{"id":3892,"date":"2024-06-24T09:31:34","date_gmt":"2024-06-24T07:31:34","guid":{"rendered":"https:\/\/teamdeck.io\/?p=3892"},"modified":"2025-01-23T22:35:33","modified_gmt":"2025-01-23T20:35:33","slug":"how-to-measure-resource-utilization","status":"publish","type":"post","link":"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/ka-izmerit-resursu-izmantosanu\/","title":{"rendered":"K\u0101 apr\u0113\u0137in\u0101t resursu izmantojumu: Ce\u013cvedis projektu vad\u012bt\u0101jiem"},"content":{"rendered":"<p><strong>Uz\u0146\u0113mumi parasti iegulda daudz p\u016b\u013cu, lai <\/strong><a rel=\"noopener noreferrer\" href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/resursu-pieskirsana-projektu-vaditajiem\/\"><strong>resursu pie\u0161\u0137ir\u0161ana<\/strong><\/a><strong>. J\u016bs v\u0113laties, lai visi b\u016btu aiz\u0146emti, vienlaikus nodro\u0161inot, ka vi\u0146u uzdevumi uz\u0146\u0113mumam ir v\u0113rt\u012bgi (kas bie\u017ei vien noz\u012bm\u0113, ka par tiem var sa\u0146emt r\u0113\u0137inus). Komandai pieaugot, tas k\u013c\u016bst patie\u0161\u0101m sare\u017e\u0123\u012bti, jo \u012bpa\u0161i tad, ja jums ir j\u0101pie\u0161\u0137ir cilv\u0113ki vair\u0101kiem vienlaic\u012bgi notieko\u0161iem projektiem.<\/strong><\/p>\n\n\n\n<p>Rakst\u0101 ir:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>Da\u017eas formulas, k\u0101 izm\u0113r\u012bt resursu izmanto\u0161anas l\u012bmeni<\/p><\/li>\n\n\n\n<li><p>Ko noz\u012bm\u0113 pieejam\u012bba resursu izmanto\u0161an\u0101<\/p><\/li>\n\n\n\n<li><p>Ietekm\u012bg\u0101 loma <a href=\"https:\/\/teamdeck.io\/lv\/\" rel=\"noopener noreferrer\">resursu p\u0101rvald\u012bbas programmat\u016bra<\/a> resursu izmanto\u0161an\u0101<\/p><\/li>\n\n\n\n<li><p>At\u0161\u0137ir\u012bbas starp produkt\u012bvo izmanto\u0161anu un apmaks\u0101jamo izmanto\u0161anu<\/p><\/li>\n\n\n\n<li><p>K\u0101 \u012bstenot resursu izmanto\u0161anu<\/p><\/li>\n<\/ul>\n\n\n\n<p><iframe loading=\"lazy\" title=\"K\u0100: izm\u0113r\u012bt komandas izmanto\u0161anu? Komandas izmanto\u0161anas p\u0101rskats | Teamdeck atbalsts\" width=\"1170\" height=\"658\" src=\"https:\/\/www.youtube.com\/embed\/LE2mK_jPZQc?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1164\" height=\"776\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/24135020\/MeasuringUtilization.jpg\" alt=\"\" class=\"wp-image-13642\" style=\"aspect-ratio:1;width:840px;height:auto\"\/><\/figure>\n\n\n\n<p>Viens no vienk\u0101r\u0161\u0101kajiem veidiem, k\u0101 p\u0101rbaud\u012bt, vai j\u016bsu sadales centieni ir sekm\u012bgi, ir sekot l\u012bdzi komandas izmantojumam un resursu kapacit\u0101tei. Pirms iepaz\u012bstin\u0101sim j\u016bs ar da\u017e\u0101d\u0101m resursu izmanto\u0161anas metrik\u0101m un formul\u0101m, v\u0113lamies saprotam\u0101 veid\u0101 defin\u0113t resursu izmanto\u0161anu. T\u0101p\u0113c \u0161aj\u0101 rakst\u0101 - t\u0101pat k\u0101 daudzos citos - pied\u0101v\u0101jam projektu vad\u012bt\u0101ju izmantoto defin\u012bciju, noz\u012bmju un terminu sal\u012bdzin\u0101jumu.<\/p>\n\n\n\n<p>Darbinieku vai resursu izmanto\u0161anas izpratne ir saist\u012bta ar j\u0113dzieniem \"p\u0101rm\u0113r\u012bga izmanto\u0161ana\" un \"nepietiekama izmanto\u0161ana\". Abi \u0161ie j\u0113dzieni jums ir j\u0101zina. K\u0101p\u0113c? P\u0101r\u0101k daudz darba vai pien\u0101kumu projekta laik\u0101 (multitaskings) nenoz\u012bm\u0113, ka tas tiks pabeigts piln\u012bb\u0101 vai ar funkcij\u0101m, kas tiy dom\u0101ts. T\u0101tad, pirms s\u0101kam, apskatiet Gartner p\u0113t\u012bjuma secin\u0101jumus. <em>K\u0101 izvair\u012bties no IT projektu komandas p\u0101rslodzes.<\/em>Cilv\u0113ku p\u0101rslodze parasti ir negat\u012bvs efekts, kas samazina veiktsp\u0113ju un palielina k\u013c\u016bdu skaitu. Gartner p\u0113t\u012bjumi liecina, ka komandas ar zem\u0101ku noslodzi var samazin\u0101t laiku, kas nepiecie\u0161ams, lai nodro\u0161in\u0101tu biznesa v\u0113rt\u012bbu, par 30% vai vair\u0101k. To zinot, ir lietder\u012bgi sl\u0113gt un r\u016bp\u012bgi sekot l\u012bdzi resursu izmanto\u0161anas r\u0101d\u012bt\u0101jiem.<\/p>\n\n\n\n<img decoding=\"async\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/24093112\/Zrzut-ekranu-2022-04-7-o-09.41.07-1-2.png\" alt=\"Resursu veiktsp\u0113ja un projekta pan\u0101kumi ir atkar\u012bgi no komandas izmanto\u0161anas r\u0101d\u012bt\u0101jiem.\"\/>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-justify\" id=\"h-the-role-of-resource-utilization-in-project-management\"><strong>Resursu izmanto\u0161anas noz\u012bme projektu vad\u012bb\u0101<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-where-is-resource-utilization-in-the-project-management-process\">Kur projekta vad\u012bbas proces\u0101 ir resursu izmanto\u0161ana?<\/h3>\n\n\n\n<p>P\u0101rfr\u0101z\u0113jot Projektu vad\u012bbas instit\u016bta (PMI) defin\u012bciju, ar projektu vad\u012bbu saprot specifisku zin\u0101\u0161anu, kompeten\u010du, prasmju, ier\u012b\u010du, r\u012bku, programmat\u016bras, procesu un pa\u0146\u0113mienu izmanto\u0161anu, lai rad\u012btu kaut ko \"v\u0113rt\u012bgu cilv\u0113kiem\". To var viegli interpret\u0113t t\u0101, ka projektu vad\u012bba noz\u012bm\u0113 dar\u012bt lietas, izmantojot to, kas mums ir. Gar\u012bgi un fiziski.<\/p>\n\n\n\n<p>Un, ja m\u0113s grib\u0113tu b\u016bt sarkastiski, m\u0113s var\u0113tu izmantot fr\u0101zes \"v\u0113rt\u012bba cilv\u0113kiem\" daudznoz\u012bm\u012bbu un teikt, ka ierosin\u0101tais PMI projekta j\u0113dziens var noz\u012bm\u0113t ar\u012b soci\u0101l\u0101s kust\u012bbas, tostarp politiskas vai reli\u0123iskas kust\u012bbas, izveidi.<\/p>\n\n\n\n<p>Ta\u010du, sal\u012bdzinot ar iepriek\u0161 min\u0113to PMI defin\u012bciju, Projektu vad\u012bbas asoci\u0101cijas priek\u0161likumu var uzskat\u012bt par stingr\u0101ku. P\u0113d\u0113jais uzsver objekt\u012bvus un izm\u0113r\u0101mus krit\u0113rijus, piem\u0113ram, laiku un bud\u017eetu.<\/p>\n\n\n\n<p>Uz\u0146\u0113m\u0113jdarb\u012bb\u0101 abas - lai gan t\u0101s ir apsprie\u017eamas - nosaka noteiktu projekta ietvaru. Neatkar\u012bgi no t\u0101, vai runa ir par klienta uzdevumu vai par uzdevumu, ko uz\u0146\u0113muma direktors ir iesniedzis m\u0101rketinga noda\u013cai, uzdevums ir j\u0101pabeidz paredzamaj\u0101 vai, re\u0101li run\u0101jot, komerci\u0101li izdev\u012bgaj\u0101 termi\u0146\u0101 un j\u0101rada atdeve no ieguld\u012bjumiem. T\u0101tad saska\u0146\u0101 ar APM: Projekta vad\u012bba ir procesu, meto\u017eu, prasmju, zin\u0101\u0161anu un pieredzes pielieto\u0161ana, lai sasniegtu konkr\u0113tus projekta m\u0113r\u0137us saska\u0146\u0101 ar projekta pie\u0146em\u0161anas krit\u0113rijiem, iev\u0113rojot saska\u0146otos parametrus. Projekta vad\u012bbai ir gal\u012bgie rezult\u0101ti, kas ir ierobe\u017eoti ar noteiktu laika grafiku un bud\u017eetu. T\u0101tad, pret\u0113ji tikai vad\u012bbai, ja projektu vad\u012bb\u0101 run\u0101jam par projektiem, katrs no tiem ietver t\u0101das pras\u012bbas k\u0101 laiks un bud\u017eets katram projektam, kas ir j\u0101pabeidz. Da\u017ei projektu resursu piem\u0113ri (ar da\u017e\u0101m pras\u012bb\u0101m) ir par\u0101d\u012bti turpm\u0101k:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>24 m\u0113ne\u0161u laik\u0101 un ar bud\u017eetu $50 miljonu apm\u0113r\u0101 izveidot atombumbu, kuras spr\u0101dziensp\u0113ja nav maz\u0101ka par Cara bumbas spr\u0101dziensp\u0113ju.<\/p><\/li>\n\n\n\n<li><p>l\u012bdz 2025. gada 31. martam uzb\u016bv\u0113t aizsprostu uz Vislas upes, nep\u0101rsniedzot 120 miljonu ASV dol\u0101ru bud\u017eetu.<\/p><\/li>\n\n\n\n<li><p>8 ned\u0113\u013cu laik\u0101 izstr\u0101d\u0101t datora aplik\u0101ciju (ieskaitot konversijas ce\u013ca anal\u012bzi un lab\u0101k\u0101 ce\u013ca izv\u0113li) apavu ra\u017eot\u0101jam par 12 000 USD.<\/p><\/li>\n<\/ul>\n\n\n\n<p>z\u012bmola pozicion\u0113juma atjauno\u0161ana (ieskaitot jaunu BTL materi\u0101lu izplat\u012b\u0161anu) 12 m\u0113ne\u0161u laik\u0101, nep\u0101rsniedzot bud\u017eetu $100 000.<\/p>\n\n\n\n<p>\u0145emot v\u0113r\u0101 iepriek\u0161 min\u0113tos piem\u0113rus, m\u0113s varam iedom\u0101ties, cik daudz so\u013cu, administrat\u012bvo uzdevumu un proced\u016bru ir iesaist\u012bti katr\u0101 projekt\u0101. Cik daudz cilv\u0113ku - ar atbilsto\u0161\u0101m prasm\u0113m - piedal\u0101s katr\u0101 no tiem?<\/p>\n\n\n\n<p>T\u0101tad, k\u0101 min\u0113ts iepriek\u0161, projektu vad\u012bba ir procesa piem\u0113ro\u0161ana. Vai ar\u012b m\u0113s varam teikt tie\u0161i: projekts ir process. Un \u0161o procesu sauc par projektu vad\u012bbas dz\u012bves ciklu. Internet\u0101 var atrast \u0161\u012b procesa sadal\u012bjumu 3, 4, 5, 6 un 7 f\u0101z\u0113s. Bet vispopul\u0101r\u0101kais no tiem pieder jau min\u0113tajam PMI un paredz 5.<\/p>\n\n\n\n<img decoding=\"async\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2022\/05\/27140933\/5-Project-Management-Phases.png\" alt=\"Resursu izmanto\u0161ana ir da\u013ca no komandas un darbinieku veiktsp\u0113jas vad\u012bbas.\"\/>\n\n\n\n<p>K\u0101 redzat, katrs posms ir uzdevumu grupa, un katr\u0101 posm\u0101 ir daudz da\u017e\u0101du jaut\u0101jumu un probl\u0113mu. Ir v\u0113rts ar\u012b piebilst - jo \u012bpa\u0161i tiem, kas ir pa\u0161\u0101 projekta vad\u012bt\u0101ja darba s\u0101kum\u0101 -, ka \u0161\u012bs f\u0101zes ne vienm\u0113r ir j\u0101apl\u016bko hronolo\u0123iski. Da\u017eus elementus var s\u0101kt agr\u0101k, bet citi ir nep\u0101rtraukts process projekta laik\u0101 (piem\u0113ram, veiktsp\u0113jas p\u0101rvald\u012bba vai - prec\u012bz\u0101k saist\u012bb\u0101 ar \u0161\u012b raksta t\u0113mu - resursu pl\u0101no\u0161anas r\u012bka izmanto\u0161ana). Un katrs no tiem tiek kaut k\u0101d\u0101 veid\u0101 optimiz\u0113ts visa procesa laik\u0101. Resursu izl\u012bdzin\u0101\u0161ana ir svar\u012bgs pa\u0146\u0113miens, ko izmanto, lai l\u012bdzsvarotu resursu sadal\u012bjumu un izvair\u012btos no p\u0101rm\u0113r\u012bgas vai nepietiekamas resursu izmanto\u0161anas projekta dz\u012bves cikla laik\u0101.<\/p>\n\n\n\n<p>Atgrie\u017eoties pie galven\u0101s t\u0113mas, kur\u0101 PM dz\u012bves cikla procesa posm\u0101 ir svar\u012bga resursu izmanto\u0161ana?<\/p>\n\n\n\n<p>No procesa 5 f\u0101z\u0113m resursu izmanto\u0161ana ir atrodama tre\u0161aj\u0101 f\u0101z\u0113. K\u0101 da\u013ca no uzraudz\u012bbas un kontroles f\u0101zes vai, prec\u012bz\u0101k sakot, k\u0101 da\u013ca no veiktsp\u0113jas p\u0101rvald\u012bbas.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>Uzs\u0101k\u0161ana un koncepcija<\/p><\/li>\n\n\n\n<li><p>Pl\u0101no\u0161ana<\/p><\/li>\n\n\n\n<li><p>Uzs\u0101k\u0161ana un izpilde<\/p><\/li>\n\n\n\n<li><p>Uzraudz\u012bba un kontrole - <strong>t\u0101 ietver veiktsp\u0113jas p\u0101rbaudi, t. i., resursu izmanto\u0161anu.<\/strong><\/p><\/li>\n\n\n\n<li><p>Projekta sl\u0113g\u0161ana<\/p><\/li>\n<\/ul>\n\n\n\n<p>Vad\u012bt\u0101jiem resursu izmanto\u0161ana ir visv\u0113rt\u012bg\u0101k\u0101 un noder\u012bg\u0101k\u0101 metrika un KPI veiktsp\u0113jas p\u0101rvald\u012bb\u0101.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1207\" height=\"803\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/24135020\/MeasuringUtilization1.jpeg\" alt=\"\" class=\"wp-image-13644\"\/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-the-most-valuable-metrics-in-performance-management-the-resource-utilization-and-resource-allocation\">V\u0113rt\u012bg\u0101kie r\u0101d\u012bt\u0101ji veiktsp\u0113jas p\u0101rvald\u012bb\u0101 - resursu izmanto\u0161ana un resursu pie\u0161\u0137ir\u0161ana.<\/h3>\n\n\n\n<p>K\u0101 zin\u0101ms, resursu pl\u0101no\u0161ana un resursu pl\u0101no\u0161ana ir b\u016btiski, lai nodro\u0161in\u0101tu projekta pl\u0101na uzplaukumu. Resursu efekt\u012bva izmanto\u0161ana ir v\u0113l viena \u0161o m\u012bklu da\u013ca jeb, k\u0101 m\u0113s grib\u0113tu teikt, resursu p\u0101rvald\u012bba. Resursu pie\u0161\u0137ir\u0161ana attiecas uz - vienk\u0101r\u0161i izsakoties - kvalific\u0113ta resursa pie\u0161\u0137ir\u0161anu uzdevumam, savuk\u0101rt resursu izmanto\u0161ana m\u0113ra efektivit\u0101ti un laiku, ko \u0161is resurss pavad\u012bjis uztic\u0113t\u0101 uzdevuma laik\u0101 (apmaks\u0101jams vai strat\u0113\u0123isks darbs, neapmaks\u0101jamas stundas\/min\u016btes, administr\u0101cijas stundas\/min\u016btes utt.).<\/p>\n\n\n\n<img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"909\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15003849\/Zrzut-ekranu-2022-04-7-o-09.46.06-1-1280x909.png\" alt=\"\" class=\"wp-image-13525\" srcset=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15003849\/Zrzut-ekranu-2022-04-7-o-09.46.06-1-1280x909.png 1280w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15003849\/Zrzut-ekranu-2022-04-7-o-09.46.06-1-300x213.png 300w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15003849\/Zrzut-ekranu-2022-04-7-o-09.46.06-1-768x545.png 768w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15003849\/Zrzut-ekranu-2022-04-7-o-09.46.06-1-18x12.png 18w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15003849\/Zrzut-ekranu-2022-04-7-o-09.46.06-1.png 1392w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/>\n\n\n\n<p>Resursu izmanto\u0161ana ir r\u0101d\u012bt\u0101js, kas pal\u012bdz projektu vad\u012bt\u0101jiem un resursu p\u0101rvaldniekiem uzzin\u0101t, k\u0101 darbinieki pavada savu laiku projekta laik\u0101. Pateicoties \u0161\u012bm zin\u0101\u0161an\u0101m, vi\u0146i daudz efekt\u012bv\u0101k nov\u0113rt\u0113 resursu izmanto\u0161anu un pie\u0146em l\u0113mumus, kas palielina produktivit\u0101ti un rentabilit\u0101ti. Resursu izmantojums m\u0113ra katra darbinieka produktivit\u0101ti un\/vai visas komandas izmantojuma koeficienta formulu. T\u0101 uzrauga, vai j\u016bsu darbinieki ir p\u0101r\u0101k vai nepietiekami izmantoti, un nosaka darba slodzes p\u0101rvald\u012bbas politiku.<\/p>\n\n\n\n<p>Prec\u012bz\u0101k sakot, no projektu vad\u012bt\u0101ju un uz\u0146\u0113mumu viedok\u013ca apr\u0113\u0137in\u0101t resursu izmanto\u0161anas koeficientu ir termins, ko izmanto, lai aprakst\u012btu darbinieka pieejam\u0101 laika procentu\u0101lo da\u013cu, kas tiek izmantota apmaks\u0101jamiem uzdevumiem vai projektiem. Resursu izmanto\u0161anas r\u0101d\u012bt\u0101ji par\u0101da, cik liela da\u013ca j\u016bsu komandas laika tiek t\u0113r\u0113ta apmaks\u0101jamiem uzdevumiem, k\u0101 ar\u012b to, cik produkt\u012bvs ir katrs komandas loceklis. Resursu prognoz\u0113\u0161ana pal\u012bdz projektu vad\u012bt\u0101jiem prognoz\u0113t resursu vajadz\u012bbas n\u0101kotn\u0113, pamatojoties uz pa\u0161reiz\u0113jiem izmanto\u0161anas r\u0101d\u012bt\u0101jiem.<\/p>\n\n\n\n<p>Citiem v\u0101rdiem sakot, resursu izmanto\u0161ana ir r\u0101d\u012bt\u0101js, kas par\u0101da, vai visa j\u016bsu komanda vai konkr\u0113ti darbinieki ir piln\u012bb\u0101 noslogoti. Tas attiecas uz projekta pl\u0101no\u0161anas procesu un maksim\u0101lu uz\u0146\u0113mum\u0101 pieejamo resursu izmanto\u0161anu.<\/p>\n\n\n\n<p>Piem\u0113ram, ja zin\u0101t, ka k\u0101ds darbinieks jau ir p\u0101r\u0101k noslogots un vi\u0146am vienk\u0101r\u0161i ir p\u0101r\u0101k daudz darba, varat mekl\u0113t k\u0101du citu ar l\u012bdz\u012bg\u0101m prasm\u0113m, kas var\u0113tu iek\u013cauties j\u016bsu projekt\u0101. \u0160\u012b metrika pal\u012bdz ar\u012b identific\u0113t cilv\u0113kus, kuri ir nepietiekami izmantoti, lai j\u016bs var\u0113tu vi\u0146iem pie\u0161\u0137irt jaunus projektus.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1201\" height=\"793\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/24135020\/MeasuringUtilization3.jpeg\" alt=\"\" class=\"wp-image-13645\"\/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-justify\" id=\"h-how-to-calculate-resource-utilization-nbsp\"><strong>K\u0101 apr\u0113\u0137in\u0101t resursu izmanto\u0161anu?&nbsp;<\/strong><\/h2>\n\n\n\n<p>Vien\u012bgais veids, k\u0101 to noskaidrot, ir j\u0101izp\u0113ta iesp\u0113jas un j\u0101izv\u0113las j\u016bsu vajadz\u012bb\u0101m vispiem\u0113rot\u0101k\u0101. Resursu optimiz\u0101cijas metodes var pal\u012bdz\u0113t uzlabot resursu izmanto\u0161anas apr\u0113\u0137inu efektivit\u0101ti un precizit\u0101ti.<\/p>\n\n\n\n<p>Tipisk\u0101 resursu izmanto\u0161anas formula ir \u0161\u0101da:<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center\" id=\"h-resource-utilization-rate-busy-time-available-time\"><strong><em>Resursu izmanto\u0161anas koeficients = aiz\u0146emt\u012bbas laiks \/ pieejamais laiks.<\/em><\/strong><\/h3>\n\n\n\n<p>\u0160\u012b v\u0113rt\u012bba, kas izteikta procentos, par\u0101da, cik daudz laika j\u016bsu komanda pavada darb\u0101.<\/p>\n\n\n\n<p>Lai gan tas izklaus\u0101s vienk\u0101r\u0161i, ir vair\u0101ki jaut\u0101jumi, kas rodas, m\u0113\u0123inot izm\u0113r\u012bt resursu izmanto\u0161anu. Vai apr\u0113\u0137inu pamat\u0101 ir j\u0101b\u016bt faktiskajam darba laikam (<a rel=\"noopener noreferrer\" href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/darba-laika-uzskaites-parvaldiba\/\">darba laika uzskaites lapas<\/a>) vai dr\u012bz\u0101k pl\u0101notais darba laiks? K\u0101 ir ar br\u012bvdien\u0101m un <a rel=\"noopener noreferrer\" href=\"https:\/\/teamdeck.io\/lv\/vadiba\/apmaksata-atvalinajuma-politikas-izsekosana\/\">apmaks\u0101ts atva\u013cin\u0101jums<\/a>? Cik bie\u017ei jums vajadz\u0113tu sekot l\u012bdzi savas komandas resursu izmanto\u0161anas pl\u0101nam? Labi defin\u0113ta resursu sadales strat\u0113\u0123ija var b\u016btiski ietekm\u0113t j\u016bsu resursu izmanto\u0161anas koeficienta apr\u0113\u0137inu precizit\u0101ti.<\/p>\n\n\n\n<img decoding=\"async\" src=\"https:\/\/teamdeck.io\/wp-content\/uploads\/2024\/06\/Zrzut-ekranu-2022-04-6-o-09.40.24-2-2.png\" alt=\"Izveidot akt\u012bvo projektu resursu izmanto\u0161anas r\u0101d\u012bt\u0101ju, lai palielin\u0101tu produktivit\u0101tes datus.\"\/>\n\n\n\n<p>Atbilde ir \u0161\u0101da: tas ir atkar\u012bgs. Ir tik daudz main\u012bgo lielumu, ka ir praktiski neiesp\u0113jami ieteikt univers\u0101li labu risin\u0101jumu. Vien\u012bgais veids, k\u0101 to noskaidrot, ir izskat\u012bt visas iesp\u0113jas un izv\u0113l\u0113ties to, kas vislab\u0101k atbilst j\u016bsu vajadz\u012bb\u0101m.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-justify\" id=\"h-compare-bookings-with-your-team-s-availability\"><strong>Sal\u012bdziniet rezerv\u0101cijas ar savas komandas pieejam\u012bbu<\/strong><\/h2>\n\n\n\n<p>Viens no veidiem, k\u0101 nov\u0113rt\u0113t resursu jaudas izmanto\u0161anu, ir sal\u012bdzin\u0101t to pieejam\u012bbu ar pl\u0101notaj\u0101m darba stund\u0101m.<\/p>\n\n\n\n<p>Efekt\u012bva resursu pl\u0101no\u0161ana ir b\u016btiska, lai nodro\u0161in\u0101tu, ka rezerv\u0101cijas atbilst komandas pieejam\u012bbai.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center\" id=\"h-resource-utilization-planned-working-hours-bookings-available-hours\"><strong><em>Resursu izmantojums = pl\u0101not\u0101s darba stundas (rezerv\u0101cijas) \/ pieejam\u0101s stundas.<\/em><\/strong><\/h3>\n\n\n\n<img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"667\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15004029\/Zrzut-ekranu-2022-04-6-o-09.40.24-2-1280x667.png\" alt=\"\" class=\"wp-image-13528\" srcset=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15004029\/Zrzut-ekranu-2022-04-6-o-09.40.24-2-1280x667.png 1280w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15004029\/Zrzut-ekranu-2022-04-6-o-09.40.24-2-300x156.png 300w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15004029\/Zrzut-ekranu-2022-04-6-o-09.40.24-2-768x400.png 768w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15004029\/Zrzut-ekranu-2022-04-6-o-09.40.24-2-1536x800.png 1536w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15004029\/Zrzut-ekranu-2022-04-6-o-09.40.24-2-2048x1067.png 2048w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15004029\/Zrzut-ekranu-2022-04-6-o-09.40.24-2-18x9.png 18w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/>\n\n\n\n<p>\u0160\u012bs metodes galven\u0101 priek\u0161roc\u012bba ir t\u0101, ka, ja rezult\u0101ts ir p\u0101r\u0101k zems, joproj\u0101m varat optimiz\u0113t savus pl\u0101nus. Dodieties uz savu grafiku un p\u0101rliecinieties, vai j\u016bsu projekti ir pl\u0101noti pareizi. Visaptvero\u0161s resursu sadales pl\u0101ns var pal\u012bdz\u0113t nodro\u0161in\u0101t, ka visi resursi tiek efekt\u012bvi izmantoti un nepiln\u012bbas tiek samazin\u0101tas l\u012bdz minimumam. Iesp\u0113jams, da\u017eiem cilv\u0113kiem ir nepiln\u012bbas vi\u0146u rezerv\u0101cij\u0101s, vai ar\u012b jums, piem\u0113ram, divi izstr\u0101d\u0101t\u0101ji str\u0101d\u0101 4 stundas ned\u0113\u013c\u0101 pie k\u0101da projekta, lai gan pie t\u0101 var\u0113tu str\u0101d\u0101t viens cilv\u0113ks pilnu slodzi?<\/p>\n\n\n\n<p>Noskaidrojiet, k\u0101 varat aizpild\u012bt nepiln\u012bbas komandas grafik\u0101. Varb\u016bt jums vajadz\u0113tu s\u0101kt p\u0113tniec\u012bbas un izstr\u0101des projektu vai ieviest inov\u0101ciju br\u012bvlaiku? Tas ne tikai pal\u012bdz\u0113s jums izvair\u012bties no produktivit\u0101tes zuduma, bet ar\u012b ir labs veids, k\u0101 notur\u0113t cilv\u0113kus iesaist\u012btus. <a rel=\"noopener noreferrer\" href=\"https:\/\/hackernoon.com\/having-too-little-to-do-makes-people-unhappy-8afa21ea098e\">Darbinieki ir vair\u0101k neapmierin\u0101ti, nek\u0101 j\u016bs var\u0113tu iedom\u0101ties.<\/a>.<\/p>\n\n\n\n<p>Uzmanieties, ja cilv\u0113kiem ir p\u0101r\u0101k daudz darba. Past\u0101v risks, ka vi\u0146u uzdevumi netiks izpild\u012bti laikus (turkl\u0101t j\u016bs nev\u0113laties, lai vi\u0146i b\u016btu noguru\u0161i). Vi\u0146u p\u0101rslogot\u012bba var liecin\u0101t, ka jums ir nepiecie\u0161ams pie\u0146emt darb\u0101 jaunus komandas locek\u013cus.<\/p>\n\n\n\n<p>Visbeidzot, apr\u0113\u0137inot apl\u0113sto resursu izmantojumu, p\u0101rdo\u0161anas komanda var viegli uzzin\u0101t, cik daudz vietas v\u0113l ir atlicis j\u016bsu ra\u017eo\u0161anas l\u012bnij\u0101. \u0160\u0101d\u0101 veid\u0101 ir maz\u0101ka iesp\u0113jam\u012bba, ka palaid\u012bsiet gar\u0101m biznesa iesp\u0113jas (vai ap\u0146emsieties \u012bstenot projektus, kurus b\u016bt\u012bb\u0101 nesp\u0113siet \u012bstenot laik\u0101).<\/p>\n\n\n\n<p>Kopum\u0101 uz rezerv\u0101cij\u0101m balst\u012btu resursu izmanto\u0161anas r\u0101d\u012bt\u0101ju anal\u012bze pal\u012bdz optimiz\u0113t un uzlabot resursu izmanto\u0161anu un pie\u0161\u0137ir\u0161anu, k\u0101 ar\u012b prognoz\u0113t p\u0101rdo\u0161anas vai darb\u0101 pie\u0146em\u0161anas vajadz\u012bbas.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"2024\" height=\"1338\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/24142226\/ProjectOnboarding8.jpg\" alt=\"\" class=\"wp-image-13619\"\/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-justify\" id=\"h-compare-timesheets-with-your-team-s-availability\"><strong>Sal\u012bdziniet darba laika atskaites ar savas komandas pieejam\u012bbu.<\/strong><\/h2>\n\n\n\n<p>V\u0113l viens veids, k\u0101 nov\u0113rt\u0113t resursus un sasniegt optim\u0101lu to izmanto\u0161anas l\u012bmeni, ir sal\u012bdzin\u0101t komandas re\u0123istr\u0113t\u0101s stundas (darba laika uzskaites lapas) ar pieejamaj\u0101m stund\u0101m. Daudzi uzskata, ka tas ir vien\u012bgais veids, k\u0101 prec\u012bzi par\u0101d\u012bt, k\u0101 apr\u0113\u0137in\u0101t resursu izmantojumu, jo j\u016bs str\u0101d\u0101jat ar faktiskaj\u0101m darba stund\u0101m, nevis tikai apl\u0113s\u0113m. Resursu izseko\u0161ana ir b\u016btiska, lai prec\u012bzi uzraudz\u012btu un re\u0123istr\u0113tu resursu izmanto\u0161anu laika gait\u0101.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center\" id=\"h-resource-utilization-recorded-working-hours-available-hours\"><strong><em>Resursu izmantojums = re\u0123istr\u0113t\u0101s darba stundas \/ pieejam\u0101s stundas.<\/em><\/strong><\/h3>\n\n\n\n<p>Daudzi uzskata, ka tas ir vien\u012bgais veids, k\u0101 prec\u012bzi par\u0101d\u012bt, k\u0101 apr\u0113\u0137in\u0101t resursu izmantojumu, jo j\u016bs str\u0101d\u0101jat ar faktiskaj\u0101m darba stund\u0101m, nevis tikai apl\u0113s\u0113m.<\/p>\n\n\n\n<p>T\u0101 k\u0101 \u0161is ir retrospekt\u012bvs v\u0113rt\u0113jums, j\u016bs parasti nevarat nov\u0113rst kait\u0113jumu, pat ja j\u016bsu rezult\u0101ts ir neapmierino\u0161s. Tom\u0113r tas pal\u012bdz jums pie\u0146emt lab\u0101kus l\u0113mumus n\u0101kotn\u0113.<\/p>\n\n\n\n<img loading=\"lazy\" decoding=\"async\" width=\"2542\" height=\"1324\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/23223407\/MeasuringUtilization4.png\" alt=\"\" class=\"wp-image-13646\" srcset=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/23223407\/MeasuringUtilization4.png 2542w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/23223407\/MeasuringUtilization4-300x156.png 300w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/23223407\/MeasuringUtilization4-1280x667.png 1280w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/23223407\/MeasuringUtilization4-768x400.png 768w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/23223407\/MeasuringUtilization4-1536x800.png 1536w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/23223407\/MeasuringUtilization4-2048x1067.png 2048w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/23223407\/MeasuringUtilization4-18x9.png 18w\" sizes=\"auto, (max-width: 2542px) 100vw, 2542px\" \/>\n\n\n\n<p>V\u0113sturiskie dati par komandas resursu izmanto\u0161anu at\u0161\u0137iras un var b\u016bt labs r\u0101d\u012bt\u0101js tam, vai jums ir nepiecie\u0161ams pie\u0146emt darb\u0101 papildu cilv\u0113kus (vai atrast papildu uzdevumus eso\u0161ajiem komandas locek\u013ciem). Varat ar\u012b p\u0101rbaud\u012bt, cik produkt\u012bvi parasti ir j\u016bsu darbinieki.<\/p>\n\n\n\n<p>Es ieteiktu izmantot abas resursu izmanto\u0161anas apr\u0113\u0137ina metodes. Sal\u012bdziniet faktisko (re\u0123istr\u0113to) izmantojumu ar apl\u0113sto (pamatojoties uz rezerv\u0101cij\u0101m) un analiz\u0113jiet at\u0161\u0137ir\u012bbas. T\u0101s var\u0113tu nor\u0101d\u012bt uz probl\u0113m\u0101m, kas saist\u012btas ar darba slodzes apl\u0113s\u0113m vai projektu vad\u012bbas probl\u0113m\u0101m. P\u0101rbaudiet, vai ir cilv\u0113ki vai projekti, kas atk\u0101rtoti p\u0101rsniedz vai nesasniedz apl\u0113st\u0101 izmantojuma r\u0101d\u012bt\u0101ju. \u0160\u0101da anal\u012bze \u013cauj jums paman\u012bt jomas, kur\u0101s ir nepiecie\u0161ami uzlabojumi, un veikt pas\u0101kumus. Resursu izmanto\u0161anas anal\u012bze pal\u012bdz projektu vad\u012bt\u0101jiem izprast likumsakar\u012bbas un pie\u0146emt uz datiem balst\u012btus l\u0113mumus turpm\u0101kajiem projektiem.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-justify\" id=\"h-how-to-define-availability-and-why-it-s-important-for-the-results-of-resource-utilization-nbsp\"><strong>K\u0101 defin\u0113t \"pieejam\u012bbu\" un k\u0101p\u0113c t\u0101 ir svar\u012bga resursu izmanto\u0161anas rezult\u0101tiem?&nbsp;<\/strong><\/h2>\n\n\n\n<p>Tagad, kad esat iepazinu\u0161ies ar da\u017e\u0101d\u0101m resursu izmanto\u0161anas apr\u0113\u0137ina formul\u0101m, ir pien\u0101cis laiks padar\u012bt situ\u0101ciju mazliet sare\u017e\u0123\u012bt\u0101ku. L\u012bdz \u0161im m\u0113s izmantoj\u0101m terminu \"pieejam\u0101s stundas\". Bet ko tas visp\u0101r noz\u012bm\u0113? Vai par pieejam\u012bbu jums vajadz\u0113tu dom\u0101t laiku, kur\u0101 j\u016bsu darbinieks bija darb\u0101? Vai ar\u012b jums b\u016btu j\u0101iek\u013cauj ar\u012b atva\u013cin\u0101jumi un sv\u0113tku dienas?<\/p>\n\n\n\n<p>S\u0101kum\u0101 var\u0113tu dom\u0101t, ka br\u012bv\u0101 laika iek\u013cau\u0161ana kop\u0113j\u0101 pieejam\u012bb\u0101 ir pretrun\u0101 intu\u012bcijai, jo cilv\u0113ki ac\u012bmredzami nav biju\u0161i. <em>pieejams<\/em> tad. Tom\u0113r \u0146emiet v\u0113r\u0101, ka par \u0161o periodu jums joproj\u0101m var n\u0101kties izmaks\u0101t kompens\u0101ciju saviem darbiniekiem, ja str\u0101d\u0101jat ar fiks\u0113tu algu.<\/p>\n\n\n\n<p>K\u0101 darba dev\u0113js, iesp\u0113jams, v\u0113laties noskaidrot, cik daudz laika j\u016bsu komandas locek\u013ci faktiski pavada darb\u0101. Ja esat nol\u0113mis apr\u0113\u0137in\u0101 iek\u013caut br\u012bvdienas, paturiet pr\u0101t\u0101, ka atva\u013cin\u0101jumu m\u0113ne\u0161os (decembr\u012b un august\u0101) j\u016bsu komandas ide\u0101lais resursu izmanto\u0161anas l\u012bmenis var b\u016bt iev\u0113rojami zem\u0101ks. Resursu pieejam\u012bbas pl\u0101no\u0161ana pal\u012bdz nodro\u0161in\u0101t, ka jums ir pieejami vajadz\u012bgie resursi, kad tie ir nepiecie\u0161ami, pat atva\u013cin\u0101jumu maksimuma laik\u0101.<\/p>\n\n\n\n<p>Da\u017ei uz\u0146\u0113mumi izmanto 2080 stundas k\u0101 fiks\u0113tu stundu skaitu (52 ned\u0113\u013cas * 40 stundas). Citi apr\u0113\u0137ina faktisko pieejamo darba stundu skaitu attiec\u012bgaj\u0101 gad\u0101. Ja v\u0113laties veikt padzi\u013cin\u0101tu filtr\u0113\u0161anu (piem\u0113ram, iek\u013caut atva\u013cin\u0101juma stundas, neiek\u013caut sv\u0113tku dienas, \u0146emt v\u0113r\u0101 <a rel=\"noopener noreferrer\" href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/nepilna-darba-laika-darbinieku-parvaldiba\/\">nepilnas slodzes darbinieki<\/a>), jums vajadz\u0113tu apsv\u0113rt iesp\u0113ju izmantot resursu p\u0101rvald\u012bbas programmat\u016bru.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-justify\" id=\"h-productive-utilization-and-billable-resource-utilization\"><strong>Produkt\u012bvs izmantojums un r\u0113\u0137in\u0101 nor\u0101d\u012bto resursu izmantojums<\/strong><\/h2>\n\n\n\n<p>Kad ir gatava \"pieejamo stundu\" defin\u012bcija, jums j\u0101apsver, ko j\u016bs saucat par \"darba stund\u0101m\". Vai j\u016bs run\u0101jat par vis\u0101m stund\u0101m, ko j\u016bsu darbinieki pavada, veicot ar darbu saist\u012btas darb\u012bbas, piem\u0113ram, veidojot iek\u0161\u0113jo projektu? Vai varb\u016bt stundas, ko vi\u0146i pavada, str\u0101d\u0101jot pie liet\u0101m, par kur\u0101m j\u016bs varat iekas\u0113t maksu no saviem klientiem.<\/p>\n\n\n\n<p>Varat apr\u0113\u0137in\u0101t t\u0101 saukto \"produkt\u012bvo izmantojumu\", kur\u0101 \u0146emtas v\u0113r\u0101 visas aiz\u0146emt\u0101s stundas, un \"r\u0113\u0137in\u0101mo izmantojumu\". Otrais r\u0101d\u012bt\u0101js ir \u012bpa\u0161i v\u0113rt\u012bgs a\u0123ent\u016br\u0101m, konsult\u0101ciju uz\u0146\u0113mumiem vai programmat\u016bras uz\u0146\u0113mumiem - uz\u0146\u0113mumiem, kas str\u0101d\u0101 pie projektiem saviem klientiem. Izmantojot izmantojumu, par kuru var sa\u0146emt r\u0113\u0137inus, j\u016bs varat nov\u0113rt\u0113t, cik daudz laika j\u016bsu darbinieki velta darbam, par kuru faktiski sa\u0146em atl\u012bdz\u012bbu. Resursu tarifik\u0101cija ir \u013coti svar\u012bga, lai izsekotu un p\u0101rvald\u012btu apmaks\u0101jamo stundu skaitu klientu projektos.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-justify\" id=\"h-measure-resource-utilization-in-real-time\"><strong>Re\u0101llaika resursu izmanto\u0161anas m\u0113r\u012b\u0161ana<\/strong><\/h2>\n\n\n\n<p>Iesp\u0113jams, esat izstr\u0101d\u0101jis formulu, ko izmantosiet, lai nov\u0113rt\u0113tu resursu pieejam\u012bbu un izmantojumu, ta\u010du jums ir j\u0101\u0146em v\u0113r\u0101 past\u0101v\u012bgi main\u012bgie dati. Cilv\u0113ku turpm\u0101k\u0101 pieejam\u012bba main\u0101s katru reizi, kad vi\u0146i pieprasa br\u012bvu dienu vai saslimst, un tas ietekm\u0113 ar\u012b j\u016bsu rezerv\u0101cijas.<\/p>\n\n\n\n<p>Ir pamats dom\u0101t, ka j\u016bsu dati ir regul\u0101ri j\u0101atjaunina un komandas izmanto\u0161anas r\u0101d\u012bt\u0101js ir j\u0101piel\u0101go ar\u012b re\u0101laj\u0101 laik\u0101. Visvienk\u0101r\u0161\u0101kais veids, k\u0101 tam sekot l\u012bdzi, b\u016btu izmantot resursu p\u0101rvald\u012bbas programmat\u016bru. Re\u0101l\u0101 laika resursu p\u0101rvald\u012bba \u013cauj dinamiski kori\u0123\u0113t resursu sadal\u012bjumu, pamatojoties uz aktu\u0101lajiem datiem. M\u0113s esam izveidoju\u0161i Teamdeck k\u0101 resursu p\u0101rvald\u012bbas r\u012bku, kas var automatiz\u0113t j\u016bsu centienus, lai j\u016bs var\u0113tu koncentr\u0113ties uz j\u016bsu <a rel=\"noopener noreferrer\" href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/projekta-vaditajs-vs-resursu-vaditajs\/\">projektu vad\u012bbas pien\u0101kumi.<\/a><\/p>\n\n\n\n<img decoding=\"async\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/15175323\/team_utilization.png\" alt=\"Re\u0101llaika izmanto\u0161anas p\u0101rskati resursu p\u0101rvaldniekiem\"\/>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-justify\" id=\"h-how-does-the-resource-management-software-help-with-resource-utilization\"><strong>K\u0101 resursu p\u0101rvald\u012bbas programmat\u016bra pal\u012bdz izmantot resursus?<\/strong><\/h2>\n\n\n\n<p>Teamdeck apr\u0113\u0137iniem izmanto tr\u012bs veidu datu punktus:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>pieejam\u012bba (k\u0101 ar\u012b br\u012bvdienas vai sv\u0113tku dienas),<\/p><\/li>\n\n\n\n<li><p>rezerv\u0101cijas (pl\u0101not\u0101s darba stundas),<\/p><\/li>\n\n\n\n<li><p>darba laika uzskaites lapas (re\u0123istr\u0113t\u0101s darba stundas).<\/p><\/li>\n<\/ul>\n\n\n\n<img decoding=\"async\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/15175244\/measure_resource_utilization.png\" alt=\"Resursu izmanto\u0161anas izseko\u0161ana ar Teamdeck\"\/>\n\n\n\n<p>\u0160\u0101d\u0101 veid\u0101 varat apr\u0113\u0137in\u0101t apl\u0113sto un faktisko komandas izmantojumu un p\u0113c tam tos sal\u012bdzin\u0101t. \u0160\u012b programmat\u016bra ir apr\u012bkota ar p\u0101rskatu paketi, kas \u013cauj vizualiz\u0113t datus un kop\u012bgot tos ar atsevi\u0161\u0137iem komandas locek\u013ciem (vai klientu). Resursu p\u0101rvald\u012bbas r\u012bki nodro\u0161ina visaptvero\u0161as funkcijas resursu izmanto\u0161anas izseko\u0161anai, anal\u012bzei un optimiz\u0101cijai.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-center\" id=\"h-looking-for-software-that-helps-with-resource-utilization\"><strong>Vai mekl\u0113jat programmat\u016bru, kas pal\u012bdz izmantot resursus?<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center\" id=\"h-effective-resource-utilization-thanks-to-teamdeck-io\">Efekt\u012bva resursu izmanto\u0161ana, pateicoties Teamdeck.io<\/h3>","protected":false},"excerpt":{"rendered":"Uz\u0146\u0113mumi parasti iegulda daudz p\u016b\u013cu resursu sadal\u0113. J\u016bs v\u0113laties, lai visi b\u016btu aiz\u0146emti, vienlaikus nodro\u0161inot, ka vi\u0146u uzdevumi uz\u0146\u0113mumam ir v\u0113rt\u012bgi (kas bie\u017ei vien noz\u012bm\u0113, ka par tiem var sa\u0146emt samaksu). Tas k\u013c\u016bst patie\u0161\u0101m sare\u017e\u0123\u012bti, jo j\u016bsu komanda...","protected":false},"author":6,"featured_media":8529,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22,39],"tags":[47],"class_list":["post-3892","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management","category-teamdeck","tag-resource-utilization"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v23.8 (Yoast SEO v24.3) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Resource Utilization - How Project Managers Measure It?<\/title>\n<meta name=\"description\" content=\"How do you know if you\u2019ve allocated resources at your organization successfully? Here are some ideas to help you measure resource utilization.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/ka-izmerit-resursu-izmantosanu\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to Measure Resource Utilization? - Teamdeck.io\" \/>\n<meta property=\"og:description\" content=\"How do you know if you\u2019ve allocated resources at your organization successfully? Here are some ideas to help you measure resource utilization.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/ka-izmerit-resursu-izmantosanu\/\" \/>\n<meta property=\"og:site_name\" content=\"Teamdeck\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/helloteamdeck\" \/>\n<meta property=\"article:published_time\" content=\"2024-06-24T07:31:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-01-23T20:35:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/15175122\/how-to-measure-resource-utilization.png\" \/>\n<meta name=\"author\" content=\"Ania Kitowska\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"How to Measure Resource Utilization? - Teamdeck.io\" \/>\n<meta name=\"twitter:description\" content=\"How do you know if you\u2019ve allocated resources at your organization successfully? Here are some ideas to help you measure resource utilization.\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/15175122\/how-to-measure-resource-utilization.png\" \/>\n<meta name=\"twitter:creator\" content=\"@helloteamdeck\" \/>\n<meta name=\"twitter:site\" content=\"@helloteamdeck\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ania Kitowska\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/\",\"url\":\"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/\",\"name\":\"Resource Utilization - How Project Managers Measure It?\",\"isPartOf\":{\"@id\":\"https:\/\/teamdeck.io\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/17161903\/How-to-Measure-Resource-Utilization-1.jpeg\",\"datePublished\":\"2024-06-24T07:31:34+00:00\",\"dateModified\":\"2025-01-23T20:35:33+00:00\",\"author\":{\"@id\":\"https:\/\/teamdeck.io\/#\/schema\/person\/38139dc474576295e51cfae1580d697e\"},\"description\":\"How do you know if you\u2019ve allocated resources at your organization successfully? Here are some ideas to help you measure resource utilization.\",\"breadcrumb\":{\"@id\":\"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#breadcrumb\"},\"inLanguage\":\"lv\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lv\",\"@id\":\"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#primaryimage\",\"url\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/17161903\/How-to-Measure-Resource-Utilization-1.jpeg\",\"contentUrl\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/17161903\/How-to-Measure-Resource-Utilization-1.jpeg\",\"width\":1469,\"height\":981,\"caption\":\"Helping project managers to calculate resource utilization\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/teamdeck.io\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to Calculate Resource Utilization: A Guide for Project Managers\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/teamdeck.io\/#website\",\"url\":\"https:\/\/teamdeck.io\/\",\"name\":\"Teamdeck\",\"description\":\"resource scheduling + time tracking + leave management\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/teamdeck.io\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/teamdeck.io\/#\/schema\/person\/38139dc474576295e51cfae1580d697e\",\"name\":\"Ania Kitowska\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv\",\"@id\":\"https:\/\/teamdeck.io\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113607\/aniaprofil%C3%B3wka-150x150.jpg\",\"contentUrl\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113607\/aniaprofil%C3%B3wka-150x150.jpg\",\"caption\":\"Ania Kitowska\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Resource Utilization - How Project Managers Measure It?","description":"How do you know if you\u2019ve allocated resources at your organization successfully? Here are some ideas to help you measure resource utilization.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/ka-izmerit-resursu-izmantosanu\/","og_locale":"lv_LV","og_type":"article","og_title":"How to Measure Resource Utilization? - Teamdeck.io","og_description":"How do you know if you\u2019ve allocated resources at your organization successfully? Here are some ideas to help you measure resource utilization.","og_url":"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/ka-izmerit-resursu-izmantosanu\/","og_site_name":"Teamdeck","article_publisher":"https:\/\/www.facebook.com\/helloteamdeck","article_published_time":"2024-06-24T07:31:34+00:00","article_modified_time":"2025-01-23T20:35:33+00:00","og_image":[{"url":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/15175122\/how-to-measure-resource-utilization.png","type":"","width":"","height":""}],"author":"Ania Kitowska","twitter_card":"summary_large_image","twitter_title":"How to Measure Resource Utilization? - Teamdeck.io","twitter_description":"How do you know if you\u2019ve allocated resources at your organization successfully? Here are some ideas to help you measure resource utilization.","twitter_image":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/15175122\/how-to-measure-resource-utilization.png","twitter_creator":"@helloteamdeck","twitter_site":"@helloteamdeck","twitter_misc":{"Written by":"Ania Kitowska","Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/","url":"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/","name":"Resource Utilization - How Project Managers Measure It?","isPartOf":{"@id":"https:\/\/teamdeck.io\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#primaryimage"},"image":{"@id":"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#primaryimage"},"thumbnailUrl":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/17161903\/How-to-Measure-Resource-Utilization-1.jpeg","datePublished":"2024-06-24T07:31:34+00:00","dateModified":"2025-01-23T20:35:33+00:00","author":{"@id":"https:\/\/teamdeck.io\/#\/schema\/person\/38139dc474576295e51cfae1580d697e"},"description":"How do you know if you\u2019ve allocated resources at your organization successfully? Here are some ideas to help you measure resource utilization.","breadcrumb":{"@id":"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#breadcrumb"},"inLanguage":"lv","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/"]}]},{"@type":"ImageObject","inLanguage":"lv","@id":"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#primaryimage","url":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/17161903\/How-to-Measure-Resource-Utilization-1.jpeg","contentUrl":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/17161903\/How-to-Measure-Resource-Utilization-1.jpeg","width":1469,"height":981,"caption":"Helping project managers to calculate resource utilization"},{"@type":"BreadcrumbList","@id":"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/teamdeck.io\/"},{"@type":"ListItem","position":2,"name":"How to Calculate Resource Utilization: A Guide for Project Managers"}]},{"@type":"WebSite","@id":"https:\/\/teamdeck.io\/#website","url":"https:\/\/teamdeck.io\/","name":"Teamdeck","description":"resource scheduling + time tracking + leave management","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teamdeck.io\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv"},{"@type":"Person","@id":"https:\/\/teamdeck.io\/#\/schema\/person\/38139dc474576295e51cfae1580d697e","name":"Ania Kitowska","image":{"@type":"ImageObject","inLanguage":"lv","@id":"https:\/\/teamdeck.io\/#\/schema\/person\/image\/","url":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113607\/aniaprofil%C3%B3wka-150x150.jpg","contentUrl":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113607\/aniaprofil%C3%B3wka-150x150.jpg","caption":"Ania Kitowska"}}]}},"_links":{"self":[{"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/posts\/3892","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/comments?post=3892"}],"version-history":[{"count":69,"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/posts\/3892\/revisions"}],"predecessor-version":[{"id":13647,"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/posts\/3892\/revisions\/13647"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/media\/8529"}],"wp:attachment":[{"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/media?parent=3892"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/categories?post=3892"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/tags?post=3892"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}