0113l\u0113sieties izv\u0113l\u0113ties r\u012bku ar integr\u0113tu p\u0101rskatu sada\u013cu, kur\u0101 var viegli izmantot sav\u0101ktos datus, lai analiz\u0113tu. <a href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/komandas-darba-slodzes-parvaldiba\/\">komandas darba slodze<\/a>, <a href=\"https:\/\/teamdeck.io\/lv\/instrumentu-kaste\/sekojiet-lidzi-projektu-budzetam-ar-teamdeck\/\">projektu bud\u017eeti<\/a>vai uz\u0146\u0113muma INI.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Jo vispus\u012bg\u0101ks (un vienlaikus skaidr\u0101ks) ir skats, jo lab\u0101kas atzi\u0146as no t\u0101 varat g\u016bt.<\/span><\/p>\n<p data-pm-slice=\"1 3 []\">\u00a0<\/p>\n<h2 data-pm-slice=\"1 3 []\"><strong>K\u0101d\u0101 projekt\u0101 ir iesaist\u012bts resursu vad\u012bt\u0101js? K\u0101das ir vi\u0146a atkar\u012bbas?<\/strong><\/h2>\n<h3><strong>Projekta resursu vad\u012bt\u0101ja loma un pien\u0101kumi<\/strong><\/h3>\n<p><span data-color=\"var(--red-10)\">No betterteam.com - HR nozares uz\u0146\u0113muma:<\/span><\/p>\n<blockquote>\n<p><span data-color=\"var(--red-10)\">Resursu vad\u012bt\u0101ji pal\u012bdz projektu vad\u012bt\u0101jiem cilv\u0113kresursu pl\u0101no\u0161an\u0101 un person\u0101la sadal\u0113. Vi\u0146i nosaka uz\u0146\u0113muma sp\u0113ju apmierin\u0101t projektu person\u0101la vajadz\u012bbas, nor\u012bko person\u0101lu darbam projektos un pie\u0146em darb\u0101 jaunus darbiniekus. Vi\u0146i var ar\u012b p\u0101rvald\u012bt algu sarakstus un apm\u0101c\u012bt darbiniekus.<\/span><\/p>\n<\/blockquote>\n<p><span data-color=\"var(--red-10)\">Lab\u0101kai \u0161\u012bs noda\u013cas galven\u0101s lomas - resursu pl\u0101not\u0101ja - vizualiz\u0101cijai izmantosim nelielu sal\u012bdzin\u0101jumu. Sal\u012bdzin\u0101juma pamat\u0101 ir vienk\u0101r\u0161ota at\u0161\u0137ir\u012bba starp resursu pl\u0101not\u0101jiem un projektu vad\u012bt\u0101jiem. T\u0101tad projektu vad\u012bt\u0101ji darbojas projektu l\u012bmen\u012b - vi\u0146i koordin\u0113 projektu grupu (visbie\u017e\u0101k savstarp\u0113ji saist\u012btu) vai tikai vienu projektu. Vi\u0146i ir atbild\u012bgi par to, lai projekta komanda to pabeigtu. Savuk\u0101rt resursu vad\u012bt\u0101ji darbojas uz\u0146\u0113muma l\u012bmen\u012b. Atlasa, pie\u0161\u0137ir un saska\u0146o atbilsto\u0161i kvalific\u0113tus resursus vair\u0101kiem projektiem.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-medium\" src=\"https:\/\/media.giphy.com\/media\/oyPTTOQMtuzthM5xKX\/giphy.gif\" alt=\"Resursu p\u0101rvald\u012bbas pl\u0101ns ac\u012bmredzami ir svar\u012bgs elements, lai piln\u012bb\u0101 p\u0101rvald\u012btu iek\u0161\u0113jos un \u0101r\u0113jos resursus.\" width=\"480\" height=\"360\" \/><\/p>\n<p><span data-color=\"var(--red-10)\">Projektu vad\u012bt\u0101ju asoci\u0101cija ar Kirstenas Bird mutes ierosina \u0161\u0101du m\u016bsu zvaigznes noz\u012bmi.<\/span><\/p>\n<blockquote>\n<p><span data-color=\"var(--red-10)\">Projekta speci\u0101listam pl\u0101no\u0161anas gait\u0101 ir j\u0101identific\u0113 darba veik\u0161anai nepiecie\u0161amie resursi un, izmantojot grafiku, j\u0101nosaka, kad resursi b\u016bs nepiecie\u0161ami.<\/span><\/p>\n<\/blockquote>\n<p><span data-color=\"var(--red-10)\">M\u0113s v\u0113lamies \u012bpa\u0161i uzsv\u0113rt pirmo da\u013cu, kur\u0101 ir teikts \"J\u0101identific\u0113...\". K\u0101p\u0113c tas ir tik svar\u012bgi? Pirmk\u0101rt, bet ne vissvar\u012bg\u0101kais, jo tas ir s\u0101kuma punkts. Run\u0101jot par resursu p\u0101rvald\u012bbas aspektiem, liel\u0101koties tiek uzsv\u0113rta t\u0101s kodola pl\u0101no\u0161ana. \u0160eit m\u0113s redzam, kas ir labas pl\u0101no\u0161anas pamat\u0101 - m\u012bkst\u0101s prasmes, jo \u012bpa\u0161i lieliska acs un izj\u016bta ar cilv\u0113kiem. <\/span><\/p>\n<p>Tagad ir pien\u0101cis laiks <span data-color=\"var(--red-10)\">Resursu p\u0101rvaldnieka pien\u0101kumi:<\/span><\/p>\n<ul>\n<li><span data-color=\"var(--red-10)\">Darbinieku pieejam\u012bbas p\u0101rbaude, pamatojoties uz prasm\u0113m, un pie\u0161\u0137ir\u0161ana projektiem, kas atvieglos projekta pabeig\u0161anu nor\u0101d\u012btaj\u0101 laik\u0101 un bud\u017eet\u0101.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\">Darbinieku noslogojuma, darba slodzes un virsstundu skaita nov\u0113ro\u0161ana.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\">Procesu dokument\u0113\u0161ana un ierakstu uztur\u0113\u0161ana<\/span><\/li>\n<li><span data-color=\"var(--red-10)\">Sadarb\u012bba ar iek\u0161\u0113j\u0101m strukt\u016brvien\u012bb\u0101m un atbilsto\u0161a attiec\u012bgo darbinieku skaita nodro\u0161in\u0101\u0161ana.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\">Projektu vad\u012bt\u0101ju nodro\u0161in\u0101\u0161ana ar past\u0101v\u012bgu resursu p\u0101rvald\u012bbas atbalstu.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\">Resursu probl\u0113mu mazin\u0101\u0161ana, p\u0101rdalot darbiniekus, p\u0101rskatot m\u0113r\u0137us vai pie\u0161\u0137irot papildu komandu.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\">Jaunu darbinieku pie\u0146em\u0161ana darb\u0101 saska\u0146\u0101 ar uz\u0146\u0113muma vai projekta pras\u012bb\u0101m.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\">pal\u012bdz\u012bba person\u0101la procesos, piem\u0113ram, r\u0113\u0137inu izrakst\u012b\u0161an\u0101, person\u0101la apm\u0101c\u012bb\u0101, algu saraksta administr\u0113\u0161an\u0101, kompens\u0101ciju izmaks\u0101\u0161an\u0101 u. c.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\">Inform\u0113t par resursu p\u0101rvald\u012bbas un darba ties\u012bbu aktu tendenc\u0113m.<\/span><\/li>\n<\/ul>\n<h3><strong style=\"color: revert; font-size: revert; font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Roboto, Oxygen-Sans, Ubuntu, Cantarell, 'Helvetica Neue', sans-serif;\">Projekta resursu p\u0101rvaldnieka zin\u0101\u0161anu apjoms, no kura vi\u0146\u0161 ir atkar\u012bgs<\/strong><\/h3>\n<p><span data-color=\"var(--red-10)\">Projektu vad\u012bbas zin\u0101\u0161anu kopuma (Project Management Body of Knowledge (PMBOK)) sniegt\u0101s zin\u0101\u0161anas.<\/span><\/p>\n<ul>\n<li><span data-color=\"var(--red-10)\"><strong>Integr\u0101cijas p\u0101rvald\u012bba:<\/strong> Izmanto da\u017e\u0101dus projektu vad\u012bbas procesus un metodolo\u0123ijas, lai izveidotu strat\u0113\u0123iju, kas pal\u012bdz komand\u0101m lab\u0101k sadarboties.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\"><strong>Darb\u012bbas jomas p\u0101rvald\u012bba:<\/strong> Projekta uzdevumi, sasniedzamie rezult\u0101ti un starpposma m\u0113r\u0137i tiek identific\u0113ti, defin\u0113ti un kontrol\u0113ti, izmantojot procesu, kas ietver ieinteres\u0113to personu pras\u012bbu apkopo\u0161anu, darbu sadal\u012bjuma strukt\u016bras (WBS) izveidi un p\u0113c tam izmai\u0146u uzraudz\u012bbu un p\u0101rvald\u012bbu.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\"><strong>Grafiku p\u0101rvald\u012bba:<\/strong> izveido re\u0101listisku laika grafiku projekta m\u0113r\u0137u sasnieg\u0161anai.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\"><strong>Izmaksu p\u0101rvald\u012bba:<\/strong> Process, kas p\u0101rvalda ar projektu saist\u012bto izmaksu pl\u0101no\u0161anu un kontroli. Tas noz\u012bm\u0113 izmaksu apkopo\u0161anu, anal\u012bzi un zi\u0146o\u0161anu par t\u0101m, lai prognoz\u0113tu un uzraudz\u012btu projekta bud\u017eetu un nepie\u013cautu p\u0101rt\u0113ri\u0146u.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\"><strong>Kvalit\u0101tes vad\u012bba:<\/strong> Uzraudz\u012bt visas darb\u012bbas, kas saist\u012btas ar projekta rezult\u0101tu izstr\u0101di, lai p\u0101rliecin\u0101tos, ka tie atbilst kvalit\u0101tes pras\u012bb\u0101m. Tas tiek dar\u012bts, turpinot m\u0113r\u012bt kvalit\u0101ti vis\u0101 projekta \u012bsteno\u0161anas laik\u0101 un labojot jebk\u0101das novirzes no kvalit\u0101tes gaid\u0101m.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\"><strong>Resursu p\u0101rvald\u012bba:<\/strong> Projekta izpildei nepiecie\u0161amo cilv\u0113ku, materi\u0101lu un apr\u012bkojuma maksim\u0101la izmanto\u0161ana, p\u0113c vajadz\u012bbas sadalot un p\u0101rdalot resursus.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\"><strong>Komunik\u0101cijas vad\u012bba:<\/strong> Lai projekt\u0101 sniegtu skaidrus v\u0113st\u012bjumus, tiek izmantoti da\u017e\u0101di procesi. Tas ietver kan\u0101lu izveidi, bie\u017eumu un pareizu zi\u0146ojumu nos\u016bt\u012b\u0161anu, lai p\u0101rliecin\u0101tos, ka tie tiek sa\u0146emti savlaic\u012bgi un ir saprotami.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\"><strong>Risku p\u0101rvald\u012bba:<\/strong> Projekta risku identific\u0113\u0161ana, nov\u0113rt\u0113\u0161ana un nov\u0113r\u0161ana vai mazin\u0101\u0161ana, neatkar\u012bgi no t\u0101, vai tie ir negat\u012bvi riski, no kuriem j\u0101izvair\u0101s, vai pozit\u012bvi riski, kurus j\u0101izmanto.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\"><strong>Iepirkumu p\u0101rvald\u012bba:<\/strong> attiec\u012bbu veido\u0161ana un uztur\u0113\u0161ana ar projekt\u0101 nepiecie\u0161amajiem \u0101r\u0113jiem resursiem. Tas ietver ar\u012b p\u0101rdev\u0113jus, kas p\u0101rdod produktus un pakalpojumus, kuri nepiecie\u0161ami projekta m\u0113r\u0137u sasnieg\u0161anai.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\"><strong>Ieinteres\u0113to personu p\u0101rvald\u012bba:<\/strong> Projekta ieinteres\u0113to pu\u0161u identific\u0113\u0161ana, to v\u0113lmju un ietekmes noteik\u0161ana, k\u0101 ar\u012b strat\u0113\u0123iju izstr\u0101de, lai t\u0101s vad\u012btu un inform\u0113tu par progresu.<\/span><\/li>\n<\/ul>\n<h2><strong>Projekta resursu p\u0101rvald\u012bbas strat\u0113\u0123ijas<\/strong><\/h2>\n<h3 id=\"3\" style=\"text-align: justify;\">A. Resursu pie\u0161\u0137ir\u0161ana<\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">\u0145emot v\u0113r\u0101 darbinieku prasmes un pieejam\u012bbu, jums ir j\u0101b\u016bt sagatavotam to darbinieku sarakstam, kurus var nor\u012bkot darbam projekt\u0101. Kad darbinieku saraksts jau ir atlas\u012bts, lai pievienotos projektam, j\u016bs varat tos rezerv\u0113t izv\u0113l\u0113taj\u0101 r\u012bk\u0101.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-medium\" src=\"https:\/\/media.giphy.com\/media\/8IGuMMq3Aka8Zq9Kax\/giphy.gif\" alt=\"Resursu p\u0101rvald\u012bbas pl\u0101ns paredz, cik svar\u012bga ir projekta resursu p\u0101rvald\u012bba, lai kontrol\u0113tu uzdevumiem pabeigt nepiecie\u0161amos resursus.\" width=\"480\" height=\"343\" \/><\/p>\n<p style=\"text-align: justify;\">K\u0101 <a href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/resursu-pieskirsana-projektu-vaditajiem\/\" target=\"_blank\" rel=\"noopener noreferrer\">resursu pie\u0161\u0137ir\u0161ana<\/a> ir process, kur\u0101 maksim\u0101li tiek izmantoti j\u016bsu r\u012bc\u012bb\u0101 eso\u0161ie resursi, jums ir j\u0101seko l\u012bdzi to veiktsp\u0113jai un izmanto\u0161anai. \u0160is cilv\u0113kresursu p\u0101rvald\u012bbas aspekts pal\u012bdz\u0113s jums izvair\u012bties no nepietiekamas vai p\u0101rm\u0113r\u012bgas izmanto\u0161anas un nov\u0113rst darbinieku izdeg\u0161anu.<\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Citas resursu pie\u0161\u0137ir\u0161anas priek\u0161roc\u012bbas ir \u0161\u0101das:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">uzlabota visu uz\u0146\u0113muma resursu p\u0101rredzam\u012bba.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">prec\u012bz\u0101kas rezerv\u0101cijas.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">vienk\u0101r\u0161\u0101kas sarunas par rezerv\u0101cij\u0101m ar citiem PM.<\/span><\/span><\/li>\n<\/ul>\n<h3>B. Resursu izmanto\u0161ana<\/h3>\n<p>J\u016bs uzraug\u0101t, cik daudz darba veic j\u016bsu cilv\u0113kresursi, tehniskie, meh\u0101niskie un citi resursi, un vienlaikus kontrol\u0113jat ar\u012b vi\u0146u nostr\u0101d\u0101t\u0101s stundas. J\u016bs \u012bpa\u0161i piev\u0113rs\u012bsiet uzman\u012bbu resursiem, kas ir \"nepietiekami izmantoti\" vai \"p\u0101rlieku izmantoti\" (p\u0101rdal\u012b\u0161ana).<\/p>\n<h3>C. Resursu izl\u012bdzin\u0101\u0161ana<\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Ja varat piel\u0101got projekta grafiku, lai iev\u0113rotu projekta termi\u0146u, varat izmantot resursu izl\u012bdzin\u0101\u0161anu. Lai main\u012btu grafiku, izmantojot resursu izl\u012bdzin\u0101\u0161anu, sadaliet vai apvienojiet darb\u012bbas atbilsto\u0161i resursu pieejam\u012bbai, lai neb\u016btu nepietiekami vai p\u0101rm\u0113r\u012bgi izmantotu projekta komandas locek\u013cu.<\/span><\/p>\n<h3>D. Resursu prognoz\u0113\u0161ana<\/h3>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-10487 size-full\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2022\/05\/09115328\/timesheets_6_simplify-forecasting.jpg\" alt=\"\" width=\"2074\" height=\"1506\" \/><\/p>\n<p>Resursu vad\u012bt\u0101js, kur\u0161 labi veic savu darbu un p\u0101rzina savus skait\u013cus, sp\u0113s ar pamatotu p\u0101rliec\u012bbu prognoz\u0113t, cik daudz darba vi\u0146a komanda var paveikt noteikt\u0101 laika posm\u0101. Tas \u013cauj komandai un uz\u0146\u0113mumam prec\u012bzi sagatavoties un pl\u0101not gaid\u0101m\u0101s saist\u012bbas.<\/p>\n<p>\u00a0<\/p>\n<h2 id=\"2\" style=\"text-align: justify;\"><strong>Augsta l\u012bme\u0146a pl\u0101no\u0161ana un projektu resursu p\u0101rvald\u012bba<\/strong><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Tagad, kad zin\u0101t, kas ir resursu p\u0101rvald\u012bba, jums ir j\u0101izstr\u0101d\u0101 pl\u0101ns. Un ne tikai pl\u0101ns, lai efekt\u012bvi p\u0101rvald\u012btu resursus vair\u0101kos projektos, jums ir nepiecie\u0161ams augsta l\u012bme\u0146a pl\u0101ns katram projektam.<\/span><\/p>\n<h3 style=\"text-align: justify;\"><strong>Augsta l\u012bme\u0146a pl\u0101no\u0161ana<\/strong><\/h3>\n<p style=\"text-align: justify;\"><a href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/augsta-limena-planosana-izmantojot-teamdeck-lai-jusu-komandas-gutu-panakumus\/\"><span style=\"font-weight: 400;\">Augsta l\u012bme\u0146a pl\u0101no\u0161ana<\/span><\/a><span style=\"font-weight: 400;\"> ir projekta vad\u012bt\u0101ja skat\u012bjums uz to:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">m\u0113r\u0137is, <\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">uz\u0146\u0113m\u0113jdarb\u012bbas m\u0113r\u0137iem, <\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">ierobe\u017eojumi, <\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">cilv\u0113ki, kas vajadz\u012bgi, lai to nodro\u0161in\u0101tu, <\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">grafiks un bud\u017eets.<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Projekta resursu p\u0101rvald\u012bb\u0101 augsta l\u012bme\u0146a pl\u0101ns pal\u012bdz atbild\u0113t uz jaut\u0101jumu: \"K\u0101das funkcijas man ir nepiecie\u0161amas, lai veiksm\u012bgi \u012bstenotu projektu laik\u0101 un bud\u017eeta ietvaros?\".<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Veidojot augsta l\u012bme\u0146a pl\u0101nu, jums v\u0113l nav j\u0101izveido detaliz\u0113ts visu uzdevumu saraksts. T\u0101 viet\u0101 jums ir j\u0101iek\u013cauj:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\"><b>M\u0113r\u0137i<\/b><span style=\"font-weight: 400;\"> -t\u0101s sniedz jums izpratni par to, kas projekt\u0101 ir j\u0101sasniedz.<\/span><\/li>\n<li style=\"font-weight: 400;\"><b>Laika grafiks<\/b><span style=\"font-weight: 400;\"><span style=\"font-weight: 400;\"> - pal\u012bdz jums saprast.\u00a0<\/span><\/span><span data-preserver-spaces=\"true\">k\u0101ds ir projekta \u012bsteno\u0161anas termi\u0146\u0161 un vai tas ir iesp\u0113jams ar j\u016bsu r\u012bc\u012bb\u0101 eso\u0161ajiem resursiem.<\/span><\/li>\n<li style=\"font-weight: 400;\"><b>Komanda<\/b><span style=\"font-weight: 400;\"> - tas \u013cauj jums saprast, k\u0101das lomas jums ir nepiecie\u0161amas projekt\u0101.<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Izmantojot augsta l\u012bme\u0146a pl\u0101nu, j\u016bs g\u016bsiet lab\u0101ku p\u0101rskatu par savu resursu kapacit\u0101ti un projekta apjomu.<\/span><\/p>\n<h3 style=\"text-align: justify;\"><strong>Resursu pl\u0101no\u0161ana\u00a0<\/strong><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Ja ir izstr\u0101d\u0101ts augsta l\u012bme\u0146a pl\u0101ns, jums ir kopaina par to, kas ir nepiecie\u0161ams, lai \u012bstenotu projektu. M\u0113s jau min\u0113j\u0101m, ka tas ar\u012b pal\u012bdz jums saprast, k\u0101das lomas jums ir nepiecie\u0161amas, lai to \u012bstenotu. Bet k\u0101 tie\u0161i j\u016bs identific\u0113jat \u0161\u012bs lomas pirms to pie\u0161\u0137ir\u0161anas \u0161im jaunajam projektam?<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Saska\u0146\u0101 ar starptautiski paz\u012bstam\u0101 Projektu vad\u012bbas instit\u016bta izstr\u0101d\u0101to standartu PMBOK\u00ae, <\/span><a href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/resursu-planosana-projektu-vadiba\/\"><span style=\"font-weight: 400;\">resursu pl\u0101no\u0161ana<\/span><\/a><span style=\"font-weight: 400;\"> ir \"noteikt, k\u0101di resursi (cilv\u0113ki, iek\u0101rtas, materi\u0101li utt.) un k\u0101d\u0101 daudzum\u0101 b\u016btu j\u0101izmanto projekta aktivit\u0101\u0161u veik\u0161anai.\"<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Izmantojot <a href=\"https:\/\/www.projectmanager.com\/training\/what-is-a-work-breakdown-structure?msID=3a3b4e36-7937-4484-aa6b-278ff5febaa0\">darbu sadal\u012bjuma strukt\u016bra<\/a>, paredzamo ilgumu vai v\u0113sturiskajiem datiem, varat noteikt:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">to darbinieku sarakstu, kuriem ir projekta \u012bsteno\u0161anai nepiecie\u0161am\u0101s prasmes,<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">to pa\u0161reiz\u0113j\u0101s rezerv\u0101cijas un pieejam\u012bbu,<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">to pieejam\u012bbu vis\u0101 projekta laik\u0101.<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\">Kad esat izveidojis sarakstu ar darbiniekiem, kurus varat rezerv\u0113t, neradot grafiku konfliktus, esat gatavs tos pie\u0161\u0137irt projektam.<\/p>\n<h3 style=\"text-align: justify;\"><strong>Efekt\u012bva n\u0101kotnes projektu pl\u0101no\u0161ana k\u0101 projekta resursu pl\u0101no\u0161anas pamatm\u0113r\u0137is.<\/strong><\/h3>\n<p style=\"text-align: justify;\">Ja jums ir augsta l\u012bme\u0146a pl\u0101ni visiem j\u016bsu \u012bstenotajiem projektiem un priek\u0161stats par to, k\u0101 \u0161obr\u012bd izmantot savus resursus, j\u016bs zin\u0101t savu kapacit\u0101ti un uz\u0146\u0113muma darbu grafiku.<\/p>\n<p style=\"text-align: justify;\"><span data-preserver-spaces=\"true\">Tagad, kad j\u016bsu uz\u0146\u0113mums ieg\u016bst jaunus projektus, varat \u0101tri atbild\u0113t uz \u0161\u0101diem jaut\u0101jumiem:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li><span data-preserver-spaces=\"true\">Vai j\u016bs sp\u0113jat \u012bstenot \u0161os projektus, piem\u0113ram, nepie\u0146emot darb\u0101 vair\u0101k cilv\u0113kresursu (neatkar\u012bgi no t\u0101, vai tie ir iek\u0161\u0113jie vai \u0101r\u0161tata darbinieki)?\u00a0<\/span><\/li>\n<li><span data-preserver-spaces=\"true\">Kad j\u016bs varat s\u0101kt un k\u0101 tas ietekm\u0113 j\u016bsu pe\u013c\u0146u? To var p\u0101rbaud\u012bt, piem\u0113ram, apr\u0113\u0137inot projekta rentabilit\u0101ti, k\u0101 ar\u012b potenci\u0101lo darb\u0101 pie\u0146em\u0161anas procesu izmaksas.<\/span><\/li>\n<\/ul>\n<h2 style=\"text-align: justify;\"><strong>Projekta darbinieku uz\u0146em\u0161ana darb\u0101 k\u0101 da\u013ca no efekt\u012bvas projekta resursu p\u0101rvald\u012bbas<\/strong><\/h2>\n<p style=\"text-align: justify;\"><a href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/projekta-ievadapmaciba\/\" target=\"_blank\" rel=\"noopener noreferrer\">Projekta uzs\u0101k\u0161ana<\/a> ir svar\u012bga da\u013ca no <a href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/projekta-resursu-parvaldiba\/\" target=\"_blank\" rel=\"noopener noreferrer\">efekt\u012bva resursu p\u0101rvald\u012bba<\/a>. Iepaz\u012bstiniet komandas locek\u013cus ar projekta, pie kura vi\u0146i str\u0101d\u0101s, m\u0113r\u0137iem, uzdevumiem un rezult\u0101tiem. \u0160\u0101da strat\u0113\u0123ija palielin\u0101s <a href=\"https:\/\/teamdeck.io\/lv\/komandas-laime\/projekta-parredzamiba\/\" target=\"_blank\" rel=\"noopener noreferrer\">projekta p\u0101rredzam\u012bba<\/a> un pal\u012bdz\u0113s jums k\u0101 premjerministram veidot uztic\u012bbu sav\u0101 komand\u0101.<\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">\u0160\u012b procesa da\u013ca sast\u0101v no 4 posmiem:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Projekta inform\u0101cijas nodo\u0161ana komandai - dokumentos, kurus varat izmantot, ir iek\u013cauts sasniedzamo rezult\u0101tu saraksts (piem.,, <\/span><span style=\"font-weight: 400;\">Biznesa pras\u012bbu dokuments<\/span><span style=\"font-weight: 400;\">), projekta grafiks, pa\u0161reiz\u0113jais darba apraksts (<\/span><span style=\"font-weight: 400;\">SOW<\/span><span style=\"font-weight: 400;\">) un ikned\u0113\u013cas projekta statusa zi\u0146ojums.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Pie\u0161\u0137irt komandas dal\u012bbniekus pareizajam projektam. <\/span><span style=\"font-weight: 400;\">resursu p\u0101rvald\u012bbas r\u012bks<\/span><span style=\"font-weight: 400;\"> lietojat (ja vien tas jau nav izdar\u012bts).<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Iestatiet sadarb\u012bbas r\u012bkus un sazi\u0146as kan\u0101lus un pie\u0161\u0137iriet komandas locek\u013ciem piek\u013cuvi tiem, kas vi\u0146iem b\u016bs nepiecie\u0161ami, str\u0101d\u0101jot pie projekta.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Ievietojiet ievadsemin\u0101ru.<\/span><\/li>\n<\/ul>\n<h2 id=\"4\" style=\"text-align: justify;\"><strong>Projektu un resursu pl\u0101no\u0161anas metodes<\/strong><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Lai saska\u0146otu projekta grafiku, pieejamos resursus un darb\u012bbas jomu, izmantojiet resursu pl\u0101no\u0161anu. Tas ir \u013coti svar\u012bgi, jo nor\u0101da, kad tie\u0161i jums b\u016bs nepiecie\u0161ami konkr\u0113ti resursi, lai j\u016bs var\u0113tu attiec\u012bgi pl\u0101not rezerv\u0101cijas. Neaizmirstiet sekot l\u012bdzi resursu pieejam\u012bbai, pie\u0161\u0137irot cilv\u0113kus projektiem.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Ir vair\u0101ki <\/span><a href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/projektu-planosanas-metodes\/\"><span style=\"font-weight: 400;\">projektu pl\u0101no\u0161anas metodes<\/span><\/a><span style=\"font-weight: 400;\"> varat izmantot:<\/span><\/p>\n<h3 style=\"text-align: justify;\"><strong>A. Kritisk\u0101 ce\u013ca metode<\/strong><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Port\u0101ls <\/span><a href=\"https:\/\/hbr.org\/1963\/09\/the-abcs-of-the-critical-path-method\"><span style=\"font-weight: 400;\">Kritisk\u0101 ce\u013ca metode<\/span><\/a><span style=\"font-weight: 400;\"> (CPM) ir metode, ko izmanto, lai noteiktu ilg\u0101ko iesp\u0113jamo projekta pabeig\u0161anas laiku. Uzskaitot visus uzdevumus un iedalot tos kritiskajos un main\u012bgajos kategorij\u0101s, var apr\u0113\u0137in\u0101t laika grafiku un atz\u012bm\u0113t atkar\u012bbas starp uzdevumiem.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Lai izveidotu uzdevumu pl\u016bsmu, izmantojot CPM metodi, ir nepiecie\u0161ams:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">projekta darb\u012bbas jomu,<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">sarakstu ar visiem uzdevumiem, kas nepiecie\u0161ami t\u0101 pabeig\u0161anai.<\/span><\/li>\n<\/ul>\n<h3 style=\"text-align: justify;\"><strong>B. Programmas nov\u0113rt\u0113\u0161anas un p\u0101rskat\u012b\u0161anas metode<\/strong><\/h3>\n<p style=\"text-align: justify;\"><a href=\"https:\/\/www.techopedia.com\/definition\/12112\/program-evaluation-and-review-technique-pert\"><span style=\"font-weight: 400;\">Programmas nov\u0113rt\u0113\u0161anas un p\u0101rskat\u012b\u0161anas metode<\/span><\/a><span style=\"font-weight: 400;\"> (PERT) ir metode, kas ir l\u012bdz\u012bga CPM metodei, ta\u010du, lai apr\u0113\u0137in\u0101tu iesp\u0113jamos termi\u0146us, t\u0101 izmanto vid\u0113jo sv\u0113rto ilgumu, nevis apl\u0113ses.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Izmantojot PERT, jums b\u016bs j\u0101izveido ar\u012b uzdevumu saraksts ar to savstarp\u0113j\u0101m atkar\u012bb\u0101m, tostarp katra uzdevuma starpposma m\u0113r\u0137iem un paredzamo ilgumu. Pamatojoties uz \u0161o inform\u0101ciju, j\u016bs varat apl\u0113st projekta laika grafiku tr\u012bs ticam\u012bbas l\u012bme\u0146os:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Optimistisks laika grafiks<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Visticam\u0101kais laiks<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Pesimistisks laika grafiks<\/span><\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium aligncenter\" src=\"https:\/\/media.giphy.com\/media\/cApRuznZiLJo246DmE\/giphy.gif\" alt=\"Lai ieg\u016btu projektu pabeig\u0161anai nepiecie\u0161amos resursus, resursu p\u0101rvaldniekam ir j\u0101b\u016bt padzi\u013cin\u0101t\u0101m zin\u0101\u0161an\u0101m par\" width=\"480\" height=\"270\" \/><\/p>\n<h3 style=\"text-align: justify;\"><strong>C. Pa\u0101trin\u0101ta mekl\u0113\u0161ana<\/strong><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Pa\u0101trin\u0101ta pl\u0101no\u0161ana ir vienk\u0101r\u0161s pl\u0101no\u0161anas pa\u0146\u0113miens, ko izmanto projektu vad\u012bt\u0101ji, lai noteiktu, kurus uzdevumus var veikt vienlaic\u012bgi. Zinot projekta uzdevumu savstarp\u0113jo atkar\u012bbu, j\u016bs zin\u0101t, kuriem uzdevumiem ir nepiecie\u0161ams iepriek\u0161 veikt citus uzdevumus. T\u0101pat j\u016bs varat uzskait\u012bt uzdevumus, kas var vismaz da\u013c\u0113ji p\u0101rkl\u0101ties, lai pa\u0101trin\u0101tu projekta izpildi.<\/span><\/p>\n<h3 style=\"text-align: justify;\"><strong>D. Crashing<\/strong><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Ja, izmantojot pa\u0101trin\u0101to izseko\u0161anu, nav izdevies ietaup\u012bt v\u0113lamo laika daudzumu, varat izmantot crashing tehniku. Tom\u0113r tas maks\u0101 d\u0101rgi, jo, lai pa\u0101trin\u0101tu projektu, ir j\u0101pieskaita laiks. Veids, k\u0101 to izdar\u012bt, ir, piem\u0113ram, pievienot apmaks\u0101tus virsstundas - galu gal\u0101 jums ir liel\u0101kas projekta izmaksas, bet j\u016bs joproj\u0101m sp\u0113jat iek\u013cauties termi\u0146\u0101.<\/span><\/p>\n<p style=\"text-align: justify;\">\u00a0<\/p>\n<h2 id=\"5\" style=\"text-align: justify;\"><strong>M\u0113r\u012b\u0161ana un zi\u0146o\u0161ana<\/strong><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Balstoties uz datiem, ko apkopojat, ievie\u0161ot resursu p\u0101rvald\u012bbu, piem\u0113ram, darbinieku rezerv\u0113to laiku, darba laika ierakstiem un pieejam\u012bbu, varat nov\u0113rt\u0113t vi\u0146u sniegumu un citus uz\u0146\u0113m\u0113jdarb\u012bbas r\u0101d\u012bt\u0101jus.<\/span><\/p>\n<h3 style=\"text-align: justify;\"><strong>Resursu izmanto\u0161anas m\u0113r\u012b\u0161ana<\/strong><\/h3>\n<p style=\"text-align: justify;\"><a href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/ka-izmerit-resursu-izmantosanu\/\"><span style=\"font-weight: 400;\">resursu izmanto\u0161anas m\u0113r\u012b\u0161ana<\/span><\/a><span style=\"font-weight: 400;\"> p\u0113c vienk\u0101r\u0161as formulas:<\/span><\/p>\n<p style=\"text-align: justify;\"><i><span style=\"font-weight: 400;\">Resursu izmanto\u0161ana = aiz\u0146emt\u012bbas laiks \/ pieejamais laiks<\/span><\/i><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Neatkar\u012bgi no t\u0101, vai izmantojat izkl\u0101jlapu vai resursu p\u0101rvald\u012bbas r\u012bku, varat to izmantot, lai sal\u012bdzin\u0101tu rezerv\u0101cijas ar pieejam\u012bbu. Rezult\u0101t\u0101 ieg\u016btais r\u0101d\u012bt\u0101js par\u0101da, vai darbinieku laiks tiek izmantots efekt\u012bvi, vai ar\u012b vi\u0146i tiek izmantoti vair\u0101k vai maz\u0101k.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">T\u0101pat \u0161o r\u0101d\u012bt\u0101ju varat izmantot, lai sal\u012bdzin\u0101tu r\u0113\u0137in\u0101 nor\u0101d\u0101mo laiku ar darbinieku re\u0123istr\u0113to darba laiku. \u0160\u0101d\u0101 veid\u0101 j\u016bs varat noteikt, vai j\u016bsu resursi tiek izmantoti produkt\u012bvi.<\/span><\/p>\n<p>\u00a0<\/p>\n<h3 style=\"text-align: justify;\"><strong>Projekta bud\u017eeta apr\u0113\u0137in\u0101\u0161ana<\/strong><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Kad apkopojat rezerv\u0101ciju un darba laika uzskaites datus, varat. <\/span><span style=\"font-weight: 400;\">apr\u0113\u0137in\u0101t projekta bud\u017eetu.<\/span><span style=\"font-weight: 400;\">, ar\u012b. J\u016bs pat varat tos izmantot, lai sekotu l\u012bdzi bud\u017eetam vis\u0101 projekta gait\u0101 un redz\u0113tu, vai nep\u0101rsniedzat paredz\u0113t\u0101s izmaksas vai n\u0113.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-10489 size-full\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2022\/05\/09115249\/timesheets_8_compare_estimates.jpg\" alt=\"\" width=\"1958\" height=\"1092\" \/><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Piem\u0113ram, varat sal\u012bdzin\u0101t rezerv\u0101cijas ar darba laika uzskaites lap\u0101m, lai redz\u0113tu, vai re\u0123istr\u0113tais darba laiks atbilst j\u016bsu apl\u0113s\u0113m. Tad, zinot darbinieku stundas tarifa likmes, varat apr\u0113\u0137in\u0101t faktisk\u0101s projekt\u0101 pavad\u012bt\u0101 laika izmaksas, lai noteiktu faktisko bud\u017eetu.<\/span><\/p>\n<p style=\"text-align: justify;\"><span data-preserver-spaces=\"true\">Ar\u012b \u0161aj\u0101 gad\u012bjum\u0101 varat izmantot izkl\u0101jlapu, bet daudz \u0113rt\u0101k b\u016bs izmantot resursu p\u0101rvald\u012bbas r\u012bku ar\u00a0<\/span><a class=\"_e75a791d-denali-editor-page-rtfLink\" href=\"https:\/\/teamdeck.io\/lv\/zino\/\" target=\"_blank\" rel=\"noopener\"><span data-preserver-spaces=\"true\">zi\u0146o\u0161anas funkcijas<\/span><\/a><span data-preserver-spaces=\"true\">.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><strong>S\u0101ciet efekt\u012bv\u0101k p\u0101rvald\u012bt savas komandas jau \u0161odien - izmantojiet resursu p\u0101rvald\u012bbas sist\u0113mu.<\/strong><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Projekts <a href=\"https:\/\/teamdeck.io\/lv\/instrumentu-kaste\/ietaupiet-naudu-ar-resursu-parvaldibu\/\" target=\"_blank\" rel=\"noopener\">resursu p\u0101rvald\u012bba ietaupa naudu<\/a>. Lai gan no pirm\u0101 acu uzmetiena tas var \u0161\u0137ist sare\u017e\u0123\u012bti, tas nav nemaz tik sare\u017e\u0123\u012bti, tikl\u012bdz j\u016bs to saprat\u012bsiet. Padariet to par da\u013cu no savas komandas projektu vad\u012bbas procesa un vienm\u0113r izmantojiet pareizos resursus un pareizo laiku.\u00a0<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Ievie\u0161ot resursu p\u0101rvald\u012bbas sist\u0113mu, varat ietaup\u012bt sev daudz p\u016b\u013cu. Teamdeck ir \u0161\u0101das sist\u0113mas piem\u0113rs <a href=\"https:\/\/teamdeck.io\/lv\/\">projektu resursu p\u0101rvald\u012bbas programmat\u016bra<\/a>, kas apvieno resursu pl\u0101no\u0161anu, laika uzskaiti, atva\u013cin\u0101jumu p\u0101rvald\u012bbu un piel\u0101gotus p\u0101rskatus. Izmantojot \u0161o r\u012bku, varat viegli pievienot rezerv\u0101cijas, re\u0123istr\u0113t laika ierakstus, p\u0101rvald\u012bt un piel\u0101got kalend\u0101ru un apr\u0113\u0137in\u0101t j\u016bsu izv\u0113l\u0113tos r\u0101d\u012bt\u0101jus, izmantojot \u0161os datus.<\/span><\/p>\n<p>V\u0113laties b\u016bt <a href=\"https:\/\/teamdeck.io\/lv\/teamdeck\/efektiva-resursu-parvaldiba-teamdeck\/\" target=\"_blank\" rel=\"noopener\">efekt\u012bvs resursu p\u0101rvaldnieks<\/a>? Mekl\u0113jat <a href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/bezmaksas-resursi-projektu-vaditaji-2020\/\" target=\"_blank\" rel=\"noopener\">bezmaksas resursi projektu vad\u012bt\u0101jiem<\/a>? Vai v\u0113laties zin\u0101t <a href=\"https:\/\/teamdeck.io\/lv\/teamdeck\/kapec-uznemumi-izvelas-teamdeck\/\" target=\"_blank\" rel=\"noopener\">k\u0101p\u0113c uz\u0146\u0113mumi izv\u0113las Teamdeck<\/a> k\u0101 savu pasta risin\u0101jumu projektu resursu p\u0101rvald\u012bbai? Joproj\u0101m nezinu, k\u0101p\u0113c projektu <a href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/kapec-resursu-parvaldiba-ir-svariga\/\" target=\"_blank\" rel=\"noopener\">resursu p\u0101rvald\u012bba ir svar\u012bga.<\/a>?<\/p>\n<div class=\"vc_row wpb_row vc_row-fluid redl-row-section feature-row vc_custom_1574416816256 vc_row-o-equal-height vc_row-o-content-middle vc_row-flex padding-medium bgv-default bgh-default halign-center\"><\/div><div class=\"vc_row wpb_row vc_row-fluid redl-row-section vc_row-o-content-middle vc_row-flex padding-default bgv-default bgh-default halign-default\"><div class=\"wpb_column vc_column_container text-center vc_col-sm-12 padding-default bgv-default bgh-default halign-center\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\">\n\t<div class=\"wpb_text_column wpb_content_element\" >\n\t\t<div class=\"wpb_wrapper\">\n\t\t\t<h2 class=\"ql-align-center\" style=\"text-align: center;\"><strong>Vai mekl\u0113jat projektu resursu p\u0101rvald\u012bbas sist\u0113mu?<\/strong><\/h2>\n\n\t\t<\/div>\n\t<\/div>\n<a class=\"redl-btn   vc_custom_1596025898618 redl-btn-medium redl-btn-69d2988d747b0 btn-icon-left redl-btn redl-btn-two vc_custom_1551260371526 redl-btn-medium redl-btn-5f2168a4adf5d btn-hover-one btn-icon-right signup-top\" href=\"https:\/\/app.teamdeck.io\/register\">Ieg\u016bstiet 30 dienu BEZMAKSAS izm\u0113\u0123in\u0101juma versiju<\/a><div class=\"vc_empty_space\"   style=\"height: 32px\" ><span class=\"vc_empty_space_inner\"><\/span><\/div>\n<\/div><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"Vadot projektu, j\u016bs ne tikai p\u0101rvald\u0101t uzdevumus, kas nepiecie\u0161ami, lai to \u012bstenotu. Tas, k\u0101 j\u016bs pl\u0101nojat, organiz\u0113jat un vad\u0101t savu komandu, liel\u0101 m\u0113r\u0101 ietekm\u0113 j\u016bsu projekta pan\u0101kumus.","protected":false},"author":3,"featured_media":4603,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22],"tags":[86,38,51],"class_list":["post-4601","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management","tag-project-resource-management","tag-resource-management","tag-resource-management-guide"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v23.8 (Yoast SEO v24.3) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Project Resource Management - The Real Guide for Project Managers<\/title>\n<meta name=\"description\" content=\"How you plan, organize and manage your team has a big impact on your project\u2019s success. Learn how to manage your teams with this resource management guide.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/projektu-resursu-parvaldibas-rokasgramata\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Resource Management 101: Guide for Project Managers\" \/>\n<meta property=\"og:description\" content=\"How you plan, organize and manage your team has a big impact on your project\u2019s success. Learn how to manage your teams with this resource management guide.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/projektu-resursu-parvaldibas-rokasgramata\/\" \/>\n<meta property=\"og:site_name\" content=\"Teamdeck\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/helloteamdeck\" \/>\n<meta property=\"article:published_time\" content=\"2019-01-28T14:05:48+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-10-15T17:00:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/28150300\/resource-management-guide.png\" \/>\n<meta name=\"author\" content=\"Pawe\u0142 Ha\u0142abuda\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Resource Management 101: Guide for Project Managers\" \/>\n<meta name=\"twitter:description\" content=\"How you plan, organize and manage your team has a big impact on your project\u2019s success. Learn how to manage your teams with this resource management guide.\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/28150300\/resource-management-guide.png\" \/>\n<meta name=\"twitter:creator\" content=\"@helloteamdeck\" \/>\n<meta name=\"twitter:site\" content=\"@helloteamdeck\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Pawe\u0142 Ha\u0142abuda\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"26 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/\",\"url\":\"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/\",\"name\":\"Project Resource Management - The Real Guide for Project Managers\",\"isPartOf\":{\"@id\":\"https:\/\/teamdeck.io\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/28150300\/resource-management-guide.png\",\"datePublished\":\"2019-01-28T14:05:48+00:00\",\"dateModified\":\"2023-10-15T17:00:08+00:00\",\"author\":{\"@id\":\"https:\/\/teamdeck.io\/#\/schema\/person\/1073b38fa48e5b06f16eba3840da6f5e\"},\"description\":\"How you plan, organize and manage your team has a big impact on your project\u2019s success. Learn how to manage your teams with this resource management guide.\",\"breadcrumb\":{\"@id\":\"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/#breadcrumb\"},\"inLanguage\":\"lv\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lv\",\"@id\":\"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/#primaryimage\",\"url\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/28150300\/resource-management-guide.png\",\"contentUrl\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/28150300\/resource-management-guide.png\",\"width\":\"1920\",\"height\":\"1080\",\"caption\":\"Guide how to manage project tasks and project management resources\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/teamdeck.io\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Project Resource Management 101: Guide for Project Managers\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/teamdeck.io\/#website\",\"url\":\"https:\/\/teamdeck.io\/\",\"name\":\"Teamdeck\",\"description\":\"resource scheduling + time tracking + leave management\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/teamdeck.io\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/teamdeck.io\/#\/schema\/person\/1073b38fa48e5b06f16eba3840da6f5e\",\"name\":\"Pawe\u0142 Ha\u0142abuda\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv\",\"@id\":\"https:\/\/teamdeck.io\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113657\/s38W_LT-150x150.jpg\",\"contentUrl\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113657\/s38W_LT-150x150.jpg\",\"caption\":\"Pawe\u0142 Ha\u0142abuda\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Project Resource Management - The Real Guide for Project Managers","description":"How you plan, organize and manage your team has a big impact on your project\u2019s success. Learn how to manage your teams with this resource management guide.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/projektu-resursu-parvaldibas-rokasgramata\/","og_locale":"lv_LV","og_type":"article","og_title":"Resource Management 101: Guide for Project Managers","og_description":"How you plan, organize and manage your team has a big impact on your project\u2019s success. Learn how to manage your teams with this resource management guide.","og_url":"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/projektu-resursu-parvaldibas-rokasgramata\/","og_site_name":"Teamdeck","article_publisher":"https:\/\/www.facebook.com\/helloteamdeck","article_published_time":"2019-01-28T14:05:48+00:00","article_modified_time":"2023-10-15T17:00:08+00:00","og_image":[{"url":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/28150300\/resource-management-guide.png","type":"","width":"","height":""}],"author":"Pawe\u0142 Ha\u0142abuda","twitter_card":"summary_large_image","twitter_title":"Resource Management 101: Guide for Project Managers","twitter_description":"How you plan, organize and manage your team has a big impact on your project\u2019s success. Learn how to manage your teams with this resource management guide.","twitter_image":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/28150300\/resource-management-guide.png","twitter_creator":"@helloteamdeck","twitter_site":"@helloteamdeck","twitter_misc":{"Written by":"Pawe\u0142 Ha\u0142abuda","Est. reading time":"26 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/","url":"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/","name":"Project Resource Management - The Real Guide for Project Managers","isPartOf":{"@id":"https:\/\/teamdeck.io\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/#primaryimage"},"image":{"@id":"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/#primaryimage"},"thumbnailUrl":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/28150300\/resource-management-guide.png","datePublished":"2019-01-28T14:05:48+00:00","dateModified":"2023-10-15T17:00:08+00:00","author":{"@id":"https:\/\/teamdeck.io\/#\/schema\/person\/1073b38fa48e5b06f16eba3840da6f5e"},"description":"How you plan, organize and manage your team has a big impact on your project\u2019s success. Learn how to manage your teams with this resource management guide.","breadcrumb":{"@id":"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/#breadcrumb"},"inLanguage":"lv","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/"]}]},{"@type":"ImageObject","inLanguage":"lv","@id":"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/#primaryimage","url":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/28150300\/resource-management-guide.png","contentUrl":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/28150300\/resource-management-guide.png","width":"1920","height":"1080","caption":"Guide how to manage project tasks and project management resources"},{"@type":"BreadcrumbList","@id":"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/teamdeck.io\/"},{"@type":"ListItem","position":2,"name":"Project Resource Management 101: Guide for Project Managers"}]},{"@type":"WebSite","@id":"https:\/\/teamdeck.io\/#website","url":"https:\/\/teamdeck.io\/","name":"Teamdeck","description":"resource scheduling + time tracking + leave management","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teamdeck.io\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv"},{"@type":"Person","@id":"https:\/\/teamdeck.io\/#\/schema\/person\/1073b38fa48e5b06f16eba3840da6f5e","name":"Pawe\u0142 Ha\u0142abuda","image":{"@type":"ImageObject","inLanguage":"lv","@id":"https:\/\/teamdeck.io\/#\/schema\/person\/image\/","url":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113657\/s38W_LT-150x150.jpg","contentUrl":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113657\/s38W_LT-150x150.jpg","caption":"Pawe\u0142 Ha\u0142abuda"}}]}},"_links":{"self":[{"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/posts\/4601","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/comments?post=4601"}],"version-history":[{"count":121,"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/posts\/4601\/revisions"}],"predecessor-version":[{"id":12495,"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/posts\/4601\/revisions\/12495"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/media\/4603"}],"wp:attachment":[{"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/media?parent=4601"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/categories?post=4601"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/tags?post=4601"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}