{"id":2813,"date":"2017-04-06T09:32:21","date_gmt":"2017-04-06T07:32:21","guid":{"rendered":"https:\/\/teamdeck.io\/?p=2813"},"modified":"2023-10-15T19:12:36","modified_gmt":"2023-10-15T17:12:36","slug":"project-managers-time-tracking-guide","status":"publish","type":"post","link":"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/projektu-vaditaju-laika-uzskaites-rokasgramata\/","title":{"rendered":"Projektu vad\u012bbas laika izseko\u0161ana: Projekta vad\u012bt\u0101ja ce\u013cvedis"},"content":{"rendered":"<div class=\"yoast-breadcrumbs\"><span><span><a href=\"https:\/\/teamdeck.io\/lv\/\">S\u0101kums<\/a><\/span> \" <span class=\"breadcrumb_last\" aria-current=\"page\">Projektu vad\u012bbas laika izseko\u0161ana: Projekta vad\u012bt\u0101ja ce\u013cvedis<\/span><\/span><\/div>\n\n\n<p><strong>Saist\u012bba starp projektu vad\u012bbu un laika uzskaiti (vai <a href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/laika-vadibas-strategijas\/\" target=\"_blank\" rel=\"noopener\">projekta laika vad\u012bba<\/a>) da\u017eiem cilv\u0113kiem nav nepiecie\u0161ams nek\u0101ds skaidrojums. Ikreiz, kad vi\u0146i dom\u0101 par \"projektu\", vi\u0146i redz \"laiku\" vai \"laika uzskaiti\". \u0160is raksts ir cit\u0101ds. <\/strong><\/p>\n\n\n\n<p>No jaut\u0101juma \"K\u0101p\u0113c man to dar\u012bt?\" l\u012bdz jaut\u0101jumam \"Labi, k\u0101 man s\u0101kt?\" \u0160is laika uzskaites ce\u013cvedis par\u0101d\u012bs jums \u0161\u012b procesa priek\u0161roc\u012bbas un pareizo veidu, k\u0101 to dar\u012bt. P\u0113d\u0113j\u0101 da\u013ca ir \u012bpa\u0161i svar\u012bga, jo nepareizi \u012bstenota laika uzskaite var novest j\u016bsu darbiniekus pie p\u0101rslodzes un paties\u012bb\u0101 pat ne mazliet paaugstin\u0101t darba ra\u017e\u012bgumu.<\/p>\n\n\n\n<p><strong>Ko j\u016bs sa\u0146emsiet ar \u0161o rakstu:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>K\u0101 izsekot projekta progresam un projekta resursiem<\/li><li>To uz\u0146\u0113mumu nosaukumi, kas izmanto projektu vad\u012bbas laika uzskaites r\u012bkus, lai sekotu projektu laika uzskaitei (apak\u0161\u0101)<\/li><li>Projektu un projektu loma un noz\u012bme <a href=\"https:\/\/teamdeck.io\/lv\/instrumentu-kaste\/ka-izveleties-darbinieku-darba-laika-uzskaites-programmaturu\/\" target=\"_blank\" rel=\"noopener\">darbinieku laika uzskaites programmat\u016bra<\/a> projekta pl\u0101no\u0161anas proces\u0101<\/li><\/ul>\n\n\n\n<figure class=\"wp-block-image alignnone size-full wp-image-11267 is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"1999\" height=\"1154\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2022\/05\/09115329\/timesheets_1_add_timesheet.jpg\" alt=\"\" class=\"wp-image-10482\"\/><figcaption>Run\u0101jot par projektu vad\u012bbu, laika uzskaite ir neaizst\u0101jama t\u0101s sast\u0101vda\u013ca. Periods. [Ekr\u0101ns no resursu p\u0101rvald\u012bbas programmat\u016bras]<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">K\u0101p\u0113c<\/h2>\n\n\n\n<div class=\"wp-block-image is-style-default\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/media.giphy.com\/media\/l2JhtKtDWYNKdRpoA\/giphy.gif\" alt=\"Projekta laika uzskaites programmat\u016bras r\u012bki pal\u012bdz apr\u0113\u0137in\u0101t faktisko progresu un so\u013cus l\u012bdz projekta pabeig\u0161anai.\"\/><\/figure><\/div>\n\n\n\n<p>Ja t\u012bmek\u013ca un programmat\u016bras izstr\u0101des komandas, neizmantojot laika uzskaiti, katru gadu vid\u0113ji zaud\u0113 vair\u0101k nek\u0101 $18 000 - tas vien ir diezgan p\u0101rliecino\u0161s pier\u0101d\u012bjums. Turkl\u0101t visi programmat\u016bras izstr\u0101des proces\u0101 iesaist\u012btie cilv\u0113ki var g\u016bt labumu no laika uzskaites:<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Izpilddirektors un finanses<\/h2>\n\n\n\n<p>Laika izseko\u0161ana noz\u012bm\u0113, ka vi\u0146iem ir liel\u0101ka kontrole p\u0101r savu komandu efektivit\u0101ti, kas savuk\u0101rt pal\u012bdz nov\u0113rt\u0113t \"izdeg\u0161anas\" r\u0101d\u012bt\u0101jus un attiec\u012bgi pie\u0146emt strat\u0113\u0123iskus l\u0113mumus par uzs\u0101ktajiem projektiem.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Izstr\u0101d\u0101t\u0101ji<\/h2>\n\n\n\n<p>Daudzi, jaut\u0101ti par IT darba laika uzskaites pamatojumu, var koncentr\u0113ties uz produktivit\u0101tes aspektu. Galu gal\u0101 pulkste\u0146a r\u0101d\u012bt\u0101ji liek vairumam no mums koncentr\u0113ties uz veicamajiem uzdevumiem. Tom\u0113r galvenais iemesls laika uzskaitei ir att\u012bst\u012bbas veicin\u0101\u0161ana.<\/p>\n\n\n\n<div class=\"wp-block-image wp-image-11268 size-full is-style-default\"><figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1289\" height=\"587\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2022\/03\/09143301\/booking_1_manage_work_schedule-1.jpg\" alt=\"\" class=\"wp-image-9606\"\/><figcaption>Pl\u0101no\u0161ana, pamatojoties uz prasm\u0113m, IT nozares piem\u0113r\u0101<\/figcaption><\/figure><\/div>\n\n\n\n<p>Uzdevumu izpildes tempa uzskaite pal\u012bdz nor\u0101d\u012bt, vai k\u0101dai no vi\u0146u prasm\u0113m ir nepiecie\u0161ams papildu darbs; l\u012bdz ar to ir viegl\u0101k nov\u0113rst prasmju tr\u016bkumus, pirms tie k\u013c\u016bst par re\u0101lu probl\u0113mu un nopietni ietekm\u0113 komandas darba \u0101trumu. Turkl\u0101t laika uzskaite \u013cauj izstr\u0101d\u0101t\u0101jiem sal\u012bdzin\u0101t savas apl\u0113ses ar faktisko darba laiku. Rezult\u0101t\u0101 vi\u0146i lab\u0101k nov\u0113rt\u0113 savu darba slodzi.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Kvalit\u0101tes nodro\u0161in\u0101\u0161ana<\/h2>\n\n\n\n<p>Laika izseko\u0161ana pal\u012bdz noteikt p\u0101rbau\u017eu bie\u017eumu un padar\u012bt prec\u012bz\u0101kas n\u0101kotnes prognozes.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Klienti<\/h2>\n\n\n\n<p>Laika uzskaite un projekta progresa izseko\u0161ana pier\u0101da klientam, ka vi\u0146\u0161 sa\u0146em savu naudu. Ja tiek veikta projekta laika uzskaite, klienti pa\u0161i var redz\u0113t, cik daudz laika ir nepiecie\u0161ams, lai sasniegtu noteikto m\u0113r\u0137i. <a href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/ka-noteikt-projekta-atskaites-punktus\/\" target=\"_blank\" rel=\"noopener\">projekta atskaites punkti<\/a>- t\u0101d\u0113j\u0101di vi\u0146i prec\u012bzi zina, par ko tiek iekas\u0113ta maksa.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Projektu vad\u012bt\u0101ji<\/h2>\n\n\n\n<p>Visbeidzot, j\u016bs, Projekts un <a href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/projekta-vaditajs-vs-resursu-vaditajs\/\" target=\"_blank\" rel=\"noopener\">Resursu p\u0101rvaldnieki<\/a>: izmantojot projektu laika noteic\u0113jus, j\u016bs varat sekot l\u012bdzi <a href=\"https:\/\/teamdeck.io\/lv\/teamdeck\/novertet-komandas-sniegumu\/\">komandas sniegums<\/a> un atvieglo turpm\u0101ko iter\u0101ciju nov\u0113rt\u0113\u0161anu, jo sniedz v\u0113sturiskus datus par to iepriek\u0161\u0113jo darb\u012bbu.<\/p>\n\n\n\n<p><span data-creator-ids=\"ff671b5ad837\">Ne visas darba stundas ir vien\u0101das<\/span>- vai vismaz t\u0101 var\u0113tu \u0161\u0137ist. Lai gan apmaks\u0101jamo stundu v\u0113rt\u012bba (t\u0101s ietver faktiskos uzdevumus, tik\u0161an\u0101s un zvanus) ir diezgan pa\u0161saprotama, ir daudz gr\u016bt\u0101k uzskait\u012bt neapr\u0113\u0137in\u0101m\u0101s stundas, un da\u017ek\u0101rt t\u0101s var veidot b\u016btisku darba da\u013cu.<\/p>\n\n\n\n<div class=\"wp-block-image is-style-default\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/media.giphy.com\/media\/kGs93tRMsf2d6GCVRJ\/giphy.gif\" alt=\"Laika uzskaites r\u012bks vai laika uzskaites lietotne - t\u0101 neaizst\u0101s laika vad\u012bbas prasmes.\"\/><\/figure><\/div>\n\n\n\n<p>Piem\u0113ram, vai jums vajadz\u0113tu klientam izrakst\u012bt r\u0113\u0137inu par stund\u0101m, ko j\u016bsu izstr\u0101d\u0101t\u0101ji pavad\u012bju\u0161i, apg\u016bstot projektam nepiecie\u0161amo jauno tehnolo\u0123iju?<\/p>\n\n\n\n<p>No vienas puses, tas bija b\u016btiski \u0161im projektam; no otras puses, past\u0101v iesp\u0113ja, ka tas ir ieguld\u012bjums, kas b\u016bs noder\u012bgs n\u0101kotn\u0113, t\u0101p\u0113c iekas\u0113t no ikviena 100% par to, ka izstr\u0101d\u0101t\u0101js apg\u016bst jaunas prasmes, var\u0113tu uzskat\u012bt par vienk\u0101r\u0161i negod\u012bgu.<\/p>\n\n\n\n<p>V\u0113l viens gad\u012bjums ir tad, ja j\u016bsu komandai pirms projekta uzs\u0101k\u0161anas ir j\u0101izp\u0113ta piln\u012bgi jauna tehnolo\u0123ija. Piem\u0113ram, j\u016bsu komandai var n\u0101kties izp\u0113t\u012bt inovat\u012bvu tehnolo\u0123iju kombin\u0101ciju, no kuras ir atkar\u012bgs projekta izn\u0101kums: nav zin\u0101ms, vai \u0161\u012b kombin\u0101cija darbosies, t\u0101p\u0113c klientam ir j\u0101izlemj, vai vi\u0146\u0161 ir gatavs \u012bstenot ideju, kas var izr\u0101d\u012bties piln\u012bgs izg\u0101\u0161an\u0101s.<\/p>\n\n\n\n<p>Jums vienm\u0113r iepriek\u0161 j\u0101apsprie\u017e \u0161\u0101di jaut\u0101jumi ar klientu gan laika grafika, gan izmaksu d\u0113\u013c. Ja j\u016bsu uz\u0146\u0113mums izmanto laika uzskaiti, tas var uzraudz\u012bt apmaks\u0101jamo\/neapmaks\u0101jamo stundu attiec\u012bbu un noteikt vid\u0113jo pakalpojumu tarifu.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">K\u0101<\/h2>\n\n\n\n<div class=\"wp-block-image is-style-default\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/media.giphy.com\/media\/kQOxxwjjuTB7O\/giphy.gif\" alt=\"Projektu laika uzskaites programmat\u016bra vai risin\u0101jumi ar laika uzskaites funkciju ar\u012b neaizst\u0101s PM kvalifik\u0101ciju.\"\/><\/figure><\/div>\n\n\n\n<p>Nav iesp\u0113jams izvair\u012bties no t\u0101, ka laika uzskaite pati par sevi prasa laiku un p\u016bles, lai gan ievad\u012btu jaunus lietot\u0101jus, gan p\u0101rliecin\u0101tos, ka vi\u0146i patie\u0161\u0101m izmanto uzskaites programmat\u016bru. Tom\u0113r, t\u0101 k\u0101 vair\u0101k nek\u0101 38% potenci\u0101lo r\u0113\u0137in\u0101mo ie\u0146\u0113mumu tiek zaud\u0113ti t\u0101p\u0113c, ka netiek izsekots laiks, kas pavad\u012bts e-past\u0101 un san\u0101ksm\u0113s, un kav\u0113jas darba laika uzskaites lapu aizpild\u012b\u0161ana, \u0161\u012b sp\u0113le noteikti ir t\u0101 v\u0113rta, lai to paveiktu. Iev\u0113rojot \u0161os 6 noteikumus, iepaz\u012bstinot IT komandu ar laika uzskaiti, tie ne tikai atvieglos ievie\u0161anu, bet ar\u012b veicin\u0101s efekt\u012bv\u0101ku procesu:<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">1. Izv\u0113lieties <a href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/labaka-darbinieku-laika-izsekosanas-programmatura\/\" target=\"_blank\" rel=\"noopener\">lab\u0101k\u0101 darbinieku laika izseko\u0161anas programmat\u016bra<\/a><\/h2>\n\n\n\n<p>P\u0101rliecinieties, ka j\u016bsu izmantotais laika izseko\u0161anas l\u012bdzeklis atbilst j\u016bsu uz\u0146\u0113muma vajadz\u012bb\u0101m. Ac\u012bmredzam\u0101kie faktori, kas j\u0101\u0146em v\u0113r\u0101, ir uz\u0146\u0113muma lielums un jau izmantotie r\u012bki. Ja uz\u0146\u0113mums strauji aug, jums ir nepiecie\u0161ams r\u012bks, kas var palielin\u0101ties l\u012bdz ar to. T\u0101pat, ja noteikti r\u012bki jau ir ieviesti, izmantojiet programmat\u016bru, kas var k\u013c\u016bt par neat\u0146emamu sist\u0113mas sast\u0101vda\u013cu.&nbsp;<\/p>\n\n\n\n<div class=\"wp-block-image is-style-default\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/teamdeck.io\/wp-content\/uploads\/2017\/04\/timesheets_6_simplify-forecasting.jpg\" alt=\"\" class=\"wp-image-11269\"\/><\/figure><\/div>\n\n\n\n<p>Vai ar\u012b padom\u0101jiet, vai jums b\u016btu lietder\u012bgi izv\u0113l\u0113ties darbinieku laika uzskaites programmat\u016bru, ko var izmantot citiem ar darbiniekiem saist\u012btiem m\u0113r\u0137iem: resursu pl\u0101no\u0161anai vai pieejam\u012bbai \/. <a href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/ka-izveleties-tiessaistes-atvalinajumu-parvaldibas-sistemu\/\">atva\u013cin\u0101jumu p\u0101rvald\u012bba<\/a> (Apptension, programmat\u016bras m\u0101j\u0101, kur\u0101 es str\u0101d\u0101ju, m\u0113s izstr\u0101d\u0101j\u0101m lietotni, lai r\u016bp\u0113tos par visiem \u0161iem jaut\u0101jumiem.) <a href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/projektu-resursu-parvaldibas-rokasgramata\/\">projekta resursu p\u0101rvald\u012bba<\/a>-Uzdevumi, tostarp laika uzskaite).<\/p>\n\n\n\n<p>Galvenais: p\u0101rliecinieties, ka tas tiek pareizi izmantots un nek\u013c\u016bst par v\u0113l vienu \"plaukta\" priek\u0161metu. Ja jums ir nepiecie\u0161ams arguments pret programmat\u016bras iz\u0161\u0137\u0113rd\u0113\u0161anu, \u0146emiet v\u0113r\u0101 \u0161\u0101du inform\u0101ciju: vair\u0101k nek\u0101 4 no 5 mazajiem un vid\u0113jiem uz\u0146\u0113mumiem Apvienotaj\u0101 Karalist\u0113 neizmanto programmat\u016bru, par kuru maks\u0101, un 4 gadu p\u0113t\u012bjuma laik\u0101 kopum\u0101 izt\u0113r\u0113ti vair\u0101k nek\u0101 5,7 miljardi m\u0101rci\u0146u.<\/p>\n\n\n\n<div class=\"wp-block-image is-style-default\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/media.giphy.com\/media\/VGRxlUu8sC6aGUY50u\/giphy.gif\" alt=\"Laika uzskaites risin\u0101jums atrisina daudzas probl\u0113mas ar prec\u012bzu laika uzskaites m\u0113r\u012b\u0161anu.\"\/><\/figure><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">2. Vienm\u0113r paskaidrojiet, k\u0101p\u0113c<\/h2>\n\n\n\n<p>Nevienu dienu vienk\u0101r\u0161i nesav\u0101ciet savus komandas biedrus telp\u0101 un nesakiet: \"No \u0161\u012b br\u012b\u017ea m\u0113s izmantosim \u0161o IT laika uzskaites programmat\u016bru, lai redz\u0113tu, k\u0101 jums veicas darbs. Noklik\u0161\u0137iniet \u0161eit, tagad noklik\u0161\u0137iniet tur, ide\u0101li, paldies, san\u0101ksme ir beigusies.\" Tas ir, ja vien nev\u0113laties katru reizi, kad dodaties uz virtuvi, sastapties ar grupi\u0146u aprun\u0101t\u0101ju. Cilv\u0113ki v\u0113las, lai pret vi\u0146iem izturas god\u012bgi: ja ievie\u0161at k\u0101das izmai\u0146as, paskaidrojiet to pamatojumu. (Pret\u0113j\u0101 gad\u012bjum\u0101 vi\u0146i vienk\u0101r\u0161i izdom\u0101s pa\u0161i, un past\u0101v iesp\u0113ja, ka jums vi\u0146u versija nepatiks.)<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">3. Koncentr\u0113jieties uz procesu, nevis produktu<\/h2>\n\n\n\n<p>Paskaidrojot, k\u0101p\u0113c v\u0113laties sekot l\u012bdzi tam, cik daudz laika j\u016bsu komandas locek\u013ci pavada, veicot noteiktus uzdevumus, koncentr\u0113jieties uz pa\u0161nov\u0113rt\u0113jumu un past\u0101v\u012bgu att\u012bst\u012bbu, nevis uz skait\u013ciem. Galu gal\u0101 tam vajadz\u0113tu b\u016bt galvenajam iemeslam, k\u0101d\u0113\u013c tiek veikta laika uzskaite: k\u013c\u016bt lab\u0101kam sav\u0101 darb\u0101. Ja j\u016bs veicin\u0101siet m\u0101c\u012b\u0161an\u0101s kult\u016bru, tad efektivit\u0101tes uzlabo\u0161an\u0101s b\u016bs k\u0101 iev\u0113rojams papildu bonuss.<\/p>\n\n\n\n<div class=\"wp-block-image is-style-default\"><figure class=\"aligncenter\"><img decoding=\"async\" src=\"https:\/\/media.giphy.com\/media\/MIY4jpusckRmU\/giphy.gif\" alt=\"Laika uzskaites dati ir balst\u012bti uz laika ierakstiem un sl\u0113pto projektu vad\u012bbas programmat\u016bru.\"\/><\/figure><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">4. Sekojiet l\u012bdzi tam, k\u0101 cilv\u0113ki izmanto savus izsekot\u0101jus<\/h2>\n\n\n\n<p>Ja esat projektu vad\u012bt\u0101js, jums ir j\u0101b\u016bt ieskatam savu izstr\u0101d\u0101t\u0101ju izseko\u0161an\u0101. Katru piecu dienas min\u016b\u0161u uzskaite ir nepr\u0101t\u012bga, bet, ja k\u0101ds past\u0101v\u012bgi atst\u0101j iesl\u0113gtu savu izsekot\u0101ju pie viena uzdevuma, bet jau ir p\u0101rg\u0101jis pie cita, vai ar\u012b vienlaic\u012bgi tur vair\u0101kus izsekot\u0101jus, noteikti v\u0113laties ar \u0161o cilv\u0113ku aprun\u0101ties.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">5. Atg\u0101diniet cilv\u0113kiem sekot l\u012bdzi savam laikam (daudz).<\/h2>\n\n\n\n<p>Laika uzskaite ir ieradums, un ieradumus nav viegli izveidot; s\u0101kotn\u0113ji jums b\u016bs past\u0101v\u012bgi j\u0101atg\u0101dina cilv\u0113kiem, lai vi\u0146i izmantotu izseko\u0161anas ier\u012bci. Esiet paciet\u012bgi un saproto\u0161i: nevienu ieradumu nevar izveidot vien\u0101 dien\u0101. Ja j\u016bsu izstr\u0101d\u0101t\u0101ji iepriek\u0161 nav sekoju\u0161i l\u012bdzi laikam, b\u016bs nepiecie\u0161amas ned\u0113\u013cas vai m\u0113ne\u0161i, lai pierastu pie t\u0101 . Tom\u0113r ilgtermi\u0146\u0101 tas b\u016bs t\u0101 v\u0113rts.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">6. Projekta datu izmanto\u0161ana<\/h2>\n\n\n\n<p>Laika izseko\u0161ana sniedz jums datus par j\u016bsu komandu sniegumu un dinamiku starp da\u017e\u0101diem t\u0101s locek\u013ciem; cerams, ka j\u016bs var\u0113siet tos izmantot, lai uzlabotu visu komandas locek\u013cu sniegumu. V\u0113sturisko datu kopumam b\u016btu j\u0101atbild uz vienu vai vair\u0101kiem no \u0161\u0101diem jaut\u0101jumiem:<\/p>\n\n\n\n<p><strong>Prasmju tr\u016bkumi.<\/strong>\u00a0Vai k\u0101dam komandas dal\u012bbniekam tr\u016bkst k\u0101das nepiecie\u0161am\u0101s prasmes? Vai tas pal\u0113nina vai kav\u0113 uzdevuma izpildi? Vai varat vi\u0146iem nodro\u0161in\u0101t laiku un resursus, lai apg\u016btu \u0161o prasmi?<\/p>\n\n\n\n<p><strong>Komandas efektivit\u0101te.<\/strong>\u00a0K\u0101 j\u016bsu apl\u0113stais \u0101trums konkr\u0113tai komandai ir sal\u012bdzin\u0101ms ar t\u0101s faktisko sniegumu? Ja j\u016bs vienm\u0113r nov\u0113rt\u0113jat lietot\u0101ju st\u0101stus, izmantojot t.i. st\u0101stu punktus, vai varat apr\u0113\u0137in\u0101t savas komandas \u0101trumu?<\/p>\n\n\n\n<p><strong>Komandas dinamika.<\/strong> Vai konkr\u0113ta locek\u013cu konfigur\u0101cija ir piem\u0113rota konkr\u0113tam projektam? Vai k\u0101ds no dal\u012bbniekiem kav\u0113 komandas darbu, vai ar\u012b darba pl\u016bsma ir vienm\u0113r\u012bga?<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Secin\u0101jumi<\/h2>\n\n\n\n<p><span data-creator-ids=\"bc67f8b6dfb7\">L\u016bk, jums ir: projektu vad\u012bbas laika uzskaites ce\u013cvedis, kas pal\u012bdz\u0113s jums nok\u013c\u016bt uz pareiz\u0101 ce\u013ca.<\/span><\/p>\n\n\n\n<p><span data-creator-ids=\"bc67f8b6dfb7\">Atcerieties, ka laika uzskaite var veicin\u0101t prasmju izaugsmi un palielin\u0101t darba efektivit\u0101ti.<\/span>, lai min\u0113tu tikai da\u017eus no tiem. Lai gan laika uzskaites s\u0101k\u0161ana var b\u016bt gr\u016bts process, tas k\u013c\u016bst daudz viegl\u0101ks, ja koncentr\u0113jaties uz ievie\u0161anas pamatojuma izskaidro\u0161anu un nep\u0101rtraukti pal\u012bdzat komandas locek\u013ciem pierast pie jaun\u0101 r\u012bka.<\/p>\n\n\n\n<p>Uzmanieties no plauktu programmat\u016bras - atcerieties, ka r\u012bks bija j\u0101veido, dom\u0101jot par t\u0101du uz\u0146\u0113mumu k\u0101 j\u016bsu. Iesp\u0113jams, ir v\u0113rts \u0146emt v\u0113r\u0101 specializ\u0113tus izsekot\u0101jus, piem\u0113ram. <a href=\"https:\/\/teamdeck.io\/lv\/instrumentu-kaste\/darba-laika-uzskaite-agenturam\/\">a\u0123ent\u016bru darba laika uzskaites programmat\u016bra<\/a>, <a href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/marketinga-resursu-parvaldiba-radosajam-agenturam\/\">m\u0101rketinga resursu p\u0101rvald\u012bbas programmat\u016bra<\/a>vai cit\u0101m nozar\u0113m.<\/p>\n\n\n\n<div class=\"vc_row wpb_row vc_row-fluid redl-row-section feature-row vc_custom_1574416816256 vc_row-o-equal-height vc_row-o-content-middle vc_row-flex padding-medium bgv-default bgh-default halign-center\"><\/div>\n\n\n<div class=\"vc_row wpb_row vc_row-fluid redl-row-section vc_row-o-content-middle vc_row-flex padding-default bgv-default bgh-default halign-default\"><div class=\"wpb_column vc_column_container text-center vc_col-sm-12 padding-default bgv-default bgh-default halign-center\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\">\n\t<div class=\"wpb_text_column wpb_content_element\" >\n\t\t<div class=\"wpb_wrapper\">\n\t\t\t<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter\" src=\"https:\/\/media.giphy.com\/media\/l3q2JdGcDC7agGz16\/giphy.gif\" alt=\"Uz\u0146\u0113muma \u012bpa\u0161nieks izmanto projekta vad\u012bbas paneli, lai pie\u0161\u0137irtu uzdevumus un p\u0101rbaud\u012btu, vai komandas locek\u013ci ir vienispr\u0101tis.\" width=\"480\" height=\"263\"><\/p>\n<h2 style=\"text-align: center;\">Vai mekl\u0113jat projektu vad\u012bbas laika izseko\u0161anas programmat\u016bru?<\/h2>\n<h3 style=\"text-align: center;\">Sekojiet komandas darba laika uzskaitei ar Teamdeck - projekta resursu p\u0101rvald\u012bbas programmat\u016bru ar laika uzskaites un laika uzskaites funkcij\u0101m.<\/h3>\n\n\t\t<\/div>\n\t<\/div>\n<a class=\"redl-btn   vc_custom_1596025898618 redl-btn-medium redl-btn-69d82bccdf2d6 btn-icon-left redl-btn redl-btn-two vc_custom_1551260371526 redl-btn-medium redl-btn-5f2168a4adf5d btn-hover-one btn-icon-right signup-top\" href=\"https:\/\/app.teamdeck.io\/register\">Ieg\u016bstiet 30 dienu BEZMAKSAS izm\u0113\u0123in\u0101juma versiju<\/a><div class=\"vc_empty_space\"   style=\"height: 32px\" ><span class=\"vc_empty_space_inner\"><\/span><\/div>\n<\/div><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"Laika uzskaites rokasgr\u0101mata projektu vad\u012bt\u0101jiem, kur\u0101 soli pa solim aprakst\u012bts, k\u0101 \u012bstenot \u0161o procesu j\u016bsu uz\u0146\u0113mum\u0101.","protected":false},"author":5,"featured_media":8619,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22],"tags":[35,28,34],"class_list":["post-2813","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management","tag-pm-tips","tag-project-manager","tag-time-tracking"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v23.8 (Yoast SEO v24.3) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Project Management Time Tracking: Project manager\u2019s Guide...<\/title>\n<meta name=\"description\" content=\"A time tracking guide for project managers with a step-by-step instruction on how to implement this process for your company.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/projektu-vaditaju-laika-uzskaites-rokasgramata\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Project manager\u2019s guide to time tracking\" \/>\n<meta property=\"og:description\" content=\"A time tracking guide for project managers with a step-by-step instruction on how to implement this process for your company.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/projektu-vaditaju-laika-uzskaites-rokasgramata\/\" \/>\n<meta property=\"og:site_name\" content=\"Teamdeck\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/helloteamdeck\" \/>\n<meta property=\"article:published_time\" content=\"2017-04-06T07:32:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-10-15T17:12:36+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/04\/19130830\/time-tracking-guide-1.png\" \/>\n<meta name=\"author\" content=\"Micha\u0142 Bielak\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Project manager\u2019s guide to time tracking\" \/>\n<meta name=\"twitter:description\" content=\"A time tracking guide for project managers with a step-by-step instruction on how to implement this process for your company.\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/time_tracking_guide.jpeg\" \/>\n<meta name=\"twitter:creator\" content=\"@helloteamdeck\" \/>\n<meta name=\"twitter:site\" content=\"@helloteamdeck\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Micha\u0142 Bielak\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/teamdeck.io\/project-management\/project-managers-time-tracking-guide\/\",\"url\":\"https:\/\/teamdeck.io\/project-management\/project-managers-time-tracking-guide\/\",\"name\":\"Project Management Time Tracking: Project manager\u2019s Guide...\",\"isPartOf\":{\"@id\":\"https:\/\/teamdeck.io\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/teamdeck.io\/project-management\/project-managers-time-tracking-guide\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/teamdeck.io\/project-management\/project-managers-time-tracking-guide\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/04\/17204349\/Project-managers-guide-to-time-tracking.jpeg\",\"datePublished\":\"2017-04-06T07:32:21+00:00\",\"dateModified\":\"2023-10-15T17:12:36+00:00\",\"author\":{\"@id\":\"https:\/\/teamdeck.io\/#\/schema\/person\/2ac91d6334de76700b5472041a3112b0\"},\"description\":\"A time tracking guide for project managers with a step-by-step instruction on how to implement this process for your company.\",\"breadcrumb\":{\"@id\":\"https:\/\/teamdeck.io\/project-management\/project-managers-time-tracking-guide\/#breadcrumb\"},\"inLanguage\":\"lv\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/teamdeck.io\/project-management\/project-managers-time-tracking-guide\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lv\",\"@id\":\"https:\/\/teamdeck.io\/project-management\/project-managers-time-tracking-guide\/#primaryimage\",\"url\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/04\/17204349\/Project-managers-guide-to-time-tracking.jpeg\",\"contentUrl\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/04\/17204349\/Project-managers-guide-to-time-tracking.jpeg\",\"width\":1631,\"height\":918,\"caption\":\"Project manager\u2019s guide to time tracking\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/teamdeck.io\/project-management\/project-managers-time-tracking-guide\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/teamdeck.io\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Project Management Time Tracking: Project Manager\u2019s Guide\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/teamdeck.io\/#website\",\"url\":\"https:\/\/teamdeck.io\/\",\"name\":\"Teamdeck\",\"description\":\"resource scheduling + time tracking + leave management\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/teamdeck.io\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/teamdeck.io\/#\/schema\/person\/2ac91d6334de76700b5472041a3112b0\",\"name\":\"Micha\u0142 Bielak\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv\",\"@id\":\"https:\/\/teamdeck.io\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113608\/michal-bielak-150x150.png\",\"contentUrl\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113608\/michal-bielak-150x150.png\",\"caption\":\"Micha\u0142 Bielak\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Project Management Time Tracking: Project manager\u2019s Guide...","description":"A time tracking guide for project managers with a step-by-step instruction on how to implement this process for your company.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/projektu-vaditaju-laika-uzskaites-rokasgramata\/","og_locale":"lv_LV","og_type":"article","og_title":"Project manager\u2019s guide to time tracking","og_description":"A time tracking guide for project managers with a step-by-step instruction on how to implement this process for your company.","og_url":"https:\/\/teamdeck.io\/lv\/projektu-vadiba\/projektu-vaditaju-laika-uzskaites-rokasgramata\/","og_site_name":"Teamdeck","article_publisher":"https:\/\/www.facebook.com\/helloteamdeck","article_published_time":"2017-04-06T07:32:21+00:00","article_modified_time":"2023-10-15T17:12:36+00:00","og_image":[{"url":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/04\/19130830\/time-tracking-guide-1.png","type":"","width":"","height":""}],"author":"Micha\u0142 Bielak","twitter_card":"summary_large_image","twitter_title":"Project manager\u2019s guide to time tracking","twitter_description":"A time tracking guide for project managers with a step-by-step instruction on how to implement this process for your company.","twitter_image":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/time_tracking_guide.jpeg","twitter_creator":"@helloteamdeck","twitter_site":"@helloteamdeck","twitter_misc":{"Written by":"Micha\u0142 Bielak","Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/teamdeck.io\/project-management\/project-managers-time-tracking-guide\/","url":"https:\/\/teamdeck.io\/project-management\/project-managers-time-tracking-guide\/","name":"Project Management Time Tracking: Project manager\u2019s Guide...","isPartOf":{"@id":"https:\/\/teamdeck.io\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teamdeck.io\/project-management\/project-managers-time-tracking-guide\/#primaryimage"},"image":{"@id":"https:\/\/teamdeck.io\/project-management\/project-managers-time-tracking-guide\/#primaryimage"},"thumbnailUrl":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/04\/17204349\/Project-managers-guide-to-time-tracking.jpeg","datePublished":"2017-04-06T07:32:21+00:00","dateModified":"2023-10-15T17:12:36+00:00","author":{"@id":"https:\/\/teamdeck.io\/#\/schema\/person\/2ac91d6334de76700b5472041a3112b0"},"description":"A time tracking guide for project managers with a step-by-step instruction on how to implement this process for your company.","breadcrumb":{"@id":"https:\/\/teamdeck.io\/project-management\/project-managers-time-tracking-guide\/#breadcrumb"},"inLanguage":"lv","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teamdeck.io\/project-management\/project-managers-time-tracking-guide\/"]}]},{"@type":"ImageObject","inLanguage":"lv","@id":"https:\/\/teamdeck.io\/project-management\/project-managers-time-tracking-guide\/#primaryimage","url":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/04\/17204349\/Project-managers-guide-to-time-tracking.jpeg","contentUrl":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/04\/17204349\/Project-managers-guide-to-time-tracking.jpeg","width":1631,"height":918,"caption":"Project manager\u2019s guide to time tracking"},{"@type":"BreadcrumbList","@id":"https:\/\/teamdeck.io\/project-management\/project-managers-time-tracking-guide\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/teamdeck.io\/"},{"@type":"ListItem","position":2,"name":"Project Management Time Tracking: Project Manager\u2019s Guide"}]},{"@type":"WebSite","@id":"https:\/\/teamdeck.io\/#website","url":"https:\/\/teamdeck.io\/","name":"Teamdeck","description":"resource scheduling + time tracking + leave management","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teamdeck.io\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv"},{"@type":"Person","@id":"https:\/\/teamdeck.io\/#\/schema\/person\/2ac91d6334de76700b5472041a3112b0","name":"Micha\u0142 Bielak","image":{"@type":"ImageObject","inLanguage":"lv","@id":"https:\/\/teamdeck.io\/#\/schema\/person\/image\/","url":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113608\/michal-bielak-150x150.png","contentUrl":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113608\/michal-bielak-150x150.png","caption":"Micha\u0142 Bielak"}}]}},"_links":{"self":[{"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/posts\/2813","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/comments?post=2813"}],"version-history":[{"count":30,"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/posts\/2813\/revisions"}],"predecessor-version":[{"id":12506,"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/posts\/2813\/revisions\/12506"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/media\/8619"}],"wp:attachment":[{"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/media?parent=2813"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/categories?post=2813"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teamdeck.io\/lv\/wp-json\/wp\/v2\/tags?post=2813"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}