{"id":3892,"date":"2024-06-24T09:31:34","date_gmt":"2024-06-24T07:31:34","guid":{"rendered":"https:\/\/teamdeck.io\/?p=3892"},"modified":"2025-01-23T22:35:33","modified_gmt":"2025-01-23T20:35:33","slug":"how-to-measure-resource-utilization","status":"publish","type":"post","link":"https:\/\/teamdeck.io\/et\/projektijuhtimine\/kuidas-moota-ressursside-kasutamist\/","title":{"rendered":"Kuidas arvutada ressursikasutust: Juhend projektijuhtidele"},"content":{"rendered":"<p><strong>Ettev\u00f5tted panevad tavaliselt palju vaeva <\/strong><a rel=\"noopener noreferrer\" href=\"https:\/\/teamdeck.io\/et\/projektijuhtimine\/ressursside-eraldamine-projektijuhtidele\/\"><strong>ressursside eraldamine<\/strong><\/a><strong>. Te soovite hoida k\u00f5iki inimesi h\u00f5ivatud, tagades samal ajal, et nende \u00fclesanded on ettev\u00f5tte jaoks v\u00e4\u00e4rtuslikud (mis sageli t\u00e4hendab, et need on tasulised). Kui teie meeskond kasvab, muutub see v\u00e4ga keeruliseks, eriti kui peate m\u00e4\u00e4rama inimesi mitmesse samaaegselt toimuvasse projekti.<\/strong><\/p>\n\n\n\n<p>Artikkel sisaldab:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>M\u00f5ned valemid, kuidas m\u00f5\u00f5ta ressursside kasutamise m\u00e4\u00e4ra<\/p><\/li>\n\n\n\n<li><p>Mida t\u00e4hendab k\u00e4ttesaadavus ressursside kasutamisel<\/p><\/li>\n\n\n\n<li><p>M\u00f5jukas roll <a href=\"https:\/\/teamdeck.io\/et\/\" rel=\"noopener noreferrer\">ressursside haldamise tarkvara<\/a> ressursside kasutamisel<\/p><\/li>\n\n\n\n<li><p>Tootliku kasutamise ja arveldatava kasutamise erinevused<\/p><\/li>\n\n\n\n<li><p>Kuidas rakendada ressursside kasutamist<\/p><\/li>\n<\/ul>\n\n\n\n<p><iframe loading=\"lazy\" title=\"KUIDAS: Meeskonna kasutamise m\u00f5\u00f5tmine? Meeskonna kasutamise aruanne | Teamdeck Support\" width=\"1170\" height=\"658\" src=\"https:\/\/www.youtube.com\/embed\/LE2mK_jPZQc?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1164\" height=\"776\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/24135020\/MeasuringUtilization.jpg\" alt=\"\" class=\"wp-image-13642\" style=\"aspect-ratio:1;width:840px;height:auto\"\/><\/figure>\n\n\n\n<p>\u00dcks lihtsamaid viise, kuidas kontrollida, kas teie jaotamisp\u00fc\u00fcdlused on edukad, on j\u00e4lgida oma meeskonna kasutust ja ressursside mahtu. Enne kui tutvustame teile erinevaid ressursikasutuse m\u00f5\u00f5dikuid ja valemeid, tahaksime ressursikasutuse arusaadavalt defineerida. Seep\u00e4rast esitame selles artiklis - nagu ka paljudes teistes - projektijuhtide poolt kasutatavate m\u00f5istete, t\u00e4henduste ja terminite v\u00f5rdluse.<\/p>\n\n\n\n<p>T\u00f6\u00f6tajate v\u00f5i ressursside kasutamise \u00fclevaade on seotud m\u00f5istetega \"\u00fcle- ja alakasutus\". M\u00f5lemat peaksite teadma. Miks? Liiga palju t\u00f6\u00f6d v\u00f5i \u00fclesandeid projekti ajal (multitasking) ei tee, et see valmib t\u00e4ielikult v\u00f5i funktsioonidega, mis tiy arvasin. Niisiis, enne kui me alustame heidame pilgu Gartneri j\u00e4reldusele uuringust <em>Kuidas v\u00e4ltida IT-projektimeeskonna \u00fclekoormamist.<\/em>Inimeste \u00fclekoormamine annab tavaliselt tagasil\u00f6\u00f6gi, v\u00e4hendades tulemuslikkust ja suurendades vigu. Gartneri uuringud n\u00e4itavad, et v\u00e4iksema kasutuseaga meeskonnad v\u00f5ivad v\u00e4hendada \u00e4riv\u00e4\u00e4rtuse saavutamise aega 30% v\u00f5i rohkem. Seda teades on m\u00f5ttekas ressursside kasutusm\u00e4\u00e4rade sulgemine ja valvsalt hoidmine.<\/p>\n\n\n\n<img decoding=\"async\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/24093112\/Zrzut-ekranu-2022-04-7-o-09.41.07-1-2.png\" alt=\"Ressursside tulemuslikkus ja projekti edukus s\u00f5ltub meeskonna kasutusm\u00e4\u00e4rast\"\/>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-justify\" id=\"h-the-role-of-resource-utilization-in-project-management\"><strong>Ressursside kasutamise roll projektijuhtimises<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-where-is-resource-utilization-in-the-project-management-process\">Kus on ressursside kasutamine projektijuhtimise protsessis?<\/h3>\n\n\n\n<p>Parafraseerides projektijuhtimise instituudi (PMI) m\u00e4\u00e4ratlust, m\u00f5istetakse projektijuhtimise all konkreetsete teadmiste, p\u00e4devuste, oskuste, seadmete, t\u00f6\u00f6riistade, tarkvara, protsesside ja tehnikate kasutamist, et toota midagi, mis on \"inimestele v\u00e4\u00e4rtuslik\". Seda v\u00f5ib kergesti t\u00f5lgendada nii, et projektijuhtimine on asjade tegemine, kasutades seda, mis meil on. Vaimselt ja f\u00fc\u00fcsiliselt.<\/p>\n\n\n\n<p>Ja kui me tahaksime olla sarkastilised, v\u00f5iksime kasutada s\u00f5na \"v\u00e4\u00e4rtus inimestele\" mitmet\u00e4henduslikkust ja \u00f6elda, et PMI kavandatud projekti m\u00f5iste v\u00f5ib t\u00e4hendada ka sotsiaalse liikumise, sealhulgas poliitilise v\u00f5i usulise liikumise loomist.<\/p>\n\n\n\n<p>Kuid v\u00f5rreldes eespool nimetatud PMI m\u00e4\u00e4ratlusega v\u00f5ib projektijuhtimise \u00fchingu ettepanekut pidada rangemaks. Viimane r\u00f5hutab erapooletuid ja m\u00f5\u00f5detavaid kriteeriume, n\u00e4iteks aega ja eelarvet.<\/p>\n\n\n\n<p>\u00c4ri\u00fchingutes seavad m\u00f5lemad - ehkki need on l\u00e4bir\u00e4\u00e4gitavad - teatud projektiraamistiku. Olenemata sellest, kas tegemist on kliendi tellimuse v\u00f5i ettev\u00f5tte direktori poolt turundusosakonnale esitatud \u00fclesandega, peab \u00fclesanne olema t\u00e4idetud oodatud v\u00f5i, kui olla reaalne, \u00e4riliselt tasuvas ajaraamistikus ja andma investeeringu tasuvust. Nii et vastavalt APMile: Projektijuhtimine on protsesside, meetodite, oskuste, teadmiste ja kogemuste rakendamine konkreetsete projekti eesm\u00e4rkide saavutamiseks vastavalt projekti vastuv\u00f5tukriteeriumidele kokkulepitud parameetrite piires. Projektijuhtimisel on l\u00f5pptulemused, mis on piiratud piiratud aja ja eelarvega. Seega, erinevalt lihtsalt juhtimisest, kui me r\u00e4\u00e4gime projektijuhtimises projektidest, sisaldab iga projekt, mis tuleb l\u00f5pule viia, selliseid n\u00f5udeid nagu aeg ja eelarve. Allpool on n\u00e4idatud m\u00f5ned n\u00e4ited projekti ressurssidest (koos m\u00f5ne n\u00f5udega):<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>Luua 24 kuu jooksul ja $50 miljoni euro suuruse eelarve piires aatomipomm, mille l\u00f5hkeaine j\u00f5ud ei ole v\u00e4iksem kui tsaaripommi oma.<\/p><\/li>\n\n\n\n<li><p>ehitus tammi Vistula j\u00f5e kuni 31. m\u00e4rtsini 2025, samas ei \u00fcleta eelarve 120 miljonit USD<\/p><\/li>\n\n\n\n<li><p>t\u00f6\u00f6lauarakenduse v\u00e4ljat\u00f6\u00f6tamine (sh konversioonitee anal\u00fc\u00fcs ja parima valimine) 8 n\u00e4dalaga 12 000 USD eest \u00fche jalatsitootja jaoks.<\/p><\/li>\n<\/ul>\n\n\n\n<p>kaubam\u00e4rgi positsioneerimise uuendamine (sealhulgas uute BTL-materjalide levitamine) 12 kuu jooksul $100 000 eelarve piires.<\/p>\n\n\n\n<p>Eespool toodud n\u00e4idete p\u00f5hjal v\u00f5ime ette kujutada, kui palju on igas projektis samme, haldus\u00fclesandeid ja menetlusi. Kui palju inimesi - asjakohaste oskustega - saab iga\u00fches neist osaliseks?<\/p>\n\n\n\n<p>Seega, nagu eespool \u00f6eldud, on projektijuhtimine protsessi rakendamine. V\u00f5i v\u00f5ime \u00f6elda otse: projekt on protsess. Ja protsessi nimetatakse projektijuhtimise eluts\u00fckliks. Internetist v\u00f5ib leida selle protsessi 3, 4, 5, isegi 6 ja 7 faasi pidurit. Aga k\u00f5ige populaarsem kuulub mainitud PMI-le ja eeldab 5.<\/p>\n\n\n\n<img decoding=\"async\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2022\/05\/27140933\/5-Project-Management-Phases.png\" alt=\"Ressursside kasutamine on osa meeskonna ja t\u00f6\u00f6tajate tulemuslikkuse juhtimisest\"\/>\n\n\n\n<p>Nagu n\u00e4ete, on iga etapp \u00fclesannete r\u00fchm ning iga etapi taga on palju erinevaid k\u00fcsimusi ja v\u00e4ljakutseid. Samuti tasub lisada - eriti neile, kes on oma projektijuhi rolli alguses -, et neid etappe ei peaks alati k\u00e4sitlema kronoloogiliselt. M\u00f5nda elementi v\u00f5ib alustada varem, samas kui teised on projekti ajal pidev protsess (nt tulemuslikkuse juhtimine v\u00f5i - t\u00e4psemalt \u00f6eldes k\u00e4esoleva artikli teemaga seoses - ressursside planeerimise vahendite kasutamine). Ja iga\u00fcht neist optimeeritakse - mingil viisil - kogu protsessi v\u00e4ltel. Ressursside tasandamine on oluline tehnika, mida kasutatakse ressursside jaotamise tasakaalustamiseks ja \u00fcle- v\u00f5i alakasutuse v\u00e4ltimiseks projekti eluts\u00fckli jooksul.<\/p>\n\n\n\n<p>Tulles tagasi p\u00f5hiteema juurde, kus PMi eluts\u00fckli protsessis on ressursside kasutamine oluline?<\/p>\n\n\n\n<p>Protsessi viiest etapist v\u00f5ib ressursside kasutamine leida kolmandas etapis. J\u00e4relevalve- ja kontrollifaasi osana v\u00f5i t\u00e4psemalt \u00f6eldes tulemuslikkuse juhtimise osana.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>Algatamine ja kontseptsioon<\/p><\/li>\n\n\n\n<li><p>Planeerimine<\/p><\/li>\n\n\n\n<li><p>K\u00e4ivitamine ja t\u00e4itmine<\/p><\/li>\n\n\n\n<li><p>J\u00e4relevalve ja kontroll - <strong>see h\u00f5lmab j\u00f5udluse kontrollimist, st ressursside kasutamist.<\/strong><\/p><\/li>\n\n\n\n<li><p>Projekti l\u00f5petamine<\/p><\/li>\n<\/ul>\n\n\n\n<p>Juhtide jaoks on ressursside kasutamine k\u00f5ige v\u00e4\u00e4rtuslikum ja kasulikum m\u00f5\u00f5dik ja tulemusn\u00e4itaja tulemuslikkuse juhtimise raames.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1207\" height=\"803\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/24135020\/MeasuringUtilization1.jpeg\" alt=\"\" class=\"wp-image-13644\"\/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-the-most-valuable-metrics-in-performance-management-the-resource-utilization-and-resource-allocation\">K\u00f5ige v\u00e4\u00e4rtuslikumad m\u00f5\u00f5dikud tulemuslikkuse juhtimises - ressursside kasutamine ja ressursside jaotamine<\/h3>\n\n\n\n<p>Nagu me teame, on ressursside planeerimine ja ressursside ajaplaneerimine olulised, et tagada projektiplaani \u00f5itseng. Ressursside t\u00f5hus kasutamine on veel \u00fcks osa nendest m\u00f5istatustest, v\u00f5i - nagu me tahaksime \u00f6elda - ressursside juhtimine. Kui ressursside eraldamine t\u00e4hendab - lihtsustatult \u00f6eldes - kvalifitseeritud ressursi m\u00e4\u00e4ramist \u00fclesandele, siis ressursside kasutamine m\u00f5\u00f5dab t\u00f5husust ja selle ressursi poolt m\u00e4\u00e4ratud \u00fclesande ajal kulutatud aega (tasustatav v\u00f5i strateegiline t\u00f6\u00f6, mitte tasustatavad tunnid\/minutid, haldustunnid\/minutid jne).<\/p>\n\n\n\n<img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"909\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15003849\/Zrzut-ekranu-2022-04-7-o-09.46.06-1-1280x909.png\" alt=\"\" class=\"wp-image-13525\" srcset=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15003849\/Zrzut-ekranu-2022-04-7-o-09.46.06-1-1280x909.png 1280w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15003849\/Zrzut-ekranu-2022-04-7-o-09.46.06-1-300x213.png 300w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15003849\/Zrzut-ekranu-2022-04-7-o-09.46.06-1-768x545.png 768w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15003849\/Zrzut-ekranu-2022-04-7-o-09.46.06-1-18x12.png 18w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15003849\/Zrzut-ekranu-2022-04-7-o-09.46.06-1.png 1392w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/>\n\n\n\n<p>Ressursikasutus on n\u00e4itaja, mis aitab projektijuhtidel ja ressursijuhtidel teada saada, kuidas nende t\u00f6\u00f6tajad projekti ajal oma aega kulutavad. T\u00e4nu nendele teadmistele teevad nad palju t\u00f5husamaid otsuseid ressursside kasutamise kohta, mis suurendavad tootlikkust ja kasumlikkust. Ressursikasutus m\u00f5\u00f5dab iga t\u00f6\u00f6taja tootlikkust ja\/v\u00f5i kogu meeskonna kasutusm\u00e4\u00e4ra valemit. See j\u00e4lgib, kas teie t\u00f6\u00f6tajad on \u00fcle- v\u00f5i alakasutatud ja m\u00e4\u00e4rab kindlaks t\u00f6\u00f6koormuse juhtimise poliitika.<\/p>\n\n\n\n<p>T\u00e4psemalt \u00f6eldes on projektijuhtide ja ettev\u00f5tete vaatenurgast l\u00e4htudes ressursikasutuse m\u00e4\u00e4ra arvutamine termin, mida kasutatakse t\u00f6\u00f6taja vaba aja protsendi kirjeldamiseks, mida kasutatakse tasuliste \u00fclesannete v\u00f5i projektide jaoks. Ressursikasutuse m\u00e4\u00e4r n\u00e4itab, kui palju teie meeskonna ajast kulub tasulistele \u00fclesannetele, samuti seda, kui produktiivne on iga meeskonnaliige. Ressursside prognoosimine aitab projektijuhtidel prognoosida tulevasi ressursivajadusi praeguste kasutusn\u00e4itajate p\u00f5hjal.<\/p>\n\n\n\n<p>Teisis\u00f5nu, ressursside kasutamine on n\u00e4itaja, mis n\u00e4itab, kas kogu teie meeskond v\u00f5i konkreetsed t\u00f6\u00f6tajad on t\u00e4ielikult h\u00f5ivatud. See viitab projekti planeerimise protsessile ja ettev\u00f5tte olemasolevate ressursside maksimaalsele \u00e4rakasutamisele.<\/p>\n\n\n\n<p>N\u00e4iteks kui teate, et keegi on juba \u00fclekoormatud ja tal on lihtsalt liiga palju peas, v\u00f5ite otsida kedagi teist, kellel on sarnased oskused ja kes sobiks teie projekti. See m\u00f5\u00f5dik aitab tuvastada ka inimesi, kes on alakasutatud, nii et saate neile uusi projekte m\u00e4\u00e4rata.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1201\" height=\"793\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/24135020\/MeasuringUtilization3.jpeg\" alt=\"\" class=\"wp-image-13645\"\/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-justify\" id=\"h-how-to-calculate-resource-utilization-nbsp\"><strong>Kuidas arvutada ressursside kasutamist?&nbsp;<\/strong><\/h2>\n\n\n\n<p>Ainus viis selle v\u00e4ljaselgitamiseks on vaadata l\u00e4bi k\u00f5ik v\u00f5imalused ja valida see, mis sobib teie vajadustele k\u00f5ige paremini. Ressursside optimeerimise meetodid aitavad parandada teie ressursikasutuse arvutuste t\u00f5husust ja t\u00e4psust.<\/p>\n\n\n\n<p>T\u00fc\u00fcpiline ressursikasutuse valem on:<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center\" id=\"h-resource-utilization-rate-busy-time-available-time\"><strong><em>Ressursi kasutamise m\u00e4\u00e4r = h\u00f5ivatud aeg \/ olemasolev aeg<\/em><\/strong><\/h3>\n\n\n\n<p>See v\u00e4\u00e4rtus, mida v\u00e4ljendatakse protsentides, n\u00e4itab, kui palju teie meeskonna t\u00f6\u00f6ajast kulub t\u00f6\u00f6le.<\/p>\n\n\n\n<p>Kuigi see k\u00f5lab lihtsana, tekib ressursside kasutamise m\u00f5\u00f5tmisel mitmeid k\u00fcsimusi. Kas peaksite arvutuste aluseks v\u00f5tma tegeliku t\u00f6\u00f6aja (<a rel=\"noopener noreferrer\" href=\"https:\/\/teamdeck.io\/et\/projektijuhtimine\/tooajatabelite-haldamine\/\">ajalehed<\/a>) v\u00f5i hoopis planeeritud t\u00f6\u00f6aeg? Kuidas on lood puhkuste ja <a rel=\"noopener noreferrer\" href=\"https:\/\/teamdeck.io\/et\/juhtimine\/tasulise-vaba-aja-poliitika-jalgimine\/\">tasuline vaba aeg<\/a>? Kui tihti peaksite oma meeskonna ressursikasutusplaani ikkagi j\u00e4lgima? H\u00e4sti m\u00e4\u00e4ratletud ressursside jaotamise strateegia v\u00f5ib oluliselt m\u00f5jutada teie ressursikasutusm\u00e4\u00e4ra arvutuste t\u00e4psust.<\/p>\n\n\n\n<img decoding=\"async\" src=\"https:\/\/teamdeck.io\/wp-content\/uploads\/2024\/06\/Zrzut-ekranu-2022-04-6-o-09.40.24-2-2.png\" alt=\"Luua aktiivsete projektide ressursikasutuse m\u00e4\u00e4r, et suurendada tootlikkuse andmeid\"\/>\n\n\n\n<p>Vastus on: see s\u00f5ltub. Muutujaid on nii palju, et on praktiliselt v\u00f5imatu soovitada universaalselt head lahendust. Ainus viis selle v\u00e4ljaselgitamiseks on vaadata l\u00e4bi k\u00f5ik v\u00f5imalused ja valida see, mis sobib teie vajadustele k\u00f5ige paremini.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-justify\" id=\"h-compare-bookings-with-your-team-s-availability\"><strong>V\u00f5rdle broneeringuid oma meeskonna k\u00e4ttesaadavusega<\/strong><\/h2>\n\n\n\n<p>\u00dcks viis ressursside kasutamise m\u00f5\u00f5tmiseks on v\u00f5rrelda nende k\u00e4ttesaadavust kavandatud t\u00f6\u00f6ajaga.<\/p>\n\n\n\n<p>T\u00f5hus ressursside planeerimine on oluline, et tagada broneeringute vastavus meeskonna k\u00e4ttesaadavusele.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center\" id=\"h-resource-utilization-planned-working-hours-bookings-available-hours\"><strong><em>Ressursside kasutamine = planeeritud t\u00f6\u00f6tunnid (broneeringud) \/ olemasolevad t\u00f6\u00f6tunnid<\/em><\/strong><\/h3>\n\n\n\n<img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"667\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15004029\/Zrzut-ekranu-2022-04-6-o-09.40.24-2-1280x667.png\" alt=\"\" class=\"wp-image-13528\" srcset=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15004029\/Zrzut-ekranu-2022-04-6-o-09.40.24-2-1280x667.png 1280w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15004029\/Zrzut-ekranu-2022-04-6-o-09.40.24-2-300x156.png 300w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15004029\/Zrzut-ekranu-2022-04-6-o-09.40.24-2-768x400.png 768w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15004029\/Zrzut-ekranu-2022-04-6-o-09.40.24-2-1536x800.png 1536w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15004029\/Zrzut-ekranu-2022-04-6-o-09.40.24-2-2048x1067.png 2048w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/15004029\/Zrzut-ekranu-2022-04-6-o-09.40.24-2-18x9.png 18w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/>\n\n\n\n<p>Selle meetodi peamine eelis on see, et kui skoor on liiga madal, saate oma plaane siiski optimeerida. P\u00f6\u00f6rduge oma ajakava poole ja vaadake, kas teie projektid on \u00f5igesti planeeritud. P\u00f5hjalik ressursside jaotamise plaan aitab tagada, et k\u00f5iki ressursse kasutatakse t\u00f5husalt ja l\u00fcngad on minimeeritud. V\u00f5ib-olla on m\u00f5ne inimese broneeringutes l\u00fcngad v\u00f5i on teil n\u00e4iteks kaks arendajat, kes t\u00f6\u00f6tavad 4 tundi n\u00e4dalas \u00fche projekti kallal, kuigi v\u00f5iks olla 1 inimene, kes t\u00f6\u00f6tab selle kallal t\u00e4ist\u00f6\u00f6ajaga?<\/p>\n\n\n\n<p>Leidke v\u00e4lja, kuidas saate oma meeskonna ajakavas olevaid l\u00fcnki t\u00e4ita. V\u00f5ib-olla peaksite alustama teadus- ja arendusprojektiga v\u00f5i kehtestama innovatsioonivaba aja? See ei aita teil mitte ainult v\u00e4ltida tootlikkuse v\u00e4henemist, vaid on ka hea viis, kuidas hoida inimesi kaasatuna. <a rel=\"noopener noreferrer\" href=\"https:\/\/hackernoon.com\/having-too-little-to-do-makes-people-unhappy-8afa21ea098e\">Alakasutamine on teie t\u00f6\u00f6tajate jaoks masendavam, kui te arvata oskate.<\/a>.<\/p>\n\n\n\n<p>J\u00e4lgige, et inimestel oleks liiga palju asju. On oht, et nad ei saa oma \u00fclesandeid \u00f5igeaegselt t\u00e4ita (lisaks ei taha, et nad oleksid kurnatud). Nende \u00fclekoormus v\u00f5ib viidata sellele, et teil on vaja palgata uusi meeskonnaliikmeid.<\/p>\n\n\n\n<p>L\u00f5puks on hinnangulise ressursikasutuse arvutamine lihtne viis, kuidas teie m\u00fc\u00fcgimeeskond n\u00e4eb, kui palju ruumi on tootmisliinis veel j\u00e4\u00e4nud. Nii on v\u00e4hem t\u00f5en\u00e4oline, et j\u00e4tate \u00e4riv\u00f5imalused kasutamata (v\u00f5i v\u00f5tate endale kohustusi seoses projektidega, mida te p\u00f5him\u00f5tteliselt ei suuda \u00f5igeaegselt t\u00e4ita).<\/p>\n\n\n\n<p>Kokkuv\u00f5ttes aitab broneeringup\u00f5hise ressursikasutuse skoori anal\u00fc\u00fcsimine optimeerida ja parandada ressursside kasutamist ja jaotamist ning prognoosida m\u00fc\u00fcgi- v\u00f5i v\u00e4rbamisvajadusi.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"2024\" height=\"1338\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/24142226\/ProjectOnboarding8.jpg\" alt=\"\" class=\"wp-image-13619\"\/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-justify\" id=\"h-compare-timesheets-with-your-team-s-availability\"><strong>V\u00f5rrelda t\u00f6\u00f6ajatabelid oma meeskonna k\u00e4ttesaadavusega<\/strong><\/h2>\n\n\n\n<p>Teine viis ressursside m\u00f5\u00f5tmiseks ja optimaalse kasutusm\u00e4\u00e4ra saavutamiseks on v\u00f5rrelda oma meeskonna registreeritud t\u00f6\u00f6tunde (t\u00f6\u00f6ajatabelid) nende k\u00e4ttesaadavate t\u00f6\u00f6tundidega. Paljud usuvad, et see on ainus viis, kuidas t\u00e4pselt n\u00e4idata, kuidas ressursi kasutamist arvutada, sest te t\u00f6\u00f6tate tegelike t\u00f6\u00f6tundide, mitte ainult hinnanguliste tundide alusel. Ressursside j\u00e4lgimine on oluline ressursside kasutamise t\u00e4pseks j\u00e4lgimiseks ja registreerimiseks aja jooksul.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center\" id=\"h-resource-utilization-recorded-working-hours-available-hours\"><strong><em>Ressursside kasutamine = registreeritud t\u00f6\u00f6tunnid \/ olemasolevad t\u00f6\u00f6tunnid<\/em><\/strong><\/h3>\n\n\n\n<p>Paljud inimesed usuvad, et see on ainus viis, kuidas t\u00e4pselt n\u00e4idata, kuidas arvutada ressursikasutust, sest te t\u00f6\u00f6tate tegelike t\u00f6\u00f6tundide, mitte ainult hinnangute alusel.<\/p>\n\n\n\n<p>Kuna tegemist on tagantj\u00e4rele saadud tulemusega, ei saa te tavaliselt kahju tagasi teha, isegi kui teie tulemus on pettumust valmistav. See aitab teil aga tulevikus paremaid otsuseid teha.<\/p>\n\n\n\n<img loading=\"lazy\" decoding=\"async\" width=\"2542\" height=\"1324\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/23223407\/MeasuringUtilization4.png\" alt=\"\" class=\"wp-image-13646\" srcset=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/23223407\/MeasuringUtilization4.png 2542w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/23223407\/MeasuringUtilization4-300x156.png 300w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/23223407\/MeasuringUtilization4-1280x667.png 1280w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/23223407\/MeasuringUtilization4-768x400.png 768w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/23223407\/MeasuringUtilization4-1536x800.png 1536w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/23223407\/MeasuringUtilization4-2048x1067.png 2048w, https:\/\/cdn.teamdeck.io\/uploads\/website\/2024\/06\/23223407\/MeasuringUtilization4-18x9.png 18w\" sizes=\"auto, (max-width: 2542px) 100vw, 2542px\" \/>\n\n\n\n<p>Ajaloolised andmed meeskonnaressursside kasutamise kohta on erinevad ja v\u00f5ivad olla heaks indikaatoriks selle kohta, kas teil on vaja palgata t\u00e4iendavaid inimesi (v\u00f5i leida olemasolevatele meeskonnaliikmetele t\u00e4iendavaid \u00fclesandeid). Samuti saate kontrollida, kui produktiivsed teie t\u00f6\u00f6tajad kipuvad olema.<\/p>\n\n\n\n<p>Minu soovitus oleks kasutada m\u00f5lemat ressursikasutuse arvutamise meetodit. V\u00f5rrelge tegelikku (registreeritud) kasutust hinnangulise kasutusega (mis p\u00f5hineb broneeringutel) ja anal\u00fc\u00fcsige erinevusi. Need v\u00f5ivad osutada t\u00f6\u00f6koormuse hindamise probleemidele v\u00f5i projektijuhtimise probleemidele. Kontrollige, kas on inimesi v\u00f5i projekte, mis on korduvalt \u00fcle v\u00f5i alla nende hinnangulise kasutusarvu. Selline anal\u00fc\u00fcs v\u00f5imaldab teil m\u00e4rgata parendusvaldkondi ja v\u00f5tta meetmeid. Ressursikasutuse anal\u00fc\u00fcs aitab projektijuhtidel m\u00f5ista mustreid ja teha tulevaste projektide jaoks andmep\u00f5hiseid otsuseid.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-justify\" id=\"h-how-to-define-availability-and-why-it-s-important-for-the-results-of-resource-utilization-nbsp\"><strong>Kuidas defineerida \"k\u00e4ttesaadavust\" ja miks see on oluline ressursside kasutamise tulemuste jaoks?&nbsp;<\/strong><\/h2>\n\n\n\n<p>N\u00fc\u00fcd, kui te teate erinevaid ressursside kasutamise arvutamise valemeid, on aeg teha asju veidi keerulisemaks. Siiani oleme kasutanud terminit \"olemasolevad tunnid\". Aga mida see \u00fcldse t\u00e4hendab? Kas te peaksite m\u00f5tlema, et k\u00e4ttesaadavus on aeg, mille jooksul teie t\u00f6\u00f6taja oli t\u00f6\u00f6l? V\u00f5i peaksite kaasama ka puhkused ja riigip\u00fchad?<\/p>\n\n\n\n<p>Esmalt v\u00f5ib arvata, et vaba aja kaasamine \u00fcldk\u00e4ttesaadavusse on vastun\u00e4idustatud, l\u00f5ppude l\u00f5puks ei olnud inimesed ilmselgelt <em>saadaval<\/em> siis. Arvestage aga sellega, et kui t\u00f6\u00f6tate fikseeritud palgaga, peate oma t\u00f6\u00f6tajatele selle aja eest ikkagi h\u00fcvitist maksma.<\/p>\n\n\n\n<p>T\u00f6\u00f6andjana v\u00f5iksite n\u00e4ha, kui palju aega teie meeskonnaliikmed tegelikult t\u00f6\u00f6ga tegelevad. Kui otsustate arvestada arvutustes ka vaba aega, pidage meeles, et teie meeskonna ressursside ideaalne kasutusm\u00e4\u00e4r v\u00f5ib olla puhkuse tippkuudel (detsembris ja augustis) oluliselt madalam. Ressursside kasutatavuse planeerimine aitab tagada, et teil on vajaduse korral \u00f5iged ressursid k\u00e4ttesaadavad, isegi puhkuse tipptundidel.<\/p>\n\n\n\n<p>M\u00f5ned ettev\u00f5tted kasutavad 2080 tundi fikseeritud tundide arvuna (52 n\u00e4dalat * 40 tundi). Teised arvutavad tegeliku t\u00f6\u00f6aja arvu antud aastal. Kui soovite teostada keerukamat filtreerimist (nt lisada puhkusep\u00e4evad, j\u00e4tta v\u00e4lja pangap\u00e4evad, v\u00f5tta arvesse <a rel=\"noopener noreferrer\" href=\"https:\/\/teamdeck.io\/et\/projektijuhtimine\/osalise-tooajaga-tootajate-juhtimine\/\">osalise t\u00f6\u00f6ajaga t\u00f6\u00f6tajad<\/a>), peaksite kaaluma ressursihaldustarkvara kasutamist.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-justify\" id=\"h-productive-utilization-and-billable-resource-utilization\"><strong>Tootlik kasutamine ja tasuline ressursi kasutamine<\/strong><\/h2>\n\n\n\n<p>Kui teie \"vaba aja\" m\u00e4\u00e4ratlus on valmis, peaksite kaaluma, mida te nimetate \"t\u00f6\u00f6ajaks\". Kas te r\u00e4\u00e4gite k\u00f5igist tundidest, mida teie t\u00f6\u00f6tajad kulutavad t\u00f6\u00f6ga seotud tegevustele, nt siseprojekti loomisele? V\u00f5i hoopis tundidest, mida nad veedavad t\u00f6\u00f6tades asjadega, mille eest saate oma klientidele tasu k\u00fcsida.<\/p>\n\n\n\n<p>Saate arvutada nn \"produktiivset kasutust\", mis v\u00f5tab arvesse k\u00f5iki h\u00f5ivatud tunde, ja \"tasulist kasutust\". Teine on eriti v\u00e4\u00e4rtuslik agentuuride, konsultatsioonifirmade v\u00f5i tarkvarafirmade jaoks: ettev\u00f5tted, kes t\u00f6\u00f6tavad oma klientide jaoks projektide kallal. Arveldatava kasutuse abil saate m\u00f5\u00f5ta, kui palju aega p\u00fchendavad teie t\u00f6\u00f6tajad t\u00f6\u00f6le, mis tegelikult tasub. Ressursside arvete esitamine on \u00fclioluline kliendiprojektide arvestatavate tundide j\u00e4lgimiseks ja haldamiseks.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-justify\" id=\"h-measure-resource-utilization-in-real-time\"><strong>M\u00f5\u00f5tke ressursside kasutamist reaalajas<\/strong><\/h2>\n\n\n\n<p>Teil v\u00f5ib olla kindel valem, mida kasutate ressursside k\u00e4ttesaadavuse ja kasutamise m\u00f5\u00f5tmiseks, kuid peate arvestama pidevalt muutuvate andmetega. Inimeste tulevane k\u00e4ttesaadavus muutub iga kord, kui nad paluvad vaba p\u00e4eva v\u00f5i j\u00e4\u00e4vad haigeks, mis m\u00f5jutab ka teie broneeringuid.<\/p>\n\n\n\n<p>On p\u00f5hjust arvata, et teie andmeid tuleks korrap\u00e4raselt ajakohastada ja ka teie meeskonna kasutusskoori tuleks kohandada reaalajas. K\u00f5ige lihtsam viis selle \u00fcleval hoidmiseks oleks kasutada ressursihaldustarkvara. Reaalajas toimuv ressursside juhtimine v\u00f5imaldab d\u00fcnaamiliselt kohandada ressursside jaotust jooksvate andmete p\u00f5hjal. Me oleme loonud Teamdecki kui ressursside haldamise t\u00f6\u00f6riista, mis suudab automatiseerida teie j\u00f5upingutusi, et te saaksite keskenduda oma <a rel=\"noopener noreferrer\" href=\"https:\/\/teamdeck.io\/et\/projektijuhtimine\/projektijuht-vs-ressursijuht\/\">projektijuhtimise \u00fclesanded.<\/a><\/p>\n\n\n\n<img decoding=\"async\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/15175323\/team_utilization.png\" alt=\"Reaalajas kasutamisaruanded ressursihalduritele\"\/>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-justify\" id=\"h-how-does-the-resource-management-software-help-with-resource-utilization\"><strong>Kuidas aitab ressursihaldustarkvara ressursside kasutamisel?<\/strong><\/h2>\n\n\n\n<p>Teamdeck kasutab arvutustes kolme liiki andmepunkte:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><p>k\u00e4ttesaadavus (samuti vaba aeg v\u00f5i puhkep\u00e4evad),<\/p><\/li>\n\n\n\n<li><p>broneeringud (kavandatud t\u00f6\u00f6aeg),<\/p><\/li>\n\n\n\n<li><p>t\u00f6\u00f6ajatabelid (registreeritud t\u00f6\u00f6tunnid).<\/p><\/li>\n<\/ul>\n\n\n\n<img decoding=\"async\" src=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/15175244\/measure_resource_utilization.png\" alt=\"J\u00e4lgige ressursside kasutamist Teamdeckiga\"\/>\n\n\n\n<p>Nii saate arvutada nii hinnangulise kui ka tegeliku meeskonnakasutuse ja neid seej\u00e4rel v\u00f5rrelda. Selle tarkvaraga on kaasas aruandluspakett, mis v\u00f5imaldab teil oma andmeid visualiseerida ja jagada neid \u00fcksikute meeskonnaliikmetega (v\u00f5i kliendiga). Ressursihaldust\u00f6\u00f6riistad pakuvad p\u00f5hjalikke funktsioone ressursside kasutamise j\u00e4lgimiseks, anal\u00fc\u00fcsimiseks ja optimeerimiseks.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-center\" id=\"h-looking-for-software-that-helps-with-resource-utilization\"><strong>Otsite tarkvara, mis aitab ressursside kasutamisel?<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center\" id=\"h-effective-resource-utilization-thanks-to-teamdeck-io\">T\u00f5hus ressursside kasutamine t\u00e4nu Teamdeck.io'le<\/h3>","protected":false},"excerpt":{"rendered":"Ettev\u00f5tted teevad tavaliselt palju j\u00f5upingutusi ressursside eraldamiseks. Te soovite, et k\u00f5ik oleksid h\u00f5ivatud, tagades samal ajal, et nende \u00fclesanded on ettev\u00f5tte jaoks v\u00e4\u00e4rtuslikud (mis sageli t\u00e4hendab, et need on tasulised). See muutub t\u00f5eliselt keeruliseks, kui teie meeskond...","protected":false},"author":6,"featured_media":8529,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22,39],"tags":[47],"class_list":["post-3892","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management","category-teamdeck","tag-resource-utilization"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v23.8 (Yoast SEO v24.3) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Resource Utilization - How Project Managers Measure It?<\/title>\n<meta name=\"description\" content=\"How do you know if you\u2019ve allocated resources at your organization successfully? Here are some ideas to help you measure resource utilization.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teamdeck.io\/et\/projektijuhtimine\/kuidas-moota-ressursside-kasutamist\/\" \/>\n<meta property=\"og:locale\" content=\"et_EE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to Measure Resource Utilization? - Teamdeck.io\" \/>\n<meta property=\"og:description\" content=\"How do you know if you\u2019ve allocated resources at your organization successfully? Here are some ideas to help you measure resource utilization.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teamdeck.io\/et\/projektijuhtimine\/kuidas-moota-ressursside-kasutamist\/\" \/>\n<meta property=\"og:site_name\" content=\"Teamdeck\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/helloteamdeck\" \/>\n<meta property=\"article:published_time\" content=\"2024-06-24T07:31:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-01-23T20:35:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/15175122\/how-to-measure-resource-utilization.png\" \/>\n<meta name=\"author\" content=\"Ania Kitowska\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"How to Measure Resource Utilization? - Teamdeck.io\" \/>\n<meta name=\"twitter:description\" content=\"How do you know if you\u2019ve allocated resources at your organization successfully? Here are some ideas to help you measure resource utilization.\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/15175122\/how-to-measure-resource-utilization.png\" \/>\n<meta name=\"twitter:creator\" content=\"@helloteamdeck\" \/>\n<meta name=\"twitter:site\" content=\"@helloteamdeck\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ania Kitowska\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/\",\"url\":\"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/\",\"name\":\"Resource Utilization - How Project Managers Measure It?\",\"isPartOf\":{\"@id\":\"https:\/\/teamdeck.io\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/17161903\/How-to-Measure-Resource-Utilization-1.jpeg\",\"datePublished\":\"2024-06-24T07:31:34+00:00\",\"dateModified\":\"2025-01-23T20:35:33+00:00\",\"author\":{\"@id\":\"https:\/\/teamdeck.io\/#\/schema\/person\/38139dc474576295e51cfae1580d697e\"},\"description\":\"How do you know if you\u2019ve allocated resources at your organization successfully? Here are some ideas to help you measure resource utilization.\",\"breadcrumb\":{\"@id\":\"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#breadcrumb\"},\"inLanguage\":\"et\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#primaryimage\",\"url\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/17161903\/How-to-Measure-Resource-Utilization-1.jpeg\",\"contentUrl\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/17161903\/How-to-Measure-Resource-Utilization-1.jpeg\",\"width\":1469,\"height\":981,\"caption\":\"Helping project managers to calculate resource utilization\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/teamdeck.io\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to Calculate Resource Utilization: A Guide for Project Managers\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/teamdeck.io\/#website\",\"url\":\"https:\/\/teamdeck.io\/\",\"name\":\"Teamdeck\",\"description\":\"resource scheduling + time tracking + leave management\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/teamdeck.io\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"et\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/teamdeck.io\/#\/schema\/person\/38139dc474576295e51cfae1580d697e\",\"name\":\"Ania Kitowska\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"et\",\"@id\":\"https:\/\/teamdeck.io\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113607\/aniaprofil%C3%B3wka-150x150.jpg\",\"contentUrl\":\"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113607\/aniaprofil%C3%B3wka-150x150.jpg\",\"caption\":\"Ania Kitowska\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Resource Utilization - How Project Managers Measure It?","description":"How do you know if you\u2019ve allocated resources at your organization successfully? Here are some ideas to help you measure resource utilization.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teamdeck.io\/et\/projektijuhtimine\/kuidas-moota-ressursside-kasutamist\/","og_locale":"et_EE","og_type":"article","og_title":"How to Measure Resource Utilization? - Teamdeck.io","og_description":"How do you know if you\u2019ve allocated resources at your organization successfully? Here are some ideas to help you measure resource utilization.","og_url":"https:\/\/teamdeck.io\/et\/projektijuhtimine\/kuidas-moota-ressursside-kasutamist\/","og_site_name":"Teamdeck","article_publisher":"https:\/\/www.facebook.com\/helloteamdeck","article_published_time":"2024-06-24T07:31:34+00:00","article_modified_time":"2025-01-23T20:35:33+00:00","og_image":[{"url":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/15175122\/how-to-measure-resource-utilization.png","type":"","width":"","height":""}],"author":"Ania Kitowska","twitter_card":"summary_large_image","twitter_title":"How to Measure Resource Utilization? - Teamdeck.io","twitter_description":"How do you know if you\u2019ve allocated resources at your organization successfully? Here are some ideas to help you measure resource utilization.","twitter_image":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/15175122\/how-to-measure-resource-utilization.png","twitter_creator":"@helloteamdeck","twitter_site":"@helloteamdeck","twitter_misc":{"Written by":"Ania Kitowska","Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/","url":"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/","name":"Resource Utilization - How Project Managers Measure It?","isPartOf":{"@id":"https:\/\/teamdeck.io\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#primaryimage"},"image":{"@id":"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#primaryimage"},"thumbnailUrl":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/17161903\/How-to-Measure-Resource-Utilization-1.jpeg","datePublished":"2024-06-24T07:31:34+00:00","dateModified":"2025-01-23T20:35:33+00:00","author":{"@id":"https:\/\/teamdeck.io\/#\/schema\/person\/38139dc474576295e51cfae1580d697e"},"description":"How do you know if you\u2019ve allocated resources at your organization successfully? Here are some ideas to help you measure resource utilization.","breadcrumb":{"@id":"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#breadcrumb"},"inLanguage":"et","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/"]}]},{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#primaryimage","url":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/17161903\/How-to-Measure-Resource-Utilization-1.jpeg","contentUrl":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2018\/03\/17161903\/How-to-Measure-Resource-Utilization-1.jpeg","width":1469,"height":981,"caption":"Helping project managers to calculate resource utilization"},{"@type":"BreadcrumbList","@id":"https:\/\/teamdeck.io\/project-management\/how-to-measure-resource-utilization\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/teamdeck.io\/"},{"@type":"ListItem","position":2,"name":"How to Calculate Resource Utilization: A Guide for Project Managers"}]},{"@type":"WebSite","@id":"https:\/\/teamdeck.io\/#website","url":"https:\/\/teamdeck.io\/","name":"Teamdeck","description":"resource scheduling + time tracking + leave management","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teamdeck.io\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"et"},{"@type":"Person","@id":"https:\/\/teamdeck.io\/#\/schema\/person\/38139dc474576295e51cfae1580d697e","name":"Ania Kitowska","image":{"@type":"ImageObject","inLanguage":"et","@id":"https:\/\/teamdeck.io\/#\/schema\/person\/image\/","url":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113607\/aniaprofil%C3%B3wka-150x150.jpg","contentUrl":"https:\/\/cdn.teamdeck.io\/uploads\/website\/2017\/09\/25113607\/aniaprofil%C3%B3wka-150x150.jpg","caption":"Ania Kitowska"}}]}},"_links":{"self":[{"href":"https:\/\/teamdeck.io\/et\/wp-json\/wp\/v2\/posts\/3892","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teamdeck.io\/et\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teamdeck.io\/et\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teamdeck.io\/et\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/teamdeck.io\/et\/wp-json\/wp\/v2\/comments?post=3892"}],"version-history":[{"count":69,"href":"https:\/\/teamdeck.io\/et\/wp-json\/wp\/v2\/posts\/3892\/revisions"}],"predecessor-version":[{"id":13647,"href":"https:\/\/teamdeck.io\/et\/wp-json\/wp\/v2\/posts\/3892\/revisions\/13647"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teamdeck.io\/et\/wp-json\/wp\/v2\/media\/8529"}],"wp:attachment":[{"href":"https:\/\/teamdeck.io\/et\/wp-json\/wp\/v2\/media?parent=3892"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teamdeck.io\/et\/wp-json\/wp\/v2\/categories?post=3892"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teamdeck.io\/et\/wp-json\/wp\/v2\/tags?post=3892"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}