{"id":6010,"date":"2020-06-10T08:22:33","date_gmt":"2020-06-10T06:22:33","guid":{"rendered":"https:\/\/teamdeck.io\/?p=6010"},"modified":"2023-10-15T19:36:26","modified_gmt":"2023-10-15T17:36:26","slug":"project-scheduling-conflicts","status":"publish","type":"post","link":"https:\/\/teamdeck.io\/et\/projektijuhtimine\/projekti-ajakava-konfliktid\/","title":{"rendered":"Kuidas v\u00e4ltida konflikte projekti ajakava koostamisel?"},"content":{"rendered":"<div class=\"yoast-breadcrumbs\"><span><span><a href=\"https:\/\/teamdeck.io\/et\/\">Kodu<\/a><\/span> \" <span class=\"breadcrumb_last\" aria-current=\"page\">Kuidas v\u00e4ltida konflikte projekti ajakava koostamisel?<\/span><\/span><\/div>\n\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Projektijuhina teate piisavalt h\u00e4sti, et optimaalse projekti ajakava koostamine on keeruline, kuid teil on palju <\/span><a href=\"https:\/\/teamdeck.io\/et\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">projekti- ja ressursihaldustarkvara<\/span><\/a><span style=\"font-weight: 400;\"> ja tehnikaid teie k\u00e4sutuses. Siiski on v\u00f5imalik, et teil tekib probleeme ajakava koostamisega. Asjad muutuvad veelgi keerulisemaks, kui t\u00f6\u00f6tate ettev\u00f5ttes, mis vastutab korraga mitme projekti elluviimise eest. Siis on ajakava kattumise ja topeltbroneeritud t\u00f6\u00f6tajate v\u00f5imalus veelgi suurem.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">\u00d5nneks saate v\u00e4ltida enamikku ajakavaga seotud konflikte, kui j\u00e4rgite parimaid tavasid <a href=\"https:\/\/teamdeck.io\/et\/projektijuhtimine\/projekti-ressursside-juhtimise-juhend\/\" target=\"_blank\" rel=\"noopener\">ressursside ja projektijuhtimine<\/a>. Allpool on loetletud m\u00f5ned n\u00f5uanded - j\u00e4rgige neid, et oma projekte edukamalt hallata.<\/span><\/p>\n<p style=\"text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-12532 size-full\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2023\/10\/15193435\/john-schnobrich-2FPjlAyMQTA-unsplash.jpg\" alt=\"\" width=\"1920\" height=\"1280\" \/><\/p>\n<h2 style=\"text-align: justify;\" data-pm-slice=\"1 1 []\"><strong>Ebameeldivalt tulevad projekti ajakava konfliktid<\/strong><\/h2>\n<p style=\"text-align: justify;\"><span data-color=\"var(--green-10)\">M\u00f5lemad terminid on absoluutselt teada. Nii \u00e4ri- kui ka eraelus ei ole sellised olukorrad nagu kahe olulise kuup\u00e4eva ja kahe olulise s\u00fcndmuse kattumine \u00fchegi inimese elus midagi uut. Kuid enamasti ei tee selline olukord kunagi asju paremaks ega lihtsamaks.<\/span><\/p>\n<p style=\"text-align: justify;\"><span data-color=\"var(--green-10)\">\u00dcldiselt tekivad projektijuhtimiskeskkonnas ajakonfliktid siis, kui meeskonnaliikmele v\u00f5i t\u00f6\u00f6tajale on m\u00e4\u00e4ratud rohkem kui kaks \u00fclesannet v\u00f5i kaksikvahetused korraga. Sellise olukorra taga on kaks asja ja kummalgi neist on omad v\u00e4ljakutsed.<\/span><\/p>\n<p style=\"text-align: justify;\"><span data-color=\"var(--green-10)\">Paljud uuringud, mis k\u00e4sitlevad t\u00f6\u00f6lt lahkumise probleeme, n\u00e4itavad, et 5 peamise p\u00f5hjuse hulgas on alati ajakava v\u00f5i - teisis\u00f5nu - paindlikkuse k\u00fcsimus. Kui lugeda kokkuv\u00f5tet, mille on andnud <\/span><a href=\"https:\/\/www.pewresearch.org\/fact-tank\/2022\/03\/09\/majority-of-workers-who-quit-a-job-in-2021-cite-low-pay-no-opportunities-for-advancement-feeling-disrespected\/\" target=\"_blank\" rel=\"noopener noreferrer\"><span data-color=\"var(--green-10)\">PEW uurimiskeskus<\/span><\/a><span data-color=\"var(--green-10)\"> v\u00f5i see, mis on p\u00e4rit <\/span><a href=\"https:\/\/www.inc.com\/marcel-schwantes\/why-are-your-employees-quitting-a-study-says-it-comes-down-to-any-of-these-6-reasons.html\" target=\"_blank\" rel=\"noopener noreferrer\"><span data-color=\"var(--green-10)\">Gallupi uuring<\/span><\/a><span data-color=\"var(--green-10)\">, on j\u00e4reldused samad. T\u00f6\u00f6tajate ajakava m\u00e4\u00e4rab tema otsuse kaasamise ja lojaalsuse osas.<\/span><\/p>\n<p style=\"text-align: justify;\"><span data-color=\"var(--green-10)\">Kas m\u00f5lemad v\u00f5ivad m\u00f5jutada \u00e4ri ja projektide l\u00f5puleviimist? Absoluutselt jah. Suurep\u00e4rane ajakonfliktidega tegelemine on veel \u00fcks oskus, mis on k\u00f5rgemale suunatud projektijuhtide seas. <\/span><\/p>\n<h2 style=\"text-align: justify;\"><strong>Miks tekivad konfliktid projekti ajakava koostamisel?<\/strong><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">V\u00f5tame hetkeks aega, et kirjeldada m\u00f5ningaid k\u00f5ige levinumaid p\u00f5hjusi, mis p\u00f5hjustavad projekti planeerimisprobleeme. Kui olete neist aru saanud, on lihtsam kindlaks teha, kus teie projektijuhtimise protsessi on v\u00f5imalik parandada.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400; text-align: justify;\"><span style=\"font-weight: 400;\">Ebat\u00e4pne <\/span><a href=\"https:\/\/teamdeck.io\/et\/projektijuhtimine\/kuidas-hinnata-projekte\/\"><span style=\"font-weight: 400;\">hinnangud<\/span><\/a><span style=\"font-weight: 400;\">. Kui \u00fclesanne peaks v\u00f5tma paar tundi, kuid selle asemel v\u00f5tab see aega n\u00e4dala, kannatab t\u00f5en\u00e4oliselt teie ajakava.<\/span><\/li>\n<li style=\"font-weight: 400; text-align: justify;\"><span style=\"font-weight: 400;\">Ebapiisav ressursside prognoosimine. <\/span><span style=\"font-weight: 400;\">Veel \u00fcks tegur, mis v\u00f5ib teie projekti juba selle alguses muuta v\u00f5i h\u00e4vitada. Kui te ei suuda eelnevalt arvestada k\u00f5igi projekti elluviimiseks vajalike ressurssidega, v\u00f5ib see v\u00e4ga h\u00e4sti p\u00f5hjustada viivitusi teie ajakavas v\u00f5i konflikte teiste samal ajal toimuvate projektidega.<\/span><\/li>\n<li style=\"font-weight: 400; text-align: justify;\"><span style=\"font-weight: 400;\">Projekti etten\u00e4gematud s\u00f5ltuvused. <\/span><span style=\"font-weight: 400;\">Teie projekti ajakava v\u00f5ib paberil tunduda hea, kuid s\u00f5ltuvused, mida te ei ole planeerinud, v\u00f5ivad n\u00f5uda ajakava kohandamist.<\/span><\/li>\n<li style=\"font-weight: 400; text-align: justify;\"><span style=\"font-weight: 400;\">Projekti ulatuse alahindamine. N\u00f5uete kogumine k\u00f5igilt sidusr\u00fchmadelt ja <\/span><a href=\"https:\/\/teamdeck.io\/et\/projektijuhtimine\/projekti-ulatuse-tohus-juhtimine\/\"><span style=\"font-weight: 400;\">projekti ulatuse juhtimine<\/span><\/a><span style=\"font-weight: 400;\">, siis on suur t\u00f5en\u00e4osus, et alahindate seda, mida tuleb teha, et saavutada \u00e4rieesm\u00e4rgid.<\/span><\/li>\n<li style=\"font-weight: 400; text-align: justify;\"><span style=\"font-weight: 400;\">Erinevate projektijuhtide vahel puudub ajakava n\u00e4htavus. See on tavaline probleem ettev\u00f5tetes, kus on mitu projekti: agentuurid, tarkvarafirmad, konsultatsioonifirmad. Kahjuks toob erinevate projektijuhtide ja meeskonnajuhatajate vahelise n\u00e4htavuse ja suhtluse puudumine peaaegu alati kaasa m\u00f5ningaid ajakava konflikte.<\/span><\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium aligncenter\" src=\"https:\/\/media.giphy.com\/media\/3YLlLrGNXYvHGANe6E\/giphy.gif\" alt=\"Looge ajakavasid ilma topeltbroneerimiseta v\u00f5i kahe \u00fclesande m\u00e4\u00e4ramiseta samasse ajav\u00e4lja\" width=\"444\" height=\"250\" \/><\/p>\n<h2><strong>Mida saate teha, et v\u00e4ltida ajakonflikte?<\/strong><\/h2>\n<p><span style=\"font-weight: 400;\">T\u00f5si, m\u00f5ned asjaolud ei ole teie kontrolli all. V\u00f5tame n\u00e4iteks praeguse olukorra. Selle blogipostituse avaldamise ajal (juuni 2020) on tuhanded v\u00f5i enam projektiplaanid koronaviiruse pandeemia t\u00f5ttu edasi l\u00fckatud v\u00f5i \u00fcldse k\u00f5rvale j\u00e4etud. Te ei saa kontrollida k\u00f5ike, mis v\u00f5ib teie projektiga juhtuda. See ei t\u00e4henda, et te ei peaks kasutusele v\u00f5tma m\u00f5ningaid ennetavaid projektijuhtimise meetmeid, et hoida ajakava konfliktid eemal.\u00a0<\/span><\/p>\n<h4><span style=\"font-weight: 400;\">Suurendage oma projekti ja selle ajakava n\u00e4htavust.<\/span><\/h4>\n<p><span style=\"font-weight: 400;\">K\u00f5ige lihtsam viis projektitegevuste ja nende kallal t\u00f6\u00f6tavate meeskonnaliikmete n\u00e4htavuse suurendamiseks on v\u00f5tta kasutusele ressurss, milleks on <a href=\"https:\/\/teamdeck.io\/et\/tooriistakast\/online-kalendriplaneerija\/\" target=\"_blank\" rel=\"noopener\">online kalendriplaneerija<\/a>. See on ruum, kus k\u00f5ik v\u00f5i m\u00e4\u00e4ratud t\u00f6\u00f6tajad n\u00e4evad, millise projekti jaoks on inimesed broneeritud, kellel on vaba aega (ja kes v\u00f5ib liituda m\u00f5ne teise meeskonnaga, kes on h\u00e4das), kes ei ole \u00fcldse saadaval jne. Teamdeck on t\u00f6\u00f6riist, mille oleme loonud selleks, et aidata ettev\u00f5tetel oma meeskondi ja projekte paremini hallata:<\/span>\n\t<div  class=\"wpb_single_image wpb_content_element vc_align_center\">\n\t\t\n\t\t<figure class=\"wpb_wrapper vc_figure\">\n\t\t\t<div class=\"vc_single_image-wrapper   vc_box_border_grey\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"587\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/10\/04130148\/utilization-bar-teamdeck-960x587.png\" class=\"vc_single_image-img attachment-large\" alt=\"Eraldage konkreetsete \u00fclesannete jaoks vajalikud ressursid ja looge ideaalne projekti ajakava koos projektikalendriga.\" srcset=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/10\/04130148\/utilization-bar-teamdeck.png 960w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/10\/04130148\/utilization-bar-teamdeck-300x183.png 300w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/10\/04130148\/utilization-bar-teamdeck-768x470.png 768w\" sizes=\"auto, (max-width: 960px) 100vw, 960px\" \/><\/div><figcaption class=\"vc_figure-caption\">Kasutamise riba Teamdeck.io - ressursihaldustarkvaras<\/figcaption>\n\t\t<\/figure>\n\t<\/div>\n\n\t<div class=\"wpb_text_column wpb_content_element\" >\n\t\t<div class=\"wpb_wrapper\">\n\t\t\t<p><span style=\"font-weight: 400;\">Keskset ressursikalendrit hindavad eriti k\u00f5rgelt ettev\u00f5tted, kes t\u00f6\u00f6tavad mitme projektiga korraga. Kui teil on mitu ajakava, t\u00e4htaegu, projektimeeskonda, on nii palju raskem v\u00e4ltida kokkup\u00f5rkeid v\u00f5i kattumisi. \u00dctleme, et soovite oma projektimeeskonda lisada uue inimese. Kui te ei n\u00e4e teiste projektide ajakava, siis v\u00f5ite ainult eeldada, et ta saab t\u00e4iendava t\u00f6\u00f6koormusega hakkama. \u00dcheainsa \"ajakava t\u00f5e\" allika abil saab iga PM aktiivselt v\u00e4ltida ajakavakonflikte, kui ta planeerib uut projekti v\u00f5i kohandab olemasolevat projekti.<\/span><\/p>\n<h4><span style=\"font-weight: 400;\">P\u00f6\u00f6rake rohkem t\u00e4helepanu ressursside jaotamisele.<\/span><\/h4>\n<p><span style=\"font-weight: 400;\">Selleks, et saavutada edu <\/span><a href=\"https:\/\/teamdeck.io\/et\/projektijuhtimine\/ressursside-eraldamine-projektijuhtidele\/\"><span style=\"font-weight: 400;\">ressursside eraldamine<\/span><\/a><span style=\"font-weight: 400;\">peate kindlaks m\u00e4\u00e4rama, milliseid inimesi te oma meeskonda vajate. Millised on nende soovitud oskused? Kas erialane kogemus m\u00e4ngib olulist rolli? V\u00f5ib-olla on teatud geograafilised asukohad paremad, sest t\u00f6\u00f6tajad peavad kliendiga isiklikult kohtuma? Teil v\u00f5ib olla oma \"unistuste meeskonnale\" mitu n\u00f5uet ja on oluline neid t\u00e4psustada. Kui broneerite esimese vaba r\u00fchma inimesi, p\u00f6\u00f6ramata t\u00e4helepanu eespool loetletud teguritele, on oht, et peate hiljem ressursse \u00fcmber paigutama ja v\u00f5ib tekkida probleeme ajakava koostamisega.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Loomulikult soovite ka kontrollida, kas teie meeskonna isiklikud ajakavad on koosk\u00f5las projekti ajakavaga. Seda saate h\u00f5lpsasti teha, kui teie projekti <a href=\"https:\/\/teamdeck.io\/et\/tooriistakast\/projekti-planeerimise-vahendid\/\" target=\"_blank\" rel=\"noopener\">planeerimisvahend<\/a> salvestab ka andmeid vaba aja kohta (Teamdeck salvestab). Muidugi ei saa alati planeerida oma ajakava vastavalt inimeste puhkustele: peamine on olla neist puudumistest teadlik, muidu on ajakavaga probleeme.<\/span><\/p>\n\n\t\t<\/div>\n\t<\/div>\n\n\t<div  class=\"wpb_single_image wpb_content_element vc_align_center\">\n\t\t\n\t\t<figure class=\"wpb_wrapper vc_figure\">\n\t\t\t<div class=\"vc_single_image-wrapper   vc_box_border_grey\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"315\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2020\/06\/09132804\/Zrzut-ekranu-2020-06-9-o-13.27.48-960x315.png\" class=\"vc_single_image-img attachment-large\" alt=\"V\u00e4ltida projekti ajakava konflikte, suurendades t\u00f6\u00f6tajate n\u00e4htavust ressursside juhtimise abil\" srcset=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2020\/06\/09132804\/Zrzut-ekranu-2020-06-9-o-13.27.48-960x315.png 960w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2020\/06\/09132804\/Zrzut-ekranu-2020-06-9-o-13.27.48-300x98.png 300w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2020\/06\/09132804\/Zrzut-ekranu-2020-06-9-o-13.27.48-768x252.png 768w\" sizes=\"auto, (max-width: 960px) 100vw, 960px\" \/><\/div><figcaption class=\"vc_figure-caption\">Ajastamiskonfliktide v\u00e4ltimiseks kasutavad PM&#039;s, CMO&#039;s projekti planeerimise tarkvara.<\/figcaption>\n\t\t<\/figure>\n\t<\/div>\n\n\t<div class=\"wpb_text_column wpb_content_element\" >\n\t\t<div class=\"wpb_wrapper\">\n\t\t\t\n\t\t<\/div>\n\t<\/div>\n<h4><span style=\"font-weight: 400;\">Suhtle t\u00f5husalt oma meeskonnaliikmetega.<\/span><\/h4>\n<p><span style=\"font-weight: 400;\">Avatud suhtlemine ja<\/span><a href=\"https:\/\/teamdeck.io\/et\/meeskonna-onnelikkus\/projekti-labipaistvus\/\"> <span style=\"font-weight: 400;\">projekti l\u00e4bipaistvus<\/span><\/a><span style=\"font-weight: 400;\"> aitab teie meeskonnaliikmeid juba projekti hindamisetapis. Kuigi te ei tohiks oodata, et teie meeskonnaliikmed leiavad 100% t\u00e4pse<\/span><a href=\"https:\/\/teamdeck.io\/et\/projektijuhtimine\/kuidas-hinnata-projekte\/\"> <span style=\"font-weight: 400;\">hinnangud<\/span><\/a><span style=\"font-weight: 400;\">, peavad nende esitatud eeldused olema v\u00e4hemalt v\u00f5imaluste piires. Kuidas te saate aidata? \u00dcks asi, mida projektijuhid saavad projekti hindamist toetada, on veenduda, et meeskond m\u00f5istab t\u00e4ielikult projekti: \u00e4rieesm\u00e4rke, l\u00f5ppkasutajate vajadusi ning k\u00f5iki funktsionaalseid ja mittefunktsionaalseid n\u00f5udeid. See peaks aitama teie t\u00f6\u00f6tajatel luua realistlikumaid hinnanguid.\u00a0<\/span><\/p>\n<h4><span style=\"font-weight: 400;\">Tehke kindlaks \u00fclesannete ja rollide vahelised s\u00f5ltuvused teie meeskonnas.<\/span><\/h4>\n<p><span style=\"font-weight: 400;\">\u00dcks asi on meeles pidada erinevate \u00fclesannete vahelisi s\u00f5ltuvusi, kuid te peate meeles pidama ka erinevate rollide vahelisi s\u00f5ltuvusi projektis. Teie front-end arendaja saab projektiga t\u00e4ielikult t\u00f6\u00f6d teha alles siis, kui disainer oma osa tarnib. Kui \u00fcks inimene hilineb oma \u00fclesannetega, v\u00f5ivad teised inimesed j\u00e4rgida teda lihtsalt nende rollide vaheliste s\u00f5ltuvuste t\u00f5ttu.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Veenduge, et teie meeskond on neist s\u00f5ltuvustest teadlik. Selline teadlikkus aitab neil teha paremaid otsuseid hindamise etapis ja seada hiljem oma \u00fclesandeid t\u00e4htsuse j\u00e4rjekorda.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-medium\" src=\"https:\/\/media.giphy.com\/media\/5zf44galTZcNhjuUoI\/giphy.gif\" alt=\"Planeerimiskonflikt v\u00f5ib olla seotud \u00fche koha, kahe koha, \u00fche s\u00fcndmuse, mitme s\u00fcndmuse, koosoleku\" width=\"480\" height=\"360\" \/><\/p>\n<h4><span style=\"font-weight: 400;\">Tehke koost\u00f6\u00f6d teiste projektijuhtidega ja edastage oma kavatsused.<\/span><\/h4>\n<p><span style=\"font-weight: 400;\">Me juba mainisime, et teil on vaja \u00fclevaadet oma ettev\u00f5tte teiste projektide ajakavadest, eriti kui te kasutate sama ressursibaasi. Kuid kuidas saate \u00fclevaate teiste inimeste kavatsustest? Kujutame ette, et te valmistute uueks projektiks ja kavatsete meeskonda kokku panna. Te vaatate l\u00e4bi t\u00f6\u00f6tajate nimekirja ja m\u00e4rkate kedagi, kes sobiks suurep\u00e4raselt. Otsustate m\u00e4\u00e4rata ta projekti kohe, kui saate kliendilt ametliku alustamise kinnituse. Kui see p\u00e4ev k\u00e4tte j\u00f5uab, ootab teid ebameeldiv \u00fcllatus: teine PM on selle t\u00f6\u00f6taja juba oma projekti jaoks broneerinud. Kui teil oleks vaid v\u00f5imalik \"tellida\" teatud meeskonna koosseisu...<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Teamdecki abil saate oma kavatsustest teada anda ja t\u00f6\u00f6tajaid esialgu broneerida - lisage lihtsalt broneeringule spetsiaalne silt. Samuti saate luua kohandatud sildid, et v\u00e4ljendada n\u00e4iteks eri kiireloomulisuse v\u00f5i usalduse taset konkreetse broneeringu puhul. Seda k\u00f5ike selleks, et v\u00e4ltida konflikte m\u00f5ne teise projekti ajakavaga.<\/span><\/p>\n<h4><span style=\"font-weight: 400;\">J\u00e4lgige oma projekti edenemist.<\/span><\/h4>\n<p><span style=\"font-weight: 400;\">Projekti edenemise j\u00e4lgimine ja aruandlus on projektijuhtimise oluline osa: see v\u00f5imaldab teil hoida sidusr\u00fchmi kursis, kuid ka ise paremini m\u00f5ista projekti seisu. Ressursside ja <a href=\"https:\/\/teamdeck.io\/et\/projektijuhtimine\/projekti-planeerimise-tarkvara-mida-projektijuhid-otsivad\/\">projekti planeerimise tarkvara<\/a>, sealhulgas Teamdeck, v\u00f5imaldavad sageli luua aruandeid projektitegevuste, registreeritud aja, ressursside kasutamise jne kohta. Kasutage neid, et v\u00e4ltida ajakava kohandamist.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-medium\" src=\"https:\/\/media.giphy.com\/media\/j05OpWhQmoNXDsNC0T\/giphy.gif\" alt=\"Kattuvad s\u00fcndmused on enamasti ajakonflikti peamine p\u00f5hjus.\" width=\"480\" height=\"270\" \/><\/p>\n<p><span style=\"font-weight: 400;\">N\u00e4iteks peate regulaarselt kontrollima oma t\u00f6\u00f6tajate poolt tegelikult j\u00e4lgitud aega ja v\u00f5rdlema seda esialgse hinnanguga. Kas k\u00f5ik l\u00e4heb rohkem-v\u00e4hem plaanip\u00e4raselt? Suurep\u00e4rane! Teisest k\u00fcljest v\u00f5ib hinnangute ja tegeliku aja erinevus olla m\u00e4rk tulevastest ajakava probleemidest.<\/span><div class=\"vc_row wpb_row vc_row-fluid redl-row-section feature-row vc_custom_1574416816256 vc_row-o-equal-height vc_row-o-content-middle vc_row-flex padding-medium bgv-default bgh-default halign-center\"><\/div>\n<h2 style=\"text-align: center;\" data-pm-slice=\"1 1 []\"><span data-color=\"rgb(104, 211, 145)\">L\u00f5petage \u00fckskord ja l\u00f5plikult ajakonfliktide p\u00e4rast muretsemine. <\/span><span data-color=\"#D9C6F1\">Lihtne ajakava konfliktide k\u00e4sitlemine ressursside planeerijaga<\/span><\/h2>","protected":false},"excerpt":{"rendered":"Projektijuhina teate piisavalt h\u00e4sti, et optimaalse projekti ajakava koostamine on keeruline, kuid teie k\u00e4sutuses on palju projekti- ja ressursihaldustarkvara ning -tehnikaid. Siiski on v\u00f5imalik, et te jooksete...","protected":false},"author":6,"featured_media":8461,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22],"tags":[],"class_list":["post-6010","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v23.8 (Yoast SEO v24.3) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>How to Avoid Scheduling Conflicts?<\/title>\n<meta name=\"description\" content=\"In this blog post we will show you how you can avoid project scheduling conflicts with the best practices of resource management.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teamdeck.io\/et\/projektijuhtimine\/projekti-ajakava-konfliktid\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to Avoid Project Scheduling Conflicts?\" \/>\n<meta property=\"og:description\" content=\"In this blog post we will show you how you can avoid project scheduling conflicts with the best practices of resource management.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teamdeck.io\/et\/projektijuhtimine\/projekti-ajakava-konfliktid\/\" \/>\n<meta property=\"og:site_name\" content=\"Teamdeck\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/helloteamdeck\" \/>\n<meta property=\"article:published_time\" content=\"2020-06-10T06:22:33+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-10-15T17:36:26+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2020\/06\/17161906\/photo-1522152302542-71a8e5172aa1-1.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1008\" \/>\n\t<meta property=\"og:image:height\" content=\"826\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ania Kitowska\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@helloteamdeck\" \/>\n<meta name=\"twitter:site\" content=\"@helloteamdeck\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ania Kitowska\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/teamdeck.io\/project-management\/project-scheduling-conflicts\/\",\"url\":\"https:\/\/teamdeck.io\/project-management\/project-scheduling-conflicts\/\",\"name\":\"How to Avoid Scheduling Conflicts?\",\"isPartOf\":{\"@id\":\"https:\/\/teamdeck.io\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/teamdeck.io\/project-management\/project-scheduling-conflicts\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/teamdeck.io\/project-management\/project-scheduling-conflicts\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2020\/06\/17161906\/photo-1522152302542-71a8e5172aa1-1.jpeg\",\"datePublished\":\"2020-06-10T06:22:33+00:00\",\"dateModified\":\"2023-10-15T17:36:26+00:00\",\"author\":{\"@id\":\"https:\/\/teamdeck.io\/#\/schema\/person\/38139dc474576295e51cfae1580d697e\"},\"description\":\"In this blog post we will show you how you can avoid project scheduling conflicts with the best practices of resource management.\",\"breadcrumb\":{\"@id\":\"https:\/\/teamdeck.io\/project-management\/project-scheduling-conflicts\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/teamdeck.io\/project-management\/project-scheduling-conflicts\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\/\/teamdeck.io\/project-management\/project-scheduling-conflicts\/#primaryimage\",\"url\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2020\/06\/17161906\/photo-1522152302542-71a8e5172aa1-1.jpeg\",\"contentUrl\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2020\/06\/17161906\/photo-1522152302542-71a8e5172aa1-1.jpeg\",\"width\":1008,\"height\":826,\"caption\":\"Handling scheduling conflicts in future projects with scheduling software\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/teamdeck.io\/project-management\/project-scheduling-conflicts\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/teamdeck.io\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to Avoid Project Scheduling Conflicts?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/teamdeck.io\/#website\",\"url\":\"https:\/\/teamdeck.io\/\",\"name\":\"Teamdeck\",\"description\":\"resource scheduling + time tracking + leave management\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/teamdeck.io\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/teamdeck.io\/#\/schema\/person\/38139dc474576295e51cfae1580d697e\",\"name\":\"Ania Kitowska\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\/\/teamdeck.io\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113607\/aniaprofil%C3%B3wka-150x150.jpg\",\"contentUrl\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113607\/aniaprofil%C3%B3wka-150x150.jpg\",\"caption\":\"Ania Kitowska\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"How to Avoid Scheduling Conflicts?","description":"In this blog post we will show you how you can avoid project scheduling conflicts with the best practices of resource management.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teamdeck.io\/et\/projektijuhtimine\/projekti-ajakava-konfliktid\/","og_locale":"et_EE","og_type":"article","og_title":"How to Avoid Project Scheduling Conflicts?","og_description":"In this blog post we will show you how you can avoid project scheduling conflicts with the best practices of resource management.","og_url":"https:\/\/teamdeck.io\/et\/projektijuhtimine\/projekti-ajakava-konfliktid\/","og_site_name":"Teamdeck","article_publisher":"https:\/\/www.facebook.com\/helloteamdeck","article_published_time":"2020-06-10T06:22:33+00:00","article_modified_time":"2023-10-15T17:36:26+00:00","og_image":[{"width":1008,"height":826,"url":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2020\/06\/17161906\/photo-1522152302542-71a8e5172aa1-1.jpeg","type":"image\/jpeg"}],"author":"Ania Kitowska","twitter_card":"summary_large_image","twitter_creator":"@helloteamdeck","twitter_site":"@helloteamdeck","twitter_misc":{"Written by":"Ania Kitowska","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/teamdeck.io\/project-management\/project-scheduling-conflicts\/","url":"https:\/\/teamdeck.io\/project-management\/project-scheduling-conflicts\/","name":"How to Avoid Scheduling Conflicts?","isPartOf":{"@id":"https:\/\/teamdeck.io\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teamdeck.io\/project-management\/project-scheduling-conflicts\/#primaryimage"},"image":{"@id":"https:\/\/teamdeck.io\/project-management\/project-scheduling-conflicts\/#primaryimage"},"thumbnailUrl":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2020\/06\/17161906\/photo-1522152302542-71a8e5172aa1-1.jpeg","datePublished":"2020-06-10T06:22:33+00:00","dateModified":"2023-10-15T17:36:26+00:00","author":{"@id":"https:\/\/teamdeck.io\/#\/schema\/person\/38139dc474576295e51cfae1580d697e"},"description":"In this blog post we will show you how you can avoid project scheduling conflicts with the best practices of resource management.","breadcrumb":{"@id":"https:\/\/teamdeck.io\/project-management\/project-scheduling-conflicts\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teamdeck.io\/project-management\/project-scheduling-conflicts\/"]}]},{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/teamdeck.io\/project-management\/project-scheduling-conflicts\/#primaryimage","url":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2020\/06\/17161906\/photo-1522152302542-71a8e5172aa1-1.jpeg","contentUrl":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2020\/06\/17161906\/photo-1522152302542-71a8e5172aa1-1.jpeg","width":1008,"height":826,"caption":"Handling scheduling conflicts in future projects with scheduling software"},{"@type":"BreadcrumbList","@id":"https:\/\/teamdeck.io\/project-management\/project-scheduling-conflicts\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/teamdeck.io\/"},{"@type":"ListItem","position":2,"name":"How to Avoid Project Scheduling Conflicts?"}]},{"@type":"WebSite","@id":"https:\/\/teamdeck.io\/#website","url":"https:\/\/teamdeck.io\/","name":"Teamdeck","description":"resource scheduling + time tracking + leave management","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teamdeck.io\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Person","@id":"https:\/\/teamdeck.io\/#\/schema\/person\/38139dc474576295e51cfae1580d697e","name":"Ania Kitowska","image":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/teamdeck.io\/#\/schema\/person\/image\/","url":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113607\/aniaprofil%C3%B3wka-150x150.jpg","contentUrl":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113607\/aniaprofil%C3%B3wka-150x150.jpg","caption":"Ania Kitowska"}}]}},"_links":{"self":[{"href":"https:\/\/teamdeck.io\/et\/wp-json\/wp\/v2\/posts\/6010","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teamdeck.io\/et\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teamdeck.io\/et\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teamdeck.io\/et\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/teamdeck.io\/et\/wp-json\/wp\/v2\/comments?post=6010"}],"version-history":[{"count":24,"href":"https:\/\/teamdeck.io\/et\/wp-json\/wp\/v2\/posts\/6010\/revisions"}],"predecessor-version":[{"id":12535,"href":"https:\/\/teamdeck.io\/et\/wp-json\/wp\/v2\/posts\/6010\/revisions\/12535"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teamdeck.io\/et\/wp-json\/wp\/v2\/media\/8461"}],"wp:attachment":[{"href":"https:\/\/teamdeck.io\/et\/wp-json\/wp\/v2\/media?parent=6010"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teamdeck.io\/et\/wp-json\/wp\/v2\/categories?post=6010"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teamdeck.io\/et\/wp-json\/wp\/v2\/tags?post=6010"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}