{"id":4601,"date":"2019-01-28T16:05:48","date_gmt":"2019-01-28T14:05:48","guid":{"rendered":"https:\/\/teamdeck.io\/?p=4601"},"modified":"2023-10-15T19:00:08","modified_gmt":"2023-10-15T17:00:08","slug":"project-resource-management-guide","status":"publish","type":"post","link":"https:\/\/teamdeck.io\/lt\/projektu-valdymas\/projekto-istekliu-valdymo-vadovas\/","title":{"rendered":"Projekto i\u0161tekli\u0173 valdymas 101: vadovas projekt\u0173 vadovams"},"content":{"rendered":"<div class=\"yoast-breadcrumbs\"><span><span><a href=\"https:\/\/teamdeck.io\/lt\/\">Pagrindinis<\/a><\/span> \" <span class=\"breadcrumb_last\" aria-current=\"page\">Projekto i\u0161tekli\u0173 valdymas 101: vadovas projekt\u0173 vadovams<\/span><\/span><\/div>\n\n<p style=\"text-align: justify;\"><strong>Jei klausiate sav\u0119s, kas yra i\u0161tekli\u0173 valdymas, vadinasi, esate visi\u0161kai geroje vietoje. Valdydami projekt\u0105 valdote ne tik u\u017eduotis, kuri\u0173 reikia jam \u012fgyvendinti. Tai, kaip planuojate, organizuojate ir valdote savo komand\u0105, turi didel\u0119 \u012ftak\u0105 projekto s\u0117kmei. Nenuostabu, kad i\u0161tekli\u0173 valdymo geriausios praktikos laikymasis gali i\u0161 ties\u0173 pakeisti situacij\u0105 darbe.\u00a0<\/strong><\/p>\n<p><span style=\"color: #000000;\"><strong>K\u0105 gausite su \u0161iuo straipsniu:<\/strong><\/span><\/p>\n<ul>\n<li>Kaip <a href=\"https:\/\/teamdeck.io\/lt\/\" target=\"_blank\" rel=\"noopener\">i\u0161tekli\u0173 valdymo programin\u0117 \u012franga<\/a> padidino projekto i\u0161tekli\u0173 valdymo efektyvum\u0105.<\/li>\n<li>I\u0161tekli\u0173 valdymo vaidmuo projekt\u0173 valdyme<\/li>\n<li>Projekt\u0173 planavimo metodai<\/li>\n<li>I\u0161tekli\u0173 planavimo skirtumai, <a href=\"https:\/\/teamdeck.io\/lt\/projektu-valdymas\/istekliu-paskirstymas-projektu-vadovams\/\" target=\"_blank\" rel=\"noopener\">i\u0161tekli\u0173 paskirstymas<\/a>ir i\u0161tekli\u0173 planavimas<\/li>\n<\/ul>\n<h2 data-pm-slice=\"1 1 []\"><strong>Kod\u0117l reikalingas projekto i\u0161tekli\u0173 valdymas?<\/strong><\/h2>\n<p><span data-color=\"var(--green-10)\">Kadangi nor\u0117tume nu\u0161viesti projekto i\u0161tekli\u0173 valdymo esm\u0119, turime \u012fvesti nedidel\u012f akademin\u012f pokalb\u012f, skirt\u0105 su m\u016bs\u0173 pagrindine tema susijusiems terminams paai\u0161kinti.<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">Ta\u010diau yra ir kita \u0161i\u0173 gin\u010d\u0173 prie\u017eastis. Neturint ai\u0161kaus supratimo apie pagrindinius projekto i\u0161tekli\u0173 valdym\u0105 sudaran\u010dius elementus ir veiksnius, priimant sprendimus kyla didesn\u0117 rizika suklysti. Klaid\u0173, susijusi\u0173 su projekte vykstan\u010diais procesais ar net su programin\u0117s \u012frangos, skirtos projekto i\u0161tekliams valdyti, pasirinkimu.<\/span><\/p>\n<figure style=\"width: 2506px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/18095018\/booking_5_collaboration.jpg\" alt=\"Projekto i\u0161tekli\u0173 valdymas\" width=\"2506\" height=\"1328\" \/><figcaption class=\"wp-caption-text\">Projekto i\u0161tekli\u0173 valdymo proceso dalis [\u0160altinis: \"Teamdeck\" programin\u0117 \u012franga]<\/figcaption><\/figure>\n<p><span data-color=\"var(--green-10)\">Tur\u0117dami bendr\u0105 vaizd\u0105 nepasiklysite s\u0105vok\u0173 labirinte ir neai\u0161kiose s\u0105sajose tarp \u017eini\u0173 sri\u010di\u0173, kurios i\u0161 esm\u0117s padeda valdyti projektus.<\/span><\/p>\n<h3><strong>Nuo projekto, projekto valdymo iki projekto i\u0161tekli\u0173 valdymo<\/strong><\/h3>\n<p>IT projekt\u0173 valdymas, <a href=\"https:\/\/teamdeck.io\/lt\/projektu-valdymas\/rinkodaros-projektu-valdymo-programines-irangos-irankiai-patarimai-etapai\/\">rinkodaros projekt\u0173 valdymas<\/a>, projekt\u0173 valdymas nekilnojamojo turto srityje arba <a href=\"https:\/\/teamdeck.io\/lt\/irankiu-dezute\/agenturos-projektu-valdymo-stekas\/\" target=\"_blank\" rel=\"noopener\">k\u016brybin\u0117s agent\u016bros projekt\u0173 valdymas<\/a> - ta\u010diau, kad ir koki\u0105 pramon\u0117s \u0161ak\u0105 \u012fterptum\u0117te prie\u0161 \u017eod\u012f \"projekt\u0173 valdymas\", etapai, procesai ir \u017eingsniai da\u017eniausiai yra tie patys. Ta\u010diau prie\u0161 jums apie tai su\u017einant, reikia padaryti nedidel\u0119 \u012f\u017eang\u0105.\u00a0<\/p>\n<p><span data-color=\"var(--green-10)\">Kaip \u017einome, \u017emon\u0117s grei\u010diau mokosi matydami paveiksl\u0117lius ar pavyzd\u017eius - pirmiausia k\u0105 nors galima u\u017efiksuoti poj\u016b\u010diais, akimis. Taigi - prie\u0161 susidurdami su daugybe klausim\u0173, susijusi\u0173 su kiekvieno toliau pateiktuose apibr\u0117\u017eimuose nurodyto termino reik\u0161me, prad\u0117kime nuo vaizding\u0173 ir lengvai pritaikom\u0173 pavyzd\u017ei\u0173, priklausan\u010di\u0173 projekt\u0173 valdymo \u0161eimai.<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">Prad\u0117kite nuo ma\u017eiau sud\u0117ting\u0173 ir u\u017eiman\u010di\u0173 ma\u017eiau laiko:<\/span><\/p>\n<ul>\n<li><span data-color=\"var(--green-10)\">per 4 savaites sukurti gerai parduodam\u0105 interneto svetain\u0119 su daugybe interaktyvi\u0173 element\u0173, kuri nesul\u0117t\u0117s naudojant mobiliuosius \u012frenginius;<\/span><\/li>\n<li><span data-color=\"var(--green-10)\">per 3 m\u0117nesius pertvarkyti alaus bendrov\u0117s buteli\u0173 dizain\u0105 ir jo gamyb\u0105 prie\u0161 prasidedant vasarai;<\/span><\/li>\n<li><span data-color=\"var(--green-10)\">pardavim\u0173 pl\u0117tr\u0105 naujoje rinkoje, kuri apima biur\u0173 nuom\u0105, nauj\u0173 specialist\u0173 paie\u0161k\u0105, atrank\u0105, \u012fdarbinim\u0105, rinkodaros plano parengim\u0105 ir jo \u012fgyvendinim\u0105 atsi\u017evelgiant \u012f vietos paklaus\u0105 - per 6 m\u0117nesius;<\/span><\/li>\n<li><span data-color=\"var(--green-10)\">per 48 m\u0117nesius sukurti ka\u017ek\u0105 pana\u0161aus \u012f tai, kas pateikta toliau - sukurti did\u017eiausi\u0105 pasaulyje u\u017etvank\u0105. \u0160is pavyzdys stovi ant tre\u010dios pagal dyd\u012f pasaulio up\u0117s - Kinijos Jangdz\u0117s up\u0117s.\u00a0<\/span><\/li>\n<\/ul>\n<figure style=\"width: 1600px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/cdn.britannica.com\/20\/119620-050-AC901996\/Yichang-Three-Gorges-Dam-Yangtze-River-China.jpg\" alt=\"Projekto i\u0161tekliais, reikalingais projekto s\u0117kmei u\u017etikrinti, r\u016bpinasi patyr\u0119s i\u0161tekli\u0173 valdytojas.\" width=\"1600\" height=\"1072\" \/><figcaption class=\"wp-caption-text\">\u0160is 17 met\u0173 truksiantis, $59 mlrd. vert\u0117s projektas yra 595 p\u0117d\u0173 auk\u0161\u010dio, 131 p\u0117dos plo\u010dio ir daugiau kaip 7600 p\u0117d\u0173 ilgio, o elektr\u0105 gamina 32 pagrindin\u0117s turbinos. Kainos? Kiekvienos u\u017eduoties reikalavimai? Terminai? Tvarkara\u0161\u010diai? Dalyvaujan\u010di\u0173 \u017emoni\u0173 ir \u012fg\u016bd\u017ei\u0173 skai\u010dius?<\/figcaption><\/figure>\n<p><span data-color=\"var(--green-10)\">Apibendrinant, kai tik pagalvojate apie projekt\u0105, turite \u012fsivaizduoti, kiek \u017emoni\u0173, \u012fg\u016bd\u017ei\u0173, subrangov\u0173, \u012franki\u0173 ir priemoni\u0173 apima projektas. Kiek i\u0161tekli\u0173, priklausomybi\u0173, ma\u017e\u0173 \u017eingsneli\u0173 ir milijono u\u017eduo\u010di\u0173 bei grafik\u0173 reikia kiekvienai projekto iliustracijai u\u017ebaigti?<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">T\u0119siant tem\u0105, metas panagrin\u0117ti apibr\u0117\u017etis. Taigi prad\u0117kime nuo to, k\u0105 lengviau priimti. \u012esivaizduokime, kad kalbate su vaikinu ir norite jam apib\u016bdinti, k\u0105 rei\u0161kia projekt\u0173 valdymas. Tokiame kontekste, kaip \u0161is, gal\u0117tum\u0117te lengvai pritarti apibr\u0117\u017e\u010diai i\u0161 projectmanager.com:<\/span><\/p>\n<blockquote>\n<p>Projekt\u0173 valdymas - tai projekt\u0173 planavimo, vykdymo ir u\u017ebaigimo disciplina.<\/p>\n<\/blockquote>\n<p><span data-color=\"var(--green-10)\">Min\u0117tame supratime projekt\u0173 valdymas laikomas procesu ir suskirstytas \u012f 3 etapus. \u017dinoma, kiekviename i\u0161 j\u0173 yra dar kelios grup\u0117s element\u0173, proces\u0173, u\u017eduo\u010di\u0173 ir - visada ne\u012fvertinami, visada nenusp\u0117jami - su kiekvienu i\u0161 j\u0173 susij\u0119 i\u0161\u0161\u016bkiai.<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">Ta\u010diau tai yra labai supaprastinta projekt\u0173 valdymo gyvavimo ciklo versija, nes taip \u0161\u012f proces\u0105 \u012fvardija specialistai. Populiariausia yra versija su 5 etapais. PMI parengta koncepcija ir inicijavimas, planavimas, vykdymas, atlikimas \/ steb\u0117sena ir projekto u\u017ebaigimas.<\/span><\/p>\n<figure id=\"attachment_10516\" aria-describedby=\"caption-attachment-10516\" style=\"width: 1424px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-10516 size-full\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/09170227\/5bd9fbb8792c1491dfc88cc4_5-Project-Management-Phases.png\" alt=\"Projekto i\u0161tekli\u0173 valdymas yra papras\u010diausiai susij\u0119s su projekto komandos pareigyb\u0117mis \" width=\"1424\" height=\"687\" srcset=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/09170227\/5bd9fbb8792c1491dfc88cc4_5-Project-Management-Phases.png 1424w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/09170227\/5bd9fbb8792c1491dfc88cc4_5-Project-Management-Phases-300x145.png 300w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/09170227\/5bd9fbb8792c1491dfc88cc4_5-Project-Management-Phases-1280x618.png 1280w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/09170227\/5bd9fbb8792c1491dfc88cc4_5-Project-Management-Phases-768x371.png 768w\" sizes=\"auto, (max-width: 1424px) 100vw, 1424px\" \/><figcaption id=\"caption-attachment-10516\" class=\"wp-caption-text\">5 projekt\u0173 valdymo proceso etapai (projekt\u0173 valdymo gyvavimo ciklas). Tur\u0117dami \u0161i\u0105 vizualizacij\u0105 prie\u0161 akis, galite \u012fsivaizduoti sritis, kuriose projekt\u0173 i\u0161tekli\u0173 valdymo sistema gali pad\u0117ti<\/figcaption><\/figure>\n<p><span data-color=\"var(--green-10)\">Ta\u010diau \u0161is apibr\u0117\u017eimas nekelia klausimo, kas tai yra. Kalbant konkre\u010diai - \u017emogus, specialistas ir jo kompetencija, patirtis ar branda.<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">Pasak tos pa\u010dios PMI, kuri\u0105 \u010dia da\u017enai minime, jie pasi\u016bl\u0117 apibr\u0117\u017eim\u0105, kuris pabr\u0117\u017eia, kas slypi u\u017e kiekvieno projekto. Tai susij\u0119 su \u017emon\u0117mis, pradedant projekt\u0173 vadovais, baigiant projekt\u0173 vykdytojais ir projekte dalyvaujan\u010diais darbuotojais. \u017dmones, kurie planuoja, bet ir tuos, kurie atrenkami dalyvauti tam tikrame projekto etape ir paskiriami atlikti u\u017eduotis.<\/span><\/p>\n<p>Perfrazuojant j\u0173 \u017eod\u017eius, projekt\u0173 valdymas - tai naudojimasis <span style=\"font-size: revert; color: initial; font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Roboto, Oxygen-Sans, Ubuntu, Cantarell, 'Helvetica Neue', sans-serif;\">konkre\u010dios \u017einios, talentai, \u012fg\u016bd\u017eiai, priemon\u0117s, \u012frankiai, metodai, procesai ir technikos, kad b\u016bt\u0173 sukurta \"vert\u0117 \u017emon\u0117ms\".<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">Kaip matome, \u010dia daugiau kalbama apie kompetencijas (taip pat ir apie mink\u0161t\u0105sias kompetencijas), apie informacijos tur\u0117jim\u0105 ir geb\u0117jim\u0105 j\u0105 pritaikyti. Arba - pavartojus fraz\u0119, paimt\u0105, tarkime, i\u0161 motyvacin\u0117s bibliotekos, - paversti m\u0105stym\u0105 veiksmu ir atlikti darbus.<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">\u0160io skyriaus santraukoje naudojame Projekt\u0173 valdymo instituto asociacijos pasi\u016blym\u0105. Jis n\u0117ra pats neskausmingiausias \u012fsiminti ar net suprasti projekt\u0173 valdymo apibr\u0117\u017et\u012f, ta\u010diau perskai\u010dius tai, kas i\u0161d\u0117styta auk\u0161\u010diau, galima nesunkiai \u012fsivaizduoti, k\u0105 autorius tur\u0117jo omenyje. Ta\u010diau \u0161tai su kuo mes nesutinkame. Vis d\u0117lto:<\/span><\/p>\n<blockquote>\n<p>Projekt\u0173 valdymas - tai proces\u0173, metod\u0173, \u012fg\u016bd\u017ei\u0173, \u017eini\u0173 ir patirties taikymas, siekiant konkre\u010di\u0173 projekto tiksl\u0173 pagal projekto pri\u0117mimo kriterijus, laikantis sutart\u0173 parametr\u0173. Projekto valdymas turi galutinius rezultatus, kurie yra apriboti ribotu laiku ir biud\u017eetu.<\/p>\n<\/blockquote>\n<p><span data-color=\"var(--green-10)\">Keletas pastab\u0173. Matome tam tikr\u0173 pana\u0161um\u0173 su anks\u010diau pasi\u016blytais pasi\u016blymais, tod\u0117l apie tai daugiau nieko nereikia sakyti. Nauja yra ribotas laikas ir biud\u017eetas bei pri\u0117mimo kriterijai. Pradedant nuo pastarojo, j\u016bs\u0173 klientas paprastai turi tam tikr\u0173 l\u016bkes\u010di\u0173, k\u0105 jis nori matyti fini\u0161o tiesiojoje, kaip tai tur\u0117t\u0173 veikti ir kaip tai tur\u0117t\u0173 pad\u0117ti i\u0161spr\u0119sti jo i\u0161\u0161\u016bkius. Jis negali priimti j\u016bs\u0173 darbo rezultato. O kas tada?<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">Ta\u010diau sunku prie\u0161tarauti - d\u0117l pri\u0117mimo kriterij\u0173 projektas gali trukti ilgiau, nei manoma. Ta\u010diau negalime sutikti su teiginiu, kad biud\u017eetas ir laikas yra s\u0105lygos, d\u0117l kuri\u0173 vadovavimas projektui laikomas projekto valdymu.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-10483\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2022\/05\/09115329\/timesheets_2_multiple.jpg\" alt=\"\" width=\"1620\" height=\"877\" \/><\/p>\n<p>Projekt\u0173 valdym\u0105 nuo paprasto valdymo skiria ribotas laikas ir biud\u017eetas [Ekranas vir\u0161uje = keli\u0173 u\u017eduo\u010di\u0173 laiko steb\u0117jimo per projekto i\u0161tekli\u0173 valdymo sistem\u0105 ap\u017evalga]<\/p>\n<p><span data-color=\"var(--green-10)\">Kiekvienas \u017eino, kad paskutiniai du aspektai, \u012f kuriuos turi atsi\u017evelgti bet kuris pirmininkas, vir\u0161ininkas ar sprendim\u0173 pri\u0117m\u0117jas, vykdantis bet kok\u012f projekt\u0105, yra min\u0117tas laikas ir biud\u017eetas, nes jie n\u0117ra neriboti. Ta\u010diau tik investicij\u0173 gr\u0105\u017ea, tik\u0117tina gr\u0105\u017ea per numatyt\u0105 laik\u0105 turi did\u017eiausi\u0105 \u012ftak\u0105 verslo sprendimams nei bet kuris kitas veiksnys. O daugelio \u012fmoni\u0173 po\u017ei\u016briu, pagrindin\u0117 verslo dalis yra pinigai. Nes jei turi pakankamai pinig\u0173, nereikia priimti skubot\u0173 sprendim\u0173 ir laukti, k\u0105 padarys konkurentai, kovojantys d\u0117l kit\u0173 klient\u0173.<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">Jei sutinkame su pastaruoju teiginiu, negalime sutikti su teiginiu, kad projekt\u0173 valdymas yra ka\u017ekas kita nei \"vadyba\", nurodydami, kad pagrindinis veiksnys, skiriantis juos abu, yra tai, kad projekt\u0173 valdymas turi galutin\u012f rezultat\u0105 ir ribot\u0105 laik\u0105, prie\u0161ingai nei vadyba, kuri yra nuolatinis procesas.<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">Nesame tikri, ar jis veikia tik tokiu b\u016bdu. Ar verslo tikslas yra tur\u0117ti daug klient\u0173, ypa\u010d daug klient\u0173, kurie leist\u0173 verslui veikti? Ar verslui reikia nuolatinio bendravimo su potencialiais klientais? Ar rinkodaros skyrius per reikiam\u0105 laik\u0105 \u012fgyvendina ma\u017eesnes u\u017eduotis ar didesnius projektus, kad pager\u0117t\u0173 bendravimas, padid\u0117t\u0173 svetain\u0117s lankytoj\u0173 ir potenciali\u0173 klient\u0173 skai\u010dius? Ar u\u017e rinkodar\u0105 ir komunikacij\u0105 atsakingi asmenys neturi kart\u0105 per m\u0117nes\u012f ar kelis kartus per metus informuoti apie rezultatus?\u00a0<\/span><\/p>\n<h3 data-pm-slice=\"1 1 []\"><strong>Atsakymas \u012f klausim\u0105 <em>Kod\u0117l projekto i\u0161tekli\u0173 valdymas<\/em><\/strong><\/h3>\n<p>Ar dabar suprantate projekto i\u0161tekli\u0173 valdymo svarb\u0105?<\/p>\n<figure style=\"width: 1384px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/images.surferseo.art\/2068d9f3-8586-4dc5-828f-47f4d7501878.png\" alt=\"\" width=\"1384\" height=\"1034\" \/><figcaption class=\"wp-caption-text\">Ar suprantate projekto i\u0161tekli\u0173 valdymo svarb\u0105? [\u0160altinis: metin\u0117 ataskaita \"Projekt\u0173 valdymo b\u016bkl\u0117\", Wellington 2020].<\/figcaption><\/figure>\n<h3><strong>Koks yra projekto i\u0161tekli\u0173 valdymo vaidmuo?<\/strong><\/h3>\n<p><span data-color=\"var(--green-10)\">Daug su\u017einojote apie projekt\u0173 valdym\u0105, tod\u0117l jums nereikia b\u016bti informuotiems daugiau. Mes taip pat jau \u017einome, kur <\/span><strong><span data-color=\"var(--green-10)\">visada<\/span><\/strong><span data-color=\"var(--green-10)\"> tarp 5 projekt\u0173 valdymo ciklo etap\u0173 rasti viet\u0105 projekto i\u0161tekli\u0173 valdymui.<\/span><\/p>\n<ul>\n<li>Iniciacijos ir koncepcijos etapas<\/li>\n<li>Planavimas - visada \u010dia<\/li>\n<li>Paleidimas ir vykdymas - visada \u010dia<\/li>\n<li>Steb\u0117sena ir kontrol\u0117 - visada \u010dia<\/li>\n<li>Projekto u\u017ebaigimas<\/li>\n<\/ul>\n<p>Jis skirtas m\u016bs\u0173 tyrimo \u017evaig\u017edei - projekto i\u0161tekli\u0173 valdymui. Jau \u017einome, k\u0105 rei\u0161kia projektas. <span data-color=\"var(--green-10)\">Taigi, kokie yra i\u0161tekliai?<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">A\u010di\u016b <\/span><em><span data-color=\"var(--green-10)\">APM \u017eini\u0173 visuma<\/span><\/em><span data-color=\"var(--green-10)\">, \u017einome, kad i\u0161tekliai suprantami pla\u010diai - kaip \u017emon\u0117s (ir j\u0173 \u012fg\u016bd\u017eiai), taip pat kaip pinigai, ma\u0161inos, med\u017eiagos, technologijos ir visa kita, ko reikia laukiamam rezultatui pasiekti. Taip pat galima sakyti, kad i\u0161tekliai yra viskas, ko reikia u\u017eduo\u010diai ar projektui atlikti.<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">\u017dinoma, daugelio \u012fmoni\u0173, ypa\u010d \u012f paslaugas orientuot\u0173 \u012fmoni\u0173, po\u017ei\u016briu, i\u0161tekli\u0173 valdymas yra susij\u0119s su \u017emon\u0117mis. \u017dmon\u0117s ir j\u0173 \u012fg\u016bd\u017eiai.<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">Jiems projekto i\u0161tekli\u0173 valdymas yra:<\/span><\/p>\n<blockquote>\n<p><span data-color=\"var(--green-10)\">(...) \u012fgyti, paskirstyti ir valdyti i\u0161teklius, pavyzd\u017eiui, asmenis ir j\u0173 \u012fg\u016bd\u017eius, finansus, technologijas, med\u017eiagas, ma\u0161inas ir gamtinius i\u0161teklius, reikalingus projektui \u012fgyvendinti. I\u0161tekli\u0173 valdymas u\u017etikrina, kad vidaus ir i\u0161or\u0117s i\u0161tekliai b\u016bt\u0173 naudojami veiksmingai, laiku ir pagal biud\u017eet\u0105.<\/span><\/p>\n<\/blockquote>\n<p>Tai n\u0117ra pats papras\u010diausias apibr\u0117\u017eimas d\u0117l dviprasmi\u0161k\u0173 s\u0105vok\u0173, tod\u0117l jis gal\u0117t\u0173 b\u016bti tinkamas akademinei disertacijai. Bet ne \u0161iame tinklara\u0161tyje. Projectmanager.com mes susipa\u017e\u012fstame paprastai. Nekalb\u0117dami apie kokyb\u0119, reikalavimus ir l\u016bkes\u010dius, kurie kyla i\u0161 suinteresuot\u0173j\u0173 \u0161ali\u0173, ar net laik\u0105 ir biud\u017eet\u0105.<\/p>\n<blockquote>\n<p><span data-color=\"var(--green-10)\">I\u0161tekli\u0173 valdymas - tai i\u0161tekli\u0173 planavimo, tvarkara\u0161\u010dio sudarymo ir paskirstymo procesas, skirtas projektui u\u017ebaigti.<\/span><\/p>\n<\/blockquote>\n<figure style=\"width: 1916px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/15174243\/Zrzut-ekranu-2022-04-15-o-13.10.10-1.png\" alt=\"\" width=\"1916\" height=\"1142\" \/><figcaption class=\"wp-caption-text\">Komandos panaudojimo ataskaitos ap\u017evalga - \u017emoni\u0173 darbo vertinimo pavyzdys [\u0161altinis: \"Teamdeck\" - projekto i\u0161tekli\u0173 valdymo programin\u0117 \u012franga]<\/figcaption><\/figure>\n<p><span data-color=\"var(--green-10)\"><strong>Geras i\u0161tekli\u0173 valdymas u\u017etikrina, kad tinkami i\u0161tekliai b\u016bt\u0173 prieinami tinkamu laiku tinkamam darbui atlikti.<\/strong> <\/span><span data-color=\"var(--green-10)\">I\u0161tekli\u0173 valdytojo vaidmuo - perfrazuojant APM \u017eod\u017eius - <\/span>nustatyti reikalingus i\u0161teklius (atitinkamus \u012fg\u016bd\u017eius ir patirt\u012f turin\u010dius darbuotojus). <span data-color=\"var(--green-10)\">atlikti darb\u0105, kaip planavimo dal\u012f, ir nustatyti, kada reik\u0117s i\u0161tekli\u0173, kaip planavimo dal\u012f.<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">Kaip matome, apskritai apibr\u0117\u017etys - i\u0161skyrus j\u0173 pateikimo form\u0105 - yra pana\u0161ios. Jei pabandysime palyginti projekto i\u0161tekli\u0173 valdymo apibr\u0117\u017eimus, b\u016bsime labiau nu\u0161viesti, pamat\u0119, k\u0105 jie visi kartu turi bendro. Gerai:<\/span><\/p>\n<ul>\n<li><span data-color=\"var(--green-10)\">i\u0161ankstinis planavimas \/ planavimas<\/span><\/li>\n<li><span data-color=\"var(--green-10)\">paskirstymas \/ planavimas \/ derinimas<\/span><\/li>\n<li><span data-color=\"var(--green-10)\">steb\u0117jimas ir (arba) matavimas<\/span><\/li>\n<li><span data-color=\"var(--green-10)\">optimizavimas<\/span><\/li>\n<\/ul>\n<p><span style=\"color: #000000;\" data-color=\"var(--green-10)\">Apibendrinant iki \u0161iol vykusi\u0105 diskusij\u0105 galima teigti, kad projekto i\u0161tekli\u0173 valdymas, be jokios abejon\u0117s, yra daugiausiai pastang\u0173 reikalaujantis ir sud\u0117tingiausias projekto valdymo proceso elementas. Jo vaidmuo - paprastai kalbant - susiveda \u012f \u017emoni\u0173 darbo planavim\u0105, organizavim\u0105, kontrol\u0119 ir vertinim\u0105.\u00a0<\/span><\/p>\n<p><span style=\"color: #000000;\">Projekto i\u0161tekli\u0173 valdymas - tai, papras\u010diau tariant, kuo veiksmingiau panaudoti turimus ribotus i\u0161teklius. Arba, jei norime pasakyti, kaip viskas vyksta i\u0161 tikr\u0173j\u0173, - naudoti maksimalius turimus i\u0161teklius, i\u0161 anksto nustatytus ir patikrintus d\u0117l tinkam\u0173 \u012fg\u016bd\u017ei\u0173, kad projektas b\u016bt\u0173 u\u017ebaigtas per numatyt\u0105 laik\u0105 ir b\u016bt\u0173 pasiektas numatytas rezultatas.<\/span><\/p>\n<h3><strong><span data-color=\"var(--green-10)\">I\u0161tekli\u0173 planavimas, i\u0161tekli\u0173 paskirstymas ir projekto i\u0161tekli\u0173 valdymas<\/span><\/strong><\/h3>\n<p><span data-color=\"var(--green-10)\">Kad \u012f\u017eanga neb\u016bt\u0173 per ilga, reikia \u017einoti, kad 3 min\u0117ti terminai kai kuri\u0173 projekt\u0173 vadov\u0173 ir akademin\u0117s bendruomen\u0117s atstov\u0173 yra suprantami kaip atskiri ir kiekvienas i\u0161 j\u0173 turi savo reik\u0161m\u0119.<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">Ta\u010diau kai kuriems \u017emon\u0117ms i\u0161tekli\u0173 planavimas ir i\u0161tekli\u0173 paskirstymas rei\u0161kia t\u0105 pat\u012f, ir abu yra didesnio dalyko - i\u0161tekli\u0173 valdymo - dalis. Ta\u010diau daugelyje \u0161altini\u0173 apie m\u016bs\u0173 tem\u0105 taip pat galima rasti apibr\u0117\u017eim\u0173, kuriuose si\u016bloma tapatinti \"i\u0161tekli\u0173 valdym\u0105\" ir \"i\u0161tekli\u0173 planavim\u0105\" (\u017er. Vikipedijos apibr\u0117\u017eim\u0105). Taigi at\u0117jo laikas keliais \u017eod\u017eiais paai\u0161kinti.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-medium\" src=\"https:\/\/media.giphy.com\/media\/3o6MbnqpZBwWdWg3gk\/giphy.gif\" alt=\"Planuoti i\u0161tekli\u0173 valdym\u0105, apimant\u012f i\u0161tekli\u0173 paj\u0117gumus ir i\u0161tekli\u0173 pra\u0161ymus.\" width=\"480\" height=\"366\" \/><\/p>\n<p><span data-color=\"var(--green-10)\">Sutinkame su bendrove \"Saviom\" - m\u016bs\u0173 konkurente projekt\u0173 i\u0161tekli\u0173 valdymo sistem\u0173 rinkoje - kad:\u00a0\u00a0<\/span><\/p>\n<blockquote>\n<p><em><span data-color=\"var(--green-10)\">I\u0161tekli\u0173 paskirstymas, dar vadinamas i\u0161tekli\u0173 planavimu, leid\u017eia atpa\u017einti ir priskirti i\u0161teklius tam tikram laikotarpiui \u012fvairioms veikloms.<\/span><\/em><\/p>\n<\/blockquote>\n<p><span data-color=\"var(--green-10)\">Akimirksniu galima pasteb\u0117ti, kad \u0161i apibr\u0117\u017etis taip pat gali b\u016bti traktuojama kaip i\u0161tekli\u0173 valdymo apibr\u0117\u017etis. Ar ne? Vis d\u0117lto \u0161iame straipsnyje stengiam\u0117s i\u0161laikyti tvark\u0105, pagal kuri\u0105 projekto i\u0161tekli\u0173 valdymas ir visas jo procesas apima planavim\u0105 ir paskirstym\u0105 kaip sudedam\u0105sias dalis.<\/span><\/p>\n<p><span data-color=\"var(--green-10)\">Gal\u0117tume t\u0119sti diskusij\u0105 apie niuans\u0173 apibr\u0117\u017eim\u0105, bet tai n\u0117ra tikslas. \u0160io skyriaus tikslas - suteikti jums platesn\u012f vaizd\u0105 apie terminologinius svarstymus ir i\u0161\u0161\u016bkius, susijusius su dominan\u010diu terminu.<\/span><\/p>\n<p>\u00a0<\/p>\n<h2 style=\"text-align: justify;\"><strong>KPI, i\u0161\u0161\u016bkiai ir naudingas programin\u0117s \u012frangos vaidmuo valdant projekto i\u0161teklius<\/strong><\/h2>\n<h3><strong>Projekto i\u0161tekli\u0173 valdymo KPI\u00a0<\/strong><\/h3>\n<p style=\"text-align: justify;\">A. Numatytos ir fakti\u0161kai dirbtos valandos<\/p>\n<p>Ar projektas vyksta pagal plan\u0105 - tai nuolatinis klausimas kiekvieno projekto vadovo galvoje. Palyginus numanom\u0105 numatom\u0105 vert\u0119 (pavyzd\u017eiui, valandas, kurias darbuotojas turi skirti u\u017eduo\u010diai atlikti) su faktin\u0117mis steb\u0117tomis valandomis, galima patikrinti pa\u017eang\u0105. \u0160io metodo d\u0117ka gal\u0117site pasteb\u0117ti ankstyvuosius projekto v\u0117lavimo po\u017eymius ir atlikti tam tikrus pakeitimus dabartinio projekto metu arba ateityje.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-10663 size-full\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23081930\/Zrzut-ekranu-2022-05-12-o-14.57.12-1.png\" alt=\"I\u0161tekli\u0173 valdymo rodikliai\" width=\"1328\" height=\"934\" srcset=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23081930\/Zrzut-ekranu-2022-05-12-o-14.57.12-1.png 1328w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23081930\/Zrzut-ekranu-2022-05-12-o-14.57.12-1-300x211.png 300w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23081930\/Zrzut-ekranu-2022-05-12-o-14.57.12-1-1280x900.png 1280w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23081930\/Zrzut-ekranu-2022-05-12-o-14.57.12-1-768x540.png 768w\" sizes=\"auto, (max-width: 1328px) 100vw, 1328px\" \/><\/p>\n<p style=\"text-align: justify;\">\u00a0<\/p>\n<p style=\"text-align: justify;\">\u00a0<\/p>\n<p style=\"text-align: justify;\">B. Numatytos ir faktin\u0117s i\u0161laidos vienam komandos nariui (i\u0161tekli\u0173 i\u0161laid\u0173 skirtumas)<\/p>\n<p style=\"text-align: justify;\">Dar vienas veiksnys, ver\u010diantis projekt\u0173 vadovus intensyviai m\u0105styti, yra komandos darbo s\u0105naudos. Geros projekt\u0173 i\u0161tekli\u0173 valdymo sistemos leid\u017eia kiekvienam komandos nariui priskirti valandinius ar net dienos \u012fkainius ir sudaryti <a href=\"https:\/\/teamdeck.io\/lt\/irankiu-dezute\/projekto-islaidu-stebejimas\/\">projekto i\u0161laid\u0173 steb\u0117jimas<\/a> ataskaitas, paremtas jais ir j\u016bs\u0173 komandos darbo laiko apskaitos \u017einiara\u0161\u010diais.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-10664\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23082105\/Zrzut-ekranu-2022-05-12-o-14.58.22-1.png\" alt=\"\" width=\"1642\" height=\"884\" srcset=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23082105\/Zrzut-ekranu-2022-05-12-o-14.58.22-1.png 1642w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23082105\/Zrzut-ekranu-2022-05-12-o-14.58.22-1-300x162.png 300w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23082105\/Zrzut-ekranu-2022-05-12-o-14.58.22-1-1280x689.png 1280w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23082105\/Zrzut-ekranu-2022-05-12-o-14.58.22-1-768x413.png 768w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23082105\/Zrzut-ekranu-2022-05-12-o-14.58.22-1-1536x827.png 1536w\" sizes=\"auto, (max-width: 1642px) 100vw, 1642px\" \/><\/p>\n<p style=\"text-align: justify;\">\u00a0<\/p>\n<p style=\"text-align: justify;\">C. I\u0161ra\u0161om\u0173 ir nei\u0161ra\u0161om\u0173 s\u0105skait\u0173 valandos<\/p>\n<p style=\"text-align: justify;\">Projekt\u0173 valand\u0173, u\u017e kurias s\u0105skaitos nei\u0161ra\u0161omos, ir valand\u0173, u\u017e kurias s\u0105skaitos i\u0161ra\u0161omos, pasiskirstymas padeda steb\u0117ti \u012fmon\u0117s pelningum\u0105. Patikrinkite, kiek valand\u0173 j\u016bs\u0173 komandos nariai skiria tokiai veiklai, kaip susitikimai, administracin\u0117s u\u017eduotys ir pan.<\/p>\n<p style=\"text-align: justify;\">D. I\u0161tekli\u0173 panaudojimas \/ Darbuotoj\u0173 panaudojimas<\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">I\u0161tekli\u0173 panaudojimas yra vienas i\u0161 svarbiausi\u0173 \u012fmon\u0117se stebim\u0173 pagrindini\u0173 veiklos rodikli\u0173. Juk nenorite, kad j\u016bs\u0173 komanda b\u016bt\u0173 per daug u\u017eimta ar pervargusi. Ir - prie\u0161ingu atveju - niekas netur\u0117t\u0173 likti be u\u017eduo\u010di\u0173. Yra <\/span><span style=\"font-weight: 400;\">2 skai\u010diavimo b\u016bdai <a href=\"https:\/\/teamdeck.io\/lt\/projektu-valdymas\/kaip-ismatuoti-istekliu-panaudojima\/\">i\u0161tekli\u0173 naudojimas<\/a><\/span><span style=\"font-weight: 400;\">ir tur\u0117tum\u0117te juos naudoti dviem skirtingais projekto gyvavimo ciklo etapais.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-10665\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23082225\/Zrzut-ekranu-2022-05-12-o-15.00.28-1.png\" alt=\"\" width=\"1676\" height=\"1074\" srcset=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23082225\/Zrzut-ekranu-2022-05-12-o-15.00.28-1.png 1676w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23082225\/Zrzut-ekranu-2022-05-12-o-15.00.28-1-300x192.png 300w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23082225\/Zrzut-ekranu-2022-05-12-o-15.00.28-1-1280x820.png 1280w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23082225\/Zrzut-ekranu-2022-05-12-o-15.00.28-1-768x492.png 768w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2021\/01\/23082225\/Zrzut-ekranu-2022-05-12-o-15.00.28-1-1536x984.png 1536w\" sizes=\"auto, (max-width: 1676px) 100vw, 1676px\" \/><\/p>\n<p>\u00a0<\/p>\n<h3 data-pm-slice=\"1 3 []\"><strong>I\u0161\u0161\u016bkiai, kylantys projekto i\u0161tekli\u0173 valdymo procesuose<\/strong><\/h3>\n<p>A. Lengvos prieigos prie i\u0161tekli\u0173 kompetencijos ir i\u0161tekli\u0173 fondo tr\u016bkumas<\/p>\n<p>Kuo daugiau projekt\u0173, tuo daugiau juose dalyvaujan\u010di\u0173 darbuotoj\u0173. Kuo daugiau darbuotoj\u0173, tuo sunkiau greitai rasti tinkamus darbuotojus, kuriuos b\u016bt\u0173 galima priskirti projektui. Pakankamos projekt\u0173 i\u0161tekli\u0173 planavimo sistemos vaidmuo - pad\u0117ti rasti i\u0161teklius, atitinkan\u010dius numatytus \u012fg\u016bd\u017eius, brand\u0105, patirt\u012f, kompetencij\u0105, viet\u0105, i\u0161laid\u0173 profil\u012f, laiko zon\u0105 ir pan.\u00a0<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-11147\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/15141847\/Zrzut-ekranu-2022-04-12-o-13.00.02-1.png\" alt=\"\" width=\"2396\" height=\"1166\" srcset=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/15141847\/Zrzut-ekranu-2022-04-12-o-13.00.02-1.png 2396w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/15141847\/Zrzut-ekranu-2022-04-12-o-13.00.02-1-300x146.png 300w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/15141847\/Zrzut-ekranu-2022-04-12-o-13.00.02-1-1280x623.png 1280w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/15141847\/Zrzut-ekranu-2022-04-12-o-13.00.02-1-768x374.png 768w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/15141847\/Zrzut-ekranu-2022-04-12-o-13.00.02-1-1536x747.png 1536w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/15141847\/Zrzut-ekranu-2022-04-12-o-13.00.02-1-2048x997.png 2048w\" sizes=\"auto, (max-width: 2396px) 100vw, 2396px\" \/><\/p>\n<p>\u00a0<\/p>\n<p>B. Tr\u016bkstam\u0173 i\u0161tekli\u0173 veiklos ap\u017evalga<\/p>\n<p>Produktyvumo matavimas vis dar yra pagrindinis i\u0161\u0161\u016bkis \u012fmon\u0117ms - tiek naujoms, tiek turin\u010dioms senas tradicijas. Darbo laiko analiz\u0117 - produktyvaus ir neproduktyvaus, darbuotoj\u0173 laiko, skirto konkre\u010dioms u\u017eduotims atlikti, steb\u0117jimas - tai b\u016bdas, padedantis optimizuoti darb\u0105 ir prognozuoti laik\u0105 bei biud\u017eet\u0105.\u00a0<\/p>\n<p>\u00a0<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-11148\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/17152225\/timesheets_9_analyze.jpg\" alt=\"\" width=\"1914\" height=\"1490\" \/><\/p>\n<p>\u00a0<\/p>\n<p>C. Tvarkara\u0161\u010di\u0173 konfliktai<\/p>\n<p><a href=\"https:\/\/teamdeck.io\/lt\/projektu-valdymas\/projekto-tvarkarascio-konfliktai\/\" target=\"_blank\" rel=\"noopener\">Tvarkara\u0161\u010di\u0173 konfliktai<\/a> net ir labai gerai organizuotoje \u012fmon\u0117je n\u0117ra retas dalykas. Ypa\u010d programin\u0117s \u012frangos namuose, reklamos agent\u016brose ir kitose \u012f paslaugas orientuotose \u012fmon\u0117se, kuriose dirba net keli projekt\u0173 vadovai, ie\u0161kantys tinkam\u0173 i\u0161tekli\u0173. Projekt\u0173 i\u0161tekli\u0173 valdymo sistema \u012fsp\u0117ja apie u\u017esakym\u0173 dubliavim\u0105si ir - darbuotojo po\u017ei\u016briu - perteklin\u012f u\u017esakym\u0105.<\/p>\n<p><strong style=\"font-size: revert; color: initial; font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Roboto, Oxygen-Sans, Ubuntu, Cantarell, 'Helvetica Neue', sans-serif;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-11149\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/17152225\/booking_4_resolve_conflicts.jpg\" alt=\"\" width=\"1130\" height=\"590\" \/><\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p>D. Netinkamas i\u0161tekli\u0173 paj\u0117gum\u0173 planavimas<br \/>Planuojant i\u0161tekli\u0173 paj\u0117gumus galima i\u0161vengti v\u0117lavim\u0173 paskutin\u0119 minut\u0119. Paj\u0117gumas apibr\u0117\u017eia i\u0161teklius, kuriuos galima panaudoti konkre\u010diai u\u017eduo\u010diai atlikti.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-11150 size-full\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/17152225\/booking_2_workload_capacity-1.jpg\" alt=\"Projekt\u0173 valdymo \u012frankis reikalingas norint veiksmingai valdyti projekto u\u017eduotis ir darbus.\" width=\"1220\" height=\"565\" \/>Jei projekt\u0105 \u012fgyvendinote laiku ir nevir\u0161ydami biud\u017eeto, esate teisingame kelyje. Daugelis organizacij\u0173 pradiniame projekto etape neapibr\u0117\u017eia i\u0161tekli\u0173 paj\u0117gum\u0173, tod\u0117l sunku planuoti i\u0161tekli\u0173 paskirstym\u0105.<\/p>\n<p>I\u0161tekli\u0173 paj\u0117gum\u0105 galima analizuoti naudojant i\u0161tekli\u0173 steb\u0117jim\u0105. D\u0117ka kai kuri\u0173 universali\u0173 i\u0161tekli\u0173 valdymo su projekt\u0173 valdymo priemon\u0117mis, kurios gali palengvinti \u0161\u012f i\u0161\u0161\u016bk\u012f.<\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Priklausomai nuo komandos dyd\u017eio, \u012fmon\u0117s profilio ir projekto valdymo metodikos, galite rinktis i\u0161 \u012fvairi\u0173 i\u0161tekli\u0173 valdymo \u012franki\u0173. Ties\u0105 sakant, prad\u017eioje tam galite naudoti net paprast\u0105 skai\u010diuokl\u0119 (nors patar\u010diau elgtis kitaip, nes skai\u010diuokl\u0117s gali tapti neefektyvios, kai j\u016bs\u0173 verslas augs).<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Apibendrinant \u0161\u012f skyri\u0173, idealiu atveju tinkamas <\/span><a href=\"https:\/\/teamdeck.io\/lt\/projektu-valdymas\/geriausi-istekliu-valdymo-irankiai\/\"><span style=\"font-weight: 400;\">i\u0161tekli\u0173 valdymo priemon\u0117<\/span><\/a><span style=\"font-weight: 400;\"> tur\u0117t\u0173 b\u016bti sudarytas i\u0161 tvarkara\u0161\u010dio (pvz. <a href=\"https:\/\/teamdeck.io\/lt\/projektu-valdymas\/istekliu-kalendorius\/\">i\u0161tekli\u0173 kalendorius <\/a>vaizdas), j\u016bs\u0173 i\u0161tekli\u0173 prieinamum\u0105, j\u0173 dabartinius u\u017esakymus ir darbo laiko apskaitos \u017einiara\u0161\u010dius.<\/span><\/p>\n<p style=\"text-align: justify;\">Naudingos ir pasirinktin\u0117s kategorijos arba \u017eymos, nes jos padeda lengviau nar\u0161yti po \u0161iuo metu reikalingus i\u0161teklius, filtruoti vaizd\u0105 pagal konkre\u010dias roles ar projektus ir pan.<\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Galiausiai galite pasirinkti \u012frank\u012f su integruotu ataskait\u0173 skyriumi, kuriame surinktus duomenis gal\u0117site lengvai naudoti analizuodami <a href=\"https:\/\/teamdeck.io\/lt\/projektu-valdymas\/komandos-darbo-kruvio-valdymas\/\">komandos darbo kr\u016bvis<\/a>, <a href=\"https:\/\/teamdeck.io\/lt\/irankiu-dezute\/sekite-savo-projektu-biudzeta-su-teamdeck\/\">projekt\u0173 biud\u017eetai<\/a>arba \u012fmon\u0117s investicij\u0173 gr\u0105\u017e\u0105.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Kuo i\u0161samesnis (ta\u010diau ai\u0161kesnis) vaizdas, tuo daugiau \u012f\u017evalg\u0173 galite i\u0161 jo gauti.<\/span><\/p>\n<p data-pm-slice=\"1 3 []\">\u00a0<\/p>\n<h2 data-pm-slice=\"1 3 []\"><strong>Kokiame projekte dalyvauja i\u0161tekli\u0173 valdytojas? Kokios yra jo priklausomyb\u0117s?<\/strong><\/h2>\n<h3><strong>Projekto i\u0161tekli\u0173 vadovo vaidmuo ir atsakomyb\u0117<\/strong><\/h3>\n<p><span data-color=\"var(--red-10)\">I\u0161 betterteam.com - \u017emogi\u0161k\u0173j\u0173 i\u0161tekli\u0173 pramon\u0117s \u012fmon\u0117s:<\/span><\/p>\n<blockquote>\n<p><span data-color=\"var(--red-10)\">I\u0161tekli\u0173 vadybininkai padeda projekt\u0173 vadovams planuoti \u017emogi\u0161kuosius i\u0161teklius ir paskirstyti darbuotojus. Jie nustato \u012fmon\u0117s paj\u0117gumus patenkinti projekt\u0173 personalo poreik\u012f, paskirsto darbuotojus projektams ir samdo naujus darbuotojus. Jie taip pat gali tvarkyti darbo u\u017emokes\u010dio apskait\u0105 ir mokyti darbuotojus.<\/span><\/p>\n<\/blockquote>\n<p><span data-color=\"var(--red-10)\">Kad geriau \u012fsivaizduotume \u0161io skyriaus pagrindin\u012f vaidmen\u012f - i\u0161tekli\u0173 planuotoj\u0105 - pasinaudokime tam tikru palyginimu. Palyginimas pagr\u012fstas supaprastintu i\u0161tekli\u0173 valdytoj\u0173 ir projekt\u0173 vadov\u0173 skirtumu. Taigi, projekt\u0173 vadovai veikia projekto lygmeniu - jie koordinuoja grup\u0119 projekt\u0173 (da\u017eniausiai susijusi\u0173 tarpusavyje) arba tik vien\u0105 projekt\u0105. Jie atsakingi u\u017e tai, kad projekto komanda j\u012f u\u017ebaigt\u0173. Tuo tarpu i\u0161tekli\u0173 vadovai veikia \u012fmon\u0117s lygmeniu. Atrenka, paskirsto ir suderina tinkamai kvalifikuotus i\u0161teklius keliems projektams.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-medium\" src=\"https:\/\/media.giphy.com\/media\/oyPTTOQMtuzthM5xKX\/giphy.gif\" alt=\"I\u0161tekli\u0173 valdymo planas yra akivaizd\u017eiai svarbi vidaus ir i\u0161or\u0117s i\u0161tekli\u0173 valdymo dalis.\" width=\"480\" height=\"360\" \/><\/p>\n<p><span data-color=\"var(--red-10)\">Projekt\u0173 vadov\u0173 asociacija Kirsten Bird l\u016bpomis si\u016blo toki\u0105 m\u016bs\u0173 \u017evaig\u017ed\u0117s reik\u0161m\u0119.<\/span><\/p>\n<blockquote>\n<p><span data-color=\"var(--red-10)\">Projekto specialistas, planuodamas projekt\u0105, turi nustatyti darbui atlikti reikalingus i\u0161teklius ir, sudarydamas tvarkara\u0161t\u012f, nustatyti, kada tie i\u0161tekliai bus reikalingi.<\/span><\/p>\n<\/blockquote>\n<p><span data-color=\"var(--red-10)\">Ypa\u010d nor\u0117tume pabr\u0117\u017eti pirm\u0105j\u0105 dal\u012f, kurioje sakoma \"Turi nustatyti...\". Kod\u0117l ji tokia svarbi? Pirmiausia, bet ne svarbiausia, nes tai yra i\u0161eities ta\u0161kas. Kalbant apie i\u0161tekli\u0173 valdymo aspektus, da\u017eniausiai pabr\u0117\u017eiamas jo esm\u0119 sudarantis planavimas. \u010cia matome, kas yra gero planavimo pagrindas - mink\u0161tieji \u012fg\u016bd\u017eiai, ypa\u010d puiki akis ir jausmas bendraujant su \u017emon\u0117mis. <\/span><\/p>\n<p>Dabar at\u0117jo laikas <span data-color=\"var(--red-10)\">I\u0161tekli\u0173 vadybininko pareigos:<\/span><\/p>\n<ul>\n<li><span data-color=\"var(--red-10)\">\u012eg\u016bd\u017eiais pagr\u012fstas darbuotoj\u0173 u\u017eimtumo tikrinimas ir priskyrimas projektams, kurie pad\u0117s u\u017ebaigti projekt\u0105 per nurodyt\u0105 laik\u0105 ir biud\u017eet\u0105.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\">Darbuotoj\u0173 u\u017eimtumo, darbo kr\u016bvio ir vir\u0161valand\u017ei\u0173 steb\u0117jimas<\/span><\/li>\n<li><span data-color=\"var(--red-10)\">Proces\u0173 dokumentavimas ir \u012fra\u0161\u0173 tvarkymas<\/span><\/li>\n<li><span data-color=\"var(--red-10)\">Bendradarbiavimas su vidaus padaliniais ir tinkamo atitinkam\u0173 darbuotoj\u0173 skai\u010diaus u\u017etikrinimas.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\">Projekt\u0173 vadovams nuolat teikti su i\u0161tekli\u0173 valdymu susijusi\u0105 param\u0105.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\">I\u0161tekli\u0173 problem\u0173 ma\u017einimas perskirstant darbuotojus, per\u017ei\u016brint tikslus arba skiriant papildom\u0105 komand\u0105.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\">Nauj\u0173 \u017emoni\u0173 \u012fdarbinimas pagal \u012fmon\u0117s ar projekto reikalavimus.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\">Pagalba vykdant \u017emogi\u0161k\u0173j\u0173 i\u0161tekli\u0173 procesus, pvz., s\u0105skait\u0173 fakt\u016br\u0173 i\u0161ra\u0161ym\u0105, darbuotoj\u0173 mokym\u0105, darbo u\u017emokes\u010dio administravim\u0105, kompensacijas ir kt.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\">nuolat informuoti apie i\u0161tekli\u0173 valdymo ir darbo \u012fstatym\u0173 tendencijas.<\/span><\/li>\n<\/ul>\n<h3><strong style=\"color: revert; font-size: revert; font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Roboto, Oxygen-Sans, Ubuntu, Cantarell, 'Helvetica Neue', sans-serif;\">Projekto i\u0161tekli\u0173 vadovo \u017eini\u0173 apimtis<\/strong><\/h3>\n<p><span data-color=\"var(--red-10)\">Projekt\u0173 valdymo \u017eini\u0173 s\u0105vado (PMBOK) pateiktos \u017eini\u0173 sritys.<\/span><\/p>\n<ul>\n<li><span data-color=\"var(--red-10)\"><strong>Integracijos valdymas:<\/strong> Naudojasi \u012fvairiais projekt\u0173 valdymo procesais ir metodikomis, kad sukurt\u0173 strategij\u0105, padedan\u010di\u0105 komandoms geriau dirbti kartu.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\"><strong>Apimties valdymas:<\/strong> Projekto u\u017eduotys, rezultatai ir etapai nustatomi, apibr\u0117\u017eiami ir kontroliuojami taikant proces\u0105, kuris apima suinteresuot\u0173j\u0173 \u0161ali\u0173 reikalavim\u0173 rinkim\u0105, darb\u0173 suskirstymo strukt\u016bros (WBS) k\u016brim\u0105, o v\u0117liau - poky\u010di\u0173 steb\u0117jim\u0105 ir valdym\u0105.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\"><strong>Tvarkara\u0161\u010dio valdymas:<\/strong> sukuria realisti\u0161k\u0105 projekto tiksl\u0173 \u012fgyvendinimo tvarkara\u0161t\u012f.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\"><strong>I\u0161laid\u0173 valdymas:<\/strong> Procesas, kurio metu planuojamos ir kontroliuojamos su projektu susijusios i\u0161laidos. Tai rei\u0161kia, kad reikia rinkti, analizuoti ir teikti ataskaitas apie i\u0161laidas, kad b\u016bt\u0173 galima prognozuoti ir steb\u0117ti projekto biud\u017eet\u0105, siekiant i\u0161vengti pernelyg dideli\u0173 i\u0161laid\u0173.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\"><strong>Kokyb\u0117s valdymas:<\/strong> pri\u017ei\u016br\u0117ti vis\u0105 veikl\u0105, susijusi\u0105 su projekto rezultat\u0173 k\u016brimu, siekiant u\u017etikrinti, kad jie atitikt\u0173 kokyb\u0117s l\u016bkes\u010dius. Tai atliekama toliau vertinant kokyb\u0119 viso projekto vykdymo metu ir taisant bet kokius nukrypimus nuo kokyb\u0117s l\u016bkes\u010di\u0173.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\"><strong>I\u0161tekli\u0173 valdymas:<\/strong> kuo geriau i\u0161naudoti projektui vykdyti reikalingus \u017emones, med\u017eiagas ir \u012frang\u0105, paskirstant ir perskirstant i\u0161teklius pagal poreik\u012f.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\"><strong>Komunikacijos valdymas:<\/strong> Projekte ai\u0161kiems prane\u0161imams pateikti naudojami \u012fvair\u016bs procesai. Tai apima kanal\u0173 k\u016brim\u0105, da\u017enum\u0105 ir teising\u0105 prane\u0161im\u0173 siuntim\u0105, siekiant u\u017etikrinti, kad jie b\u016bt\u0173 gauti laiku ir suprasti.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\"><strong>Rizikos valdymas:<\/strong> Nustatyti, \u012fvertinti ir u\u017ekirsti keli\u0105 arba suma\u017einti projekto rizik\u0105, nesvarbu, ar tai b\u016bt\u0173 neigiama rizika, kurios reikia vengti, ar teigiama rizika, kuri\u0105 reikia i\u0161naudoti.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\"><strong>Vie\u0161\u0173j\u0173 pirkim\u0173 valdymas:<\/strong> U\u017emegzti ir palaikyti ry\u0161ius su i\u0161oriniais i\u0161tekliais, reikalingais j\u016bs\u0173 projektui. Tai apima pardav\u0117jus, kurie parduoda produktus ir paslaugas, reikalingas projekto tikslams pasiekti.<\/span><\/li>\n<li><span data-color=\"var(--red-10)\"><strong>Suinteresuot\u0173j\u0173 \u0161ali\u0173 valdymas:<\/strong> nustatyti projekto suinteresuot\u0105sias \u0161alis, nustatyti j\u0173 l\u016bkes\u010dius ir \u012ftak\u0105, o tada parengti strategijas, kaip jas valdyti ir informuoti apie pa\u017eang\u0105.<\/span><\/li>\n<\/ul>\n<h2><strong>Projekto i\u0161tekli\u0173 valdymo strategijos<\/strong><\/h2>\n<h3 id=\"3\" style=\"text-align: justify;\">A. I\u0161tekli\u0173 paskirstymas<\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Atsi\u017evelgdami \u012f savo darbuotoj\u0173 \u012fg\u016bd\u017eius ir galimybes, tur\u0117tum\u0117te sudaryti darbuotoj\u0173, kuriuos galima paskirti projektui, s\u0105ra\u0161\u0105. Tur\u0117dami jau atrinkt\u0173 darbuotoj\u0173, kurie prisijungs prie j\u016bs\u0173 projekto, s\u0105ra\u0161\u0105, galite juos u\u017esakyti pasirinktoje priemon\u0117je.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-medium\" src=\"https:\/\/media.giphy.com\/media\/8IGuMMq3Aka8Zq9Kax\/giphy.gif\" alt=\"I\u0161tekli\u0173 valdymo planas numato, kaip projekto i\u0161tekli\u0173 valdymas svarbus siekiant kontroliuoti i\u0161teklius, reikalingus u\u017eduotims u\u017ebaigti.\" width=\"480\" height=\"343\" \/><\/p>\n<p style=\"text-align: justify;\">Kaip <a href=\"https:\/\/teamdeck.io\/lt\/projektu-valdymas\/istekliu-paskirstymas-projektu-vadovams\/\" target=\"_blank\" rel=\"noopener noreferrer\">i\u0161tekli\u0173 paskirstymas<\/a> tai procesas, kurio metu siekiama kuo geriau i\u0161naudoti turimus i\u0161teklius, tod\u0117l tur\u0117tum\u0117te steb\u0117ti j\u0173 na\u0161um\u0105 ir panaudojim\u0105. \u0160is \u017emogi\u0161k\u0173j\u0173 i\u0161tekli\u0173 valdymo aspektas pad\u0117s jums i\u0161vengti nepakankamo ar per didelio i\u0161tekli\u0173 panaudojimo ir u\u017ekirsti keli\u0105 darbuotoj\u0173 perdegimui.<\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Kiti i\u0161tekli\u0173 paskirstymo privalumai:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">geresnis vis\u0173 \u012fmon\u0117s i\u0161tekli\u0173 matomumas.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">tikslesni u\u017esakymai<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">lengvesn\u0117s derybos d\u0117l u\u017esakym\u0173 su kitais PM.<\/span><\/span><\/li>\n<\/ul>\n<h3>B. I\u0161tekli\u0173 naudojimas<\/h3>\n<p>Stebite, kiek darbo atlieka j\u016bs\u0173 \u017emogi\u0161kieji, techniniai, mechaniniai ir kiti i\u0161tekliai, taip pat stebite, kiek valand\u0173 jie dirba. Jums ypa\u010d r\u016bp\u0117s nepakankamai arba per daug i\u0161naudojami i\u0161tekliai (perskirstymas).<\/p>\n<h3>C. I\u0161tekli\u0173 i\u0161lyginimas<\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Jei galite pakoreguoti projekto tvarkara\u0161t\u012f, kad b\u016bt\u0173 laikomasi projekto termino, galite naudoti i\u0161tekli\u0173 lygiavim\u0105. Nor\u0117dami pakeisti tvarkara\u0161t\u012f naudodami i\u0161tekli\u0173 i\u0161lyginim\u0105, padalykite arba sujunkite veiklas pagal i\u0161tekli\u0173 prieinamum\u0105, kad neb\u016bt\u0173 per ma\u017eai arba per daug i\u0161naudot\u0173 projekto komandos nari\u0173.<\/span><\/p>\n<h3>D. I\u0161tekli\u0173 prognozavimas<\/h3>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-10487 size-full\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2022\/05\/09115328\/timesheets_6_simplify-forecasting.jpg\" alt=\"\" width=\"2074\" height=\"1506\" \/><\/p>\n<p>I\u0161tekli\u0173 vadovas, kuris gerai atlieka savo darb\u0105 ir i\u0161mano savo skai\u010dius, gal\u0117s pakankamai tiksliai numatyti, kiek darbo jo komanda gali atlikti per tam tikr\u0105 laikotarp\u012f. Tai leid\u017eia komandai ir \u012fmonei tiksliai pasirengti ir planuoti b\u016bsimus \u012fsipareigojimus.<\/p>\n<p>\u00a0<\/p>\n<h2 id=\"2\" style=\"text-align: justify;\"><strong>Auk\u0161to lygio planavimas ir projekto i\u0161tekli\u0173 valdymas<\/strong><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Dabar, kai jau \u017einote, kas yra i\u0161tekli\u0173 valdymas, turite parengti plan\u0105. Ir ne bet kok\u012f plan\u0105, kad gal\u0117tum\u0117te efektyviai valdyti keli\u0173 projekt\u0173 i\u0161teklius, turite tur\u0117ti auk\u0161to lygio plan\u0105 kiekvienam projektui.<\/span><\/p>\n<h3 style=\"text-align: justify;\"><strong>Auk\u0161to lygio planavimas<\/strong><\/h3>\n<p style=\"text-align: justify;\"><a href=\"https:\/\/teamdeck.io\/lt\/projektu-valdymas\/auksto-lygio-planavimas-naudojant-teamdeck-jusu-komandu-sekmei-uztikrinti\/\"><span style=\"font-weight: 400;\">Auk\u0161to lygio planavimas<\/span><\/a><span style=\"font-weight: 400;\"> tai projekto vadovo po\u017ei\u016bris \u012f j\u012f:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">tikslas, <\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">verslo tikslai, <\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">apribojimai, <\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">\u017emoni\u0173, reikaling\u0173 jai pristatyti, <\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">terminai ir biud\u017eetas.<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Projekto i\u0161tekli\u0173 valdymo srityje auk\u0161to lygio planas padeda atsakyti \u012f klausim\u0105: \"Koki\u0173 vaidmen\u0173 man reikia, kad projektas b\u016bt\u0173 s\u0117kmingai \u012fgyvendintas laiku ir nevir\u0161ijant biud\u017eeto?\"<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Kurdami auk\u0161to lygio plan\u0105, dar neturite sudaryti i\u0161samaus vis\u0173 u\u017eduo\u010di\u0173 s\u0105ra\u0161o. Vietoj to turite \u012ftraukti:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\"><b>Tikslai<\/b><span style=\"font-weight: 400;\"> -Jie padeda suprasti, k\u0105 reikia pasiekti \u012fgyvendinant projekt\u0105.<\/span><\/li>\n<li style=\"font-weight: 400;\"><b>Laiko nustatymas<\/b><span style=\"font-weight: 400;\"><span style=\"font-weight: 400;\"> - padeda suprasti.\u00a0<\/span><\/span><span data-preserver-spaces=\"true\">koks yra projekto \u012fgyvendinimo terminas ir ar tai \u012fmanoma su j\u016bs\u0173 turimais i\u0161tekliais.<\/span><\/li>\n<li style=\"font-weight: 400;\"><b>Komanda<\/b><span style=\"font-weight: 400;\"> - tai leid\u017eia suprasti, koki\u0173 vaidmen\u0173 reikia projektui.<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Tur\u0117dami auk\u0161to lygio plan\u0105, galite geriau \u012fvertinti savo i\u0161tekli\u0173 paj\u0117gumus ir projekto apimt\u012f.<\/span><\/p>\n<h3 style=\"text-align: justify;\"><strong>I\u0161tekli\u0173 planavimas\u00a0<\/strong><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Tur\u0117dami auk\u0161to lygio plan\u0105, galite susidaryti bendr\u0105 vaizd\u0105, ko reikia projektui \u012fgyvendinti. Taip pat jau min\u0117jome, kad jis padeda suprasti, koki\u0173 vaidmen\u0173 reikia jam \u012fgyvendinti. Ta\u010diau kaip tiksliai nustatyti \u0161iuos vaidmenis prie\u0161 juos paskiriant \u0161iam naujam projektui?<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Pagal tarptautiniu mastu \u017einomo Projekt\u0173 valdymo instituto parengt\u0105 standart\u0105 PMBOK\u00ae, <\/span><a href=\"https:\/\/teamdeck.io\/lt\/projektu-valdymas\/istekliu-planavimas-projektu-valdyme\/\"><span style=\"font-weight: 400;\">i\u0161tekli\u0173 planavimas<\/span><\/a><span style=\"font-weight: 400;\"> tai \"nustatyti, kokie i\u0161tekliai (\u017emon\u0117s, \u012franga, med\u017eiagos ir t. t.) ir koks j\u0173 kiekis tur\u0117t\u0173 b\u016bti naudojamas projekto veiklai vykdyti\".<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Naudojant <a href=\"https:\/\/www.projectmanager.com\/training\/what-is-a-work-breakdown-structure?msID=3a3b4e36-7937-4484-aa6b-278ff5febaa0\">darb\u0173 suskirstymo strukt\u016bra<\/a>, numatom\u0105 trukm\u0119 arba istorinius duomenis, galite nustatyti:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">darbuotoj\u0173, turin\u010di\u0173 \u012fg\u016bd\u017ei\u0173, reikaling\u0173 projektui \u012fgyvendinti, s\u0105ra\u0161\u0105,<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">j\u0173 dabartinius u\u017esakymus ir laisvas vietas,<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">j\u0173 prieinamum\u0105 viso projekto metu.<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\">Sudar\u0119 darbuotoj\u0173, kuriuos galite u\u017esakyti nesukeldami tvarkara\u0161\u010di\u0173 konflikt\u0173, s\u0105ra\u0161\u0105, galite juos paskirti savo projektui.<\/p>\n<h3 style=\"text-align: justify;\"><strong>Efektyvus b\u016bsim\u0173 projekt\u0173 planavimas - pagrindinis projekto i\u0161tekli\u0173 planavimo tikslas.<\/strong><\/h3>\n<p style=\"text-align: justify;\">Tur\u0117dami auk\u0161to lygio planus visiems vykdomiems projektams ir \u017einodami, kaip \u0161iuo metu panaudoti i\u0161teklius, \u017einote savo paj\u0117gumus ir \u012fmon\u0117s planus.<\/p>\n<p style=\"text-align: justify;\"><span data-preserver-spaces=\"true\">Dabar, kai j\u016bs\u0173 \u012fmon\u0117 laimi naujus projektus, galite greitai atsakyti \u012f \u0161iuos klausimus:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li><span data-preserver-spaces=\"true\">Ar galite vykdyti \u0161iuos projektus, pavyzd\u017eiui, nesamdydami daugiau \u017emogi\u0161k\u0173j\u0173 i\u0161tekli\u0173 (darbuotoj\u0173 ar laisvai samdom\u0173 darbuotoj\u0173)?\u00a0<\/span><\/li>\n<li><span data-preserver-spaces=\"true\">Kada galite prad\u0117ti ir koki\u0105 \u012ftak\u0105 tai turi j\u016bs\u0173 rezultatams? Tai galite patikrinti, pavyzd\u017eiui, apskai\u010diuodami ne tik projekto pelningum\u0105, bet ir galim\u0173 \u012fdarbinimo proces\u0173 s\u0105naudas.<\/span><\/li>\n<\/ul>\n<h2 style=\"text-align: justify;\"><strong>Projekto \u012ftraukimas \u012f projekt\u0105 kaip veiksmingo projekto i\u0161tekli\u0173 valdymo dalis<\/strong><\/h2>\n<p style=\"text-align: justify;\"><a href=\"https:\/\/teamdeck.io\/lt\/projektu-valdymas\/projekto-itraukimas-i-projekta\/\" target=\"_blank\" rel=\"noopener noreferrer\">Projekto \u012ftraukimas \u012f darb\u0105<\/a> yra svarbi <a href=\"https:\/\/teamdeck.io\/lt\/projektu-valdymas\/projekto-istekliu-valdymas\/\" target=\"_blank\" rel=\"noopener noreferrer\">veiksmingas i\u0161tekli\u0173 valdymas<\/a>. Supa\u017eindinkite komandos narius su projekto, prie kurio jie dirbs, tikslais, u\u017edaviniais ir rezultatais. Tokia strategija padidins <a href=\"https:\/\/teamdeck.io\/lt\/komandine-laime\/projekto-skaidrumas\/\" target=\"_blank\" rel=\"noopener noreferrer\">projekto skaidrumas<\/a> ir pad\u0117s jums, kaip ministrui pirmininkui, \u012fgyti komandos pasitik\u0117jim\u0105.<\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">\u0160i\u0105 proceso dal\u012f sudaro 4 etapai:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Projekto informacijos perdavimas komandai - dokumentai, kuriuos galite naudoti, apima rezultat\u0173 s\u0105ra\u0161\u0105 (pvz, <\/span><span style=\"font-weight: 400;\">Verslo reikalavim\u0173 dokumentas<\/span><span style=\"font-weight: 400;\">), projekto tvarkara\u0161tis, dabartinis darb\u0173 apra\u0161as (angl.<\/span><span style=\"font-weight: 400;\">SOW<\/span><span style=\"font-weight: 400;\">) ir kassavaitin\u0119 projekto b\u016bkl\u0117s ataskait\u0105.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Priskirkite komandos narius tinkamam projektui <\/span><span style=\"font-weight: 400;\">i\u0161tekli\u0173 valdymo priemon\u0117<\/span><span style=\"font-weight: 400;\"> naudojate (nebent tai jau padar\u0117te).<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Nustatykite bendradarbiavimo \u012frankius ir ry\u0161i\u0173 kanalus ir suteikite komandos nariams prieig\u0105 prie t\u0173, kuri\u0173 jiems prireiks dirbant su projektu.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Surenkite \u012fvadin\u0119 sesij\u0105.<\/span><\/li>\n<\/ul>\n<h2 id=\"4\" style=\"text-align: justify;\"><strong>Projekt\u0173 ir i\u0161tekli\u0173 planavimo metodai<\/strong><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Nor\u0117dami suderinti projekto tvarkara\u0161t\u012f, turimus i\u0161teklius ir apimt\u012f, naudokite i\u0161tekli\u0173 planavim\u0105. Jis labai svarbus, nes parodo, kada tiksliai reik\u0117s tam tikr\u0173 i\u0161tekli\u0173, kad gal\u0117tum\u0117te atitinkamai planuoti u\u017esakymus. Nepamir\u0161kite, kad priskirdami \u017emones projektams nepamir\u0161kite steb\u0117ti i\u0161tekli\u0173 prieinamumo.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Yra keletas <\/span><a href=\"https:\/\/teamdeck.io\/lt\/projektu-valdymas\/projektu-planavimo-metodai\/\"><span style=\"font-weight: 400;\">projekt\u0173 planavimo metodai<\/span><\/a><span style=\"font-weight: 400;\"> galite naudoti:<\/span><\/p>\n<h3 style=\"text-align: justify;\"><strong>A. Kritinio kelio metodas<\/strong><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Svetain\u0117 <\/span><a href=\"https:\/\/hbr.org\/1963\/09\/the-abcs-of-the-critical-path-method\"><span style=\"font-weight: 400;\">Kritinio kelio metodas<\/span><\/a><span style=\"font-weight: 400;\"> (CPM) - tai metodas, naudojamas ilgiausiam \u012fmanomam projekto u\u017ebaigimo laikui nustatyti. Sudar\u0119 vis\u0173 u\u017eduo\u010di\u0173 s\u0105ra\u0161\u0105 ir suskirst\u0119 jas \u012f kritines ir kintamas kategorijas, galite apskai\u010diuoti terminus ir pa\u017eym\u0117ti u\u017eduo\u010di\u0173 tarpusavio priklausomyb\u0119.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Nor\u0117dami sukurti u\u017eduo\u010di\u0173 sraut\u0105 naudodami CPM metod\u0105, turite:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">projekto apimt\u012f,<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">vis\u0173 u\u017eduo\u010di\u0173, reikaling\u0173 jam u\u017ebaigti, s\u0105ra\u0161\u0105.<\/span><\/li>\n<\/ul>\n<h3 style=\"text-align: justify;\"><strong>B. Programos vertinimo ir per\u017ei\u016bros metodas<\/strong><\/h3>\n<p style=\"text-align: justify;\"><a href=\"https:\/\/www.techopedia.com\/definition\/12112\/program-evaluation-and-review-technique-pert\"><span style=\"font-weight: 400;\">Programos vertinimo ir per\u017ei\u016bros metodas<\/span><\/a><span style=\"font-weight: 400;\"> (PERT) - tai metodas, pana\u0161us \u012f CPM, ta\u010diau apskai\u010diuojant galimus terminus naudojamas svertinis trukm\u0117s vidurkis, o ne \u012fver\u010diai.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Naudodami PERT metod\u0105 taip pat tur\u0117site sudaryti u\u017eduo\u010di\u0173 s\u0105ra\u0161\u0105 su j\u0173 tarpusavio priklausomyb\u0117mis, \u012fskaitant etapus ir numatom\u0105 kiekvienos u\u017eduoties trukm\u0119. Remdamiesi \u0161ia informacija, galite \u012fvertinti projekto terminus trimis patikimumo lygiais:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Optimistinis laikas<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Labiausiai tik\u0117tinas laikas<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Pesimistinis laikas<\/span><\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium aligncenter\" src=\"https:\/\/media.giphy.com\/media\/cApRuznZiLJo246DmE\/giphy.gif\" alt=\"Nor\u0117damas \u012fsigyti projektams u\u017ebaigti reikaling\u0173 i\u0161tekli\u0173, i\u0161tekli\u0173 valdytojas turi tur\u0117ti i\u0161sami\u0173 \u017eini\u0173.\" width=\"480\" height=\"270\" \/><\/p>\n<h3 style=\"text-align: justify;\"><strong>C. Paspartintas<\/strong><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Spartus planavimas - tai paprastas planavimo metodas, kur\u012f naudoja projekt\u0173 vadovai, nor\u0117dami nustatyti, kurias u\u017eduotis galima atlikti vienu metu. \u017dinodami projekto u\u017eduo\u010di\u0173 tarpusavio priklausomyb\u0119, \u017einote, kurioms u\u017eduotims atlikti prie\u0161 tai reikia atlikti kitas u\u017eduotis. Pana\u0161iai galite i\u0161vardyti u\u017eduotis, kurios gali bent i\u0161 dalies sutapti, kad gal\u0117tum\u0117te paspartinti projekto \u012fgyvendinim\u0105.<\/span><\/p>\n<h3 style=\"text-align: justify;\"><strong>D. Sutrik\u0119s<\/strong><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Jei naudojant greit\u0105j\u012f sekim\u0105 nepavyko sutaupyti norimo laiko, galite naudoti sutriu\u0161kinimo metod\u0105. Ta\u010diau tai kainuoja, nes, nor\u0117dami paspartinti projekt\u0105, turite prid\u0117ti laiko. Tai galima padaryti, pavyzd\u017eiui, pridedant apmokamus vir\u0161valand\u017eius - galiausiai projekto kaina bus didesn\u0117, bet vis tiek gal\u0117site tilpti \u012f nustatyt\u0105 termin\u0105.<\/span><\/p>\n<p style=\"text-align: justify;\">\u00a0<\/p>\n<h2 id=\"5\" style=\"text-align: justify;\"><strong>Matavimas ir ataskait\u0173 teikimas<\/strong><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Remdamiesi duomenimis, kuriuos surinksite \u012fdieg\u0119 i\u0161tekli\u0173 valdym\u0105, pvz., darbuotoj\u0173 rezervuotu laiku, darbo laiko \u012fra\u0161ais ir u\u017eimtumu, galite \u012fvertinti j\u0173 veiklos rezultatus ir kitus verslo rodiklius.<\/span><\/p>\n<h3 style=\"text-align: justify;\"><strong>I\u0161tekli\u0173 naudojimo matavimas<\/strong><\/h3>\n<p style=\"text-align: justify;\"><a href=\"https:\/\/teamdeck.io\/lt\/projektu-valdymas\/kaip-ismatuoti-istekliu-panaudojima\/\"><span style=\"font-weight: 400;\">I\u0161tekli\u0173 panaudojimo matavimas<\/span><\/a><span style=\"font-weight: 400;\"> pagal paprast\u0105 formul\u0119:<\/span><\/p>\n<p style=\"text-align: justify;\"><i><span style=\"font-weight: 400;\">I\u0161tekli\u0173 panaudojimas = u\u017eimtas laikas \/ turimas laikas<\/span><\/i><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Nesvarbu, ar naudojate skai\u010diuokl\u0119, ar i\u0161tekli\u0173 valdymo \u012frank\u012f, galite j\u012f naudoti nor\u0117dami palyginti u\u017esakymus su u\u017eimtumu. Gautas rodiklis parodo, ar efektyviai i\u0161naudojate darbuotoj\u0173 laik\u0105, ar jie i\u0161naudojami per daug arba nepakankamai.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Pana\u0161iai galite naudoti \u0161\u012f rodikl\u012f, nor\u0117dami palyginti apmokam\u0105 laik\u0105 su darbuotoj\u0173 u\u017eregistruotu darbo laiku. Taip gal\u0117site nustatyti, ar produktyviai naudojate savo i\u0161teklius.<\/span><\/p>\n<p>\u00a0<\/p>\n<h3 style=\"text-align: justify;\"><strong>Projekto biud\u017eeto apskai\u010diavimas<\/strong><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Rinkdami u\u017esakym\u0173 ir darbo laiko apskaitos \u017einiara\u0161\u010di\u0173 duomenis, galite <\/span><span style=\"font-weight: 400;\">apskai\u010diuokite savo projekto biud\u017eet\u0105.<\/span><span style=\"font-weight: 400;\">taip pat. Jais netgi galite sekti biud\u017eet\u0105 viso projekto metu ir steb\u0117ti, ar nevir\u0161ijate numatyt\u0173 i\u0161laid\u0173, ar ne.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-10489 size-full\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2022\/05\/09115249\/timesheets_8_compare_estimates.jpg\" alt=\"\" width=\"1958\" height=\"1092\" \/><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Pavyzd\u017eiui, galite palyginti u\u017esakymus su darbo laiko apskaitos \u017einiara\u0161\u010diais, kad pamatytum\u0117te, ar u\u017eregistruotas darbo laikas atitinka j\u016bs\u0173 s\u0105matas, ar ne. Tada, \u017einodami savo darbuotoj\u0173 valandinius \u012fkainius, galite apskai\u010diuoti faktines laiko, kur\u012f jie praleido projekte, s\u0105naudas ir nustatyti faktin\u012f biud\u017eet\u0105.<\/span><\/p>\n<p style=\"text-align: justify;\"><span data-preserver-spaces=\"true\">V\u0117lgi, tam galite naudoti skai\u010diuokl\u0119, bet bus daug patogiau naudoti i\u0161tekli\u0173 valdymo \u012frank\u012f su\u00a0<\/span><a class=\"_e75a791d-denali-editor-page-rtfLink\" href=\"https:\/\/teamdeck.io\/lt\/pranesa\/\" target=\"_blank\" rel=\"noopener\"><span data-preserver-spaces=\"true\">ataskait\u0173 teikimo funkcijos<\/span><\/a><span data-preserver-spaces=\"true\">.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><strong>Prad\u0117kite efektyviau valdyti komandas jau \u0161iandien - naudokite i\u0161tekli\u0173 valdymo sistem\u0105<\/strong><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Projektas <a href=\"https:\/\/teamdeck.io\/lt\/irankiu-dezute\/taupyti-pinigus-valdant-isteklius\/\" target=\"_blank\" rel=\"noopener\">i\u0161tekli\u0173 valdymas taupo pinigus.<\/a>. Nors i\u0161 pirmo \u017evilgsnio tai gali atrodyti sud\u0117tinga, i\u0161 ties\u0173 n\u0117ra taip jau sunku, kai tai suprasite. \u012etraukite j\u012f \u012f savo komandos projekt\u0173 valdymo proces\u0105 ir visada naudokite tinkamus i\u0161teklius ir tinkam\u0105 laik\u0105.\u00a0<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">\u012edieg\u0119 i\u0161tekli\u0173 valdymo sistem\u0105 galite sutaupyti daug vargo. \"Teamdeck\" yra tokios sistemos pavyzdys <a href=\"https:\/\/teamdeck.io\/lt\/\">projekt\u0173 i\u0161tekli\u0173 valdymo programin\u0117 \u012franga<\/a>, kurioje derinamas i\u0161tekli\u0173 planavimas, darbo laiko steb\u0117jimas, atostog\u0173 valdymas ir pasirinktin\u0117s ataskaitos. Naudodamiesi \u0161ia priemone galite lengvai prid\u0117ti u\u017esakym\u0173, registruoti laiko \u012fra\u0161us, valdyti ir koreguoti kalendori\u0173 ir pagal \u0161iuos duomenis apskai\u010diuoti pasirinktus rodiklius.<\/span><\/p>\n<p>Norite b\u016bti <a href=\"https:\/\/teamdeck.io\/lt\/teamdeck\/efektyvus-istekliu-valdymas-teamdeck\/\" target=\"_blank\" rel=\"noopener\">efektyvus i\u0161tekli\u0173 valdytojas<\/a>? Ie\u0161kote <a href=\"https:\/\/teamdeck.io\/lt\/projektu-valdymas\/nemokami-istekliai-projektu-vadovams-2020-m\/\" target=\"_blank\" rel=\"noopener\">nemokami i\u0161tekliai projekt\u0173 vadovams<\/a>? Ar norite su\u017einoti <a href=\"https:\/\/teamdeck.io\/lt\/teamdeck\/kodel-imones-renkasi-teamdeck\/\" target=\"_blank\" rel=\"noopener\">kod\u0117l \u012fmon\u0117s renkasi \"Teamdeck<\/a> kaip j\u0173 pa\u0161to sprendim\u0105 projekt\u0173 i\u0161tekli\u0173 valdymui? Vis dar ne\u017einau, kod\u0117l projektas <a href=\"https:\/\/teamdeck.io\/lt\/projektu-valdymas\/kodel-svarbus-istekliu-valdymas\/\" target=\"_blank\" rel=\"noopener\">i\u0161tekli\u0173 valdymas yra svarbus.<\/a>?<\/p>\n<div class=\"vc_row wpb_row vc_row-fluid redl-row-section feature-row vc_custom_1574416816256 vc_row-o-equal-height vc_row-o-content-middle vc_row-flex padding-medium bgv-default bgh-default halign-center\"><\/div><div class=\"vc_row wpb_row vc_row-fluid redl-row-section vc_row-o-content-middle vc_row-flex padding-default bgv-default bgh-default halign-default\"><div class=\"wpb_column vc_column_container text-center vc_col-sm-12 padding-default bgv-default bgh-default halign-center\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\">\n\t<div class=\"wpb_text_column wpb_content_element\" >\n\t\t<div class=\"wpb_wrapper\">\n\t\t\t<h2 class=\"ql-align-center\" style=\"text-align: center;\"><strong>Ie\u0161kote projekto i\u0161tekli\u0173 valdymo sistemos?<\/strong><\/h2>\n\n\t\t<\/div>\n\t<\/div>\n<a class=\"redl-btn   vc_custom_1596025898618 redl-btn-medium redl-btn-69d91e7c70a60 btn-icon-left redl-btn redl-btn-two vc_custom_1551260371526 redl-btn-medium redl-btn-5f2168a4adf5d btn-hover-one btn-icon-right signup-top\" href=\"https:\/\/app.teamdeck.io\/register\">Gaukite 30 dien\u0173 NEMOKAM\u0104 bandom\u0105j\u0105 versij\u0105<\/a><div class=\"vc_empty_space\"   style=\"height: 32px\" ><span class=\"vc_empty_space_inner\"><\/span><\/div>\n<\/div><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"Vadovaudami projektui, j\u016bs ne tik valdote u\u017eduotis, kuri\u0173 reikia jam \u012fgyvendinti. Tai, kaip planuojate, organizuojate ir valdote savo komand\u0105, turi didel\u0119 \u012ftak\u0105 projekto s\u0117kmei.","protected":false},"author":3,"featured_media":4603,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22],"tags":[86,38,51],"class_list":["post-4601","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management","tag-project-resource-management","tag-resource-management","tag-resource-management-guide"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v23.8 (Yoast SEO v24.3) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Project Resource Management - The Real Guide for Project Managers<\/title>\n<meta name=\"description\" content=\"How you plan, organize and manage your team has a big impact on your project\u2019s success. Learn how to manage your teams with this resource management guide.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teamdeck.io\/lt\/projektu-valdymas\/projekto-istekliu-valdymo-vadovas\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Resource Management 101: Guide for Project Managers\" \/>\n<meta property=\"og:description\" content=\"How you plan, organize and manage your team has a big impact on your project\u2019s success. Learn how to manage your teams with this resource management guide.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teamdeck.io\/lt\/projektu-valdymas\/projekto-istekliu-valdymo-vadovas\/\" \/>\n<meta property=\"og:site_name\" content=\"Teamdeck\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/helloteamdeck\" \/>\n<meta property=\"article:published_time\" content=\"2019-01-28T14:05:48+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-10-15T17:00:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/28150300\/resource-management-guide.png\" \/>\n<meta name=\"author\" content=\"Pawe\u0142 Ha\u0142abuda\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Resource Management 101: Guide for Project Managers\" \/>\n<meta name=\"twitter:description\" content=\"How you plan, organize and manage your team has a big impact on your project\u2019s success. Learn how to manage your teams with this resource management guide.\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/28150300\/resource-management-guide.png\" \/>\n<meta name=\"twitter:creator\" content=\"@helloteamdeck\" \/>\n<meta name=\"twitter:site\" content=\"@helloteamdeck\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Pawe\u0142 Ha\u0142abuda\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"26 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/\",\"url\":\"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/\",\"name\":\"Project Resource Management - The Real Guide for Project Managers\",\"isPartOf\":{\"@id\":\"https:\/\/teamdeck.io\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/28150300\/resource-management-guide.png\",\"datePublished\":\"2019-01-28T14:05:48+00:00\",\"dateModified\":\"2023-10-15T17:00:08+00:00\",\"author\":{\"@id\":\"https:\/\/teamdeck.io\/#\/schema\/person\/1073b38fa48e5b06f16eba3840da6f5e\"},\"description\":\"How you plan, organize and manage your team has a big impact on your project\u2019s success. Learn how to manage your teams with this resource management guide.\",\"breadcrumb\":{\"@id\":\"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/#primaryimage\",\"url\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/28150300\/resource-management-guide.png\",\"contentUrl\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/28150300\/resource-management-guide.png\",\"width\":\"1920\",\"height\":\"1080\",\"caption\":\"Guide how to manage project tasks and project management resources\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/teamdeck.io\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Project Resource Management 101: Guide for Project Managers\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/teamdeck.io\/#website\",\"url\":\"https:\/\/teamdeck.io\/\",\"name\":\"Teamdeck\",\"description\":\"resource scheduling + time tracking + leave management\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/teamdeck.io\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/teamdeck.io\/#\/schema\/person\/1073b38fa48e5b06f16eba3840da6f5e\",\"name\":\"Pawe\u0142 Ha\u0142abuda\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\/\/teamdeck.io\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113657\/s38W_LT-150x150.jpg\",\"contentUrl\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113657\/s38W_LT-150x150.jpg\",\"caption\":\"Pawe\u0142 Ha\u0142abuda\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Project Resource Management - The Real Guide for Project Managers","description":"How you plan, organize and manage your team has a big impact on your project\u2019s success. Learn how to manage your teams with this resource management guide.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teamdeck.io\/lt\/projektu-valdymas\/projekto-istekliu-valdymo-vadovas\/","og_locale":"lt_LT","og_type":"article","og_title":"Resource Management 101: Guide for Project Managers","og_description":"How you plan, organize and manage your team has a big impact on your project\u2019s success. Learn how to manage your teams with this resource management guide.","og_url":"https:\/\/teamdeck.io\/lt\/projektu-valdymas\/projekto-istekliu-valdymo-vadovas\/","og_site_name":"Teamdeck","article_publisher":"https:\/\/www.facebook.com\/helloteamdeck","article_published_time":"2019-01-28T14:05:48+00:00","article_modified_time":"2023-10-15T17:00:08+00:00","og_image":[{"url":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/28150300\/resource-management-guide.png","type":"","width":"","height":""}],"author":"Pawe\u0142 Ha\u0142abuda","twitter_card":"summary_large_image","twitter_title":"Resource Management 101: Guide for Project Managers","twitter_description":"How you plan, organize and manage your team has a big impact on your project\u2019s success. Learn how to manage your teams with this resource management guide.","twitter_image":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/28150300\/resource-management-guide.png","twitter_creator":"@helloteamdeck","twitter_site":"@helloteamdeck","twitter_misc":{"Written by":"Pawe\u0142 Ha\u0142abuda","Est. reading time":"26 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/","url":"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/","name":"Project Resource Management - The Real Guide for Project Managers","isPartOf":{"@id":"https:\/\/teamdeck.io\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/#primaryimage"},"image":{"@id":"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/#primaryimage"},"thumbnailUrl":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/28150300\/resource-management-guide.png","datePublished":"2019-01-28T14:05:48+00:00","dateModified":"2023-10-15T17:00:08+00:00","author":{"@id":"https:\/\/teamdeck.io\/#\/schema\/person\/1073b38fa48e5b06f16eba3840da6f5e"},"description":"How you plan, organize and manage your team has a big impact on your project\u2019s success. Learn how to manage your teams with this resource management guide.","breadcrumb":{"@id":"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/"]}]},{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/#primaryimage","url":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/28150300\/resource-management-guide.png","contentUrl":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2019\/01\/28150300\/resource-management-guide.png","width":"1920","height":"1080","caption":"Guide how to manage project tasks and project management resources"},{"@type":"BreadcrumbList","@id":"https:\/\/teamdeck.io\/project-management\/project-resource-management-guide\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/teamdeck.io\/"},{"@type":"ListItem","position":2,"name":"Project Resource Management 101: Guide for Project Managers"}]},{"@type":"WebSite","@id":"https:\/\/teamdeck.io\/#website","url":"https:\/\/teamdeck.io\/","name":"Teamdeck","description":"resource scheduling + time tracking + leave management","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teamdeck.io\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Person","@id":"https:\/\/teamdeck.io\/#\/schema\/person\/1073b38fa48e5b06f16eba3840da6f5e","name":"Pawe\u0142 Ha\u0142abuda","image":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/teamdeck.io\/#\/schema\/person\/image\/","url":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113657\/s38W_LT-150x150.jpg","contentUrl":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113657\/s38W_LT-150x150.jpg","caption":"Pawe\u0142 Ha\u0142abuda"}}]}},"_links":{"self":[{"href":"https:\/\/teamdeck.io\/lt\/wp-json\/wp\/v2\/posts\/4601","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teamdeck.io\/lt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teamdeck.io\/lt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teamdeck.io\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/teamdeck.io\/lt\/wp-json\/wp\/v2\/comments?post=4601"}],"version-history":[{"count":121,"href":"https:\/\/teamdeck.io\/lt\/wp-json\/wp\/v2\/posts\/4601\/revisions"}],"predecessor-version":[{"id":12495,"href":"https:\/\/teamdeck.io\/lt\/wp-json\/wp\/v2\/posts\/4601\/revisions\/12495"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teamdeck.io\/lt\/wp-json\/wp\/v2\/media\/4603"}],"wp:attachment":[{"href":"https:\/\/teamdeck.io\/lt\/wp-json\/wp\/v2\/media?parent=4601"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teamdeck.io\/lt\/wp-json\/wp\/v2\/categories?post=4601"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teamdeck.io\/lt\/wp-json\/wp\/v2\/tags?post=4601"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}